Engineering construction implementation plan
Part 1: Implementation plan for the construction of the green belt project of Xiqiao Expressway
In order to implement the spirit of the State Council's "Notice on Further Promoting the Construction of the National Green Passage Project", the task of greening the Xi'an Expressway Greening Project of the Green Passage of the city will be completed on time and in good quality and quantity. According to the "Master Plan for the Greening Forest Belt Project of the Main Road of Xi'an City", This embodiment is specifically formulated.
I. The significance of engineering construction
The construction of the Xi'an Expressway Green Passage Project is a major measure to implement the strategy of “Western Development and Xi'an Development”. It is an important part of the 9 trunk road green channel network projects implemented by the city and also improves the ecological environment. It is an important way to beautify the ancient city of Xi'an, improve the quality of life of urban and rural residents, and meet the sustainable development of society and economy. The implementation of this project will not only increase the green area of the city, reduce the pollution of various exhaust gases and dust to the atmosphere, but also promote the adjustment of the agricultural industry structure along the line and promote the healthy development of the two civilizations.
Second, the guiding ideology and principles of engineering construction
guiding ideology
To implement and protect the urban ecology by implementing the spirit of the instructions of General Secretary Jiang "recreating a beautiful and beautiful northwest region" and the request of Premier Zhu to "mobilize the broad masses of the people, plant trees and grass, and improve the ecological environment" With the environment as the center, we will build a high-standard and multi-effective ecological public welfare forest as a means to achieve beautiful mountains and rivers and promote urban and rural economic development, give full play to ecological, social and economic benefits, and promote the sustainable development of Xi'an's economic and social undertakings.
in principle
1. Adhere to the principle of unified planning, unified seed supply, and district organization implementation.
2. Adhere to the principle that land ownership is unchanged and that it is adjusted by districts, counties, townships and villages.
3. Adhere to the principle of combining appropriate land, quality first, greening and beautification.
4. Adhere to the country, the collective, and the individual together, whoever greens all, who invests and who benefits, who manages who benefits or does not plant the main tree, does not make the principle of no main forest.
Third, the main construction content
Construction scope
The Xi'an Expressway has a greening mileage of 42.6 kilometers, including 9 kilometers for Yanliang, 16.5 kilometers for Gaoling, 8.6 kilometers for Yongqiao and 8.5 kilometers for Linyi. The width of the forest frequency is 10 meters outside the barbed wire, and the total area of the forest belt is 1278 acres.
Construction period and tree planting requirements
1. Engineering tasks are completed by the end of March 20XX.
2. According to the principle of project construction, the tree species are arranged as follows: a row of eucalyptus trees planted 0.5 m outside the barbed wire, with a plant spacing of 3 m; 2 rows of poplar trees with 4 rows of poplar trees, with a row spacing of 2 m × 2 m. The poplar variety is 107 poplar and triploid Populus tomentosa, which are required to be planted in pure forest.
3. Seedling specifications: The seedling height is 3.5 meters or more, and the ground diameter is 2.5 cm or more. The growth is strong and straight, and there is no pest damage.
4. Planting requirements: use high-quality seedlings, dig large pits, plant large seedlings, plant spacing is in a "good" shape configuration. The planting pit size is 60×60×60 cm. Water the bottom of the plant before planting, and after planting, set a foot and water the roots to ensure that the seedlings sprout and survive. The trunk is whitened at 1.2 meters.
Seedling requirement
The project requires a total of 199,000 seedlings, including 171,000 poplar trees and 28,000 eucalyptus trees. The districts and counties are as follows:
1. The greening mileage of Yanliang District is 9 kilometers, and 42,000 seedlings are needed, including 36,000 poplar trees and 0.6 million eucalyptus trees.
2. Gaoling County has a greening mileage of 16.5 kilometers and requires 77,000 seedlings, including 66,000 poplar trees and 11,000 eucalyptus trees.
3. The greening mileage of Yanqiao District is 8.6 kilometers, and 40,000 seedlings are needed, including 34,300 poplar trees and 0.57 million eucalyptus trees.
