Project proposal, feasibility study report content



I. Content of the project proposal
1. Basic information of investors, including foreign name, registered country, legal address and legal representative's name, position and nationality.
2. The purpose of business should focus on the necessity and possibility of exporting foreign exchange and introducing technology.
3, business scope and scale, should emphasize the necessity of project construction, domestic and international demand and production of products, as well as the main sales areas of products.
4. Total investment refers to the sum of fixed funds and working capital that the project needs to invest.
5. Investment methods and sources of funds.
6. Production technology and main equipment, mainly indicating the advancement, applicability and reliability of technology and equipment, as well as important technical and economic indicators.
7. The required quantities and sources of main raw materials, water, electricity and gas transportation.
8. Number, composition and source of personnel.
9. Economic benefits, and highlight the arrangements for foreign exchange receipts and payments
Second, the content of the feasibility study report
1. Basic overview.
1 company name, legal address, purpose, business scope and scale;
2 Basic information of the investor, including the name, country of registration, legal address and legal representative's name, position and nationality;
3 Total investment, registered capital, capital contribution method and capital contribution period;
4 Operating period.
2. Product production arrangements and their basis. Forecast of a certain field situation at home and abroad, as well as the capacity of production equipment currently in existence and under construction in China.
3. Material supply arrangements and their basis.
4. Project address selection and its basis.
5. Selection of technical equipment and process and its basis.
6. Production organization and its basis.
7. Environmental pollution control and labor safety and sanitation facilities and their basis.
8. Construction method, construction schedule and basis.
9. Fund raising and its basis.
10. Foreign exchange receipts and payments arrangements and their basis.
11. Comprehensive analysis of technical and economic benefits.
12. State-owned assets assessment and approval; import equipment inquiry; environmental pollution assessment.