4. The greening mileage of Linyi District is 8.5 kilometers, and 40,000 seedlings are needed, including 34,300 poplar trees and 0.57 million eucalyptus trees.
Fourth, the investment distribution plan
The project is an important part of the beautiful project of mountains and rivers, and it is also an important task of the green channel construction of the city. The project is organized and implemented by all districts and counties in accordance with the unified plan. The municipal finance grants appropriate financial subsidies, and subsidies for planting and management fees per kilometer. 35,000 yuan. In order to ensure the quality of the project, the seedlings are all provided by the city's modern integrated nursery.
The total investment of the project is 3 million yuan, of which the seedling fee is 1,107,600 yuan, the district and county planting and management subsidy is 1.491 million yuan, the technical guidance fee is 60,000 yuan, the supervision fee is 70,000 yuan, the management fee is 50,000 yuan, and the design fee is 21,400 yuan. Unforeseen expenses of 200,000 yuan.
The subsidies for districts and sub-sections are as follows:
1. The greening mileage of Yanliang District is 9 kilometers, with an investment of 315,000 yuan.
2. Gaoling County has a greening mileage of 16.5 kilometers and an investment of 577,500 yuan.
3. The greening mileage of Yanqiao District is 8.6 kilometers with an investment of 301,000 yuan.
4. Linyi District has a greening mileage of 8.5 kilometers and an investment of 297,500 yuan.
V. Guarantee measures
Strengthen leadership and raise awareness
The relevant districts and counties should attach great importance to the construction of the green channel project of the Xiqiao Expressway. It is necessary to put this project on the important agenda. It is necessary to stand at the strategic height of the development of the western region and fully understand the significance of implementing this project. It is necessary to widely publicize and launch, organize all aspects of strength, and invest in the construction of the green channel project of Xiqiao Expressway, and strive to achieve new and better results.
Establish a sound technology and quality assurance system
The Municipal Forestry Bureau will draw 6-8 professional and technical personnel from the municipal forestry station to form technical guidance and quality supervision team, responsible for technical guidance, seedling evaluation and quality supervision. All districts and counties must establish corresponding institutions, and under the guidance of the city's supervisors, earnestly grasp the quality of the project. It is necessary to follow the procedure of burying the planting pit first, and then transferring the seedlings and planting after the experience is passed. It is strictly forbidden to organize the pits and planting after the seedlings are transported. It must be done on the same day, transported on the same day, and planted on the same day. After planting, water the roots to ensure that the seedlings survive.
Seriously check and accept, and actively implement the implementation
All districts and counties should do all the preparatory work for construction such as ideological launching and land adjustment before the end of February. In early March, the people were mobilized and planting activities were carried out to ensure that tasks were completed on time. At the end of June 20XX, the city will organize relevant departments to carry out inspection and acceptance, reward and reward the completion of the completion; notify the completion of the poor criticism, complete the task within a time limit, and hold the relevant leaders responsible. After the inspection and acceptance, for the sections with low survival rate, the districts and counties must be replanted in the autumn, and no subsidies will be given in the city. Regardless of any form of land, it is strictly forbidden to interplant high-dry crops in forest belts to ensure planting results.
Establish management responsibility and consolidate afforestation results
All districts, counties, towns and towns shall, in light of their respective actualities, formulate practical and feasible management and protection measures and implement management and protection responsibilities. In the future, the county, township and village road greening land that the local government is responsible for can promote farmers' voluntary land acquisition, national emergence, individual contracting and afforestation management, and return of income, and implement the policy of who will benefit from forestation. It can also take the form of auction, contracting, anti-rental and reverse packaging to solve the project land. It is necessary to mobilize the enthusiasm of all parties to participate in the project construction by clarifying the property rights and clarifying the responsible persons, so as to consolidate the achievements of afforestation.
Part 2: Implementation plan for the “four virtues” project construction
In order to further strengthen the ideological and moral construction of our teachers and students, and promote the harmonious and healthy development of all our work,
According to the opinions of the county party committee and the county government on the implementation of the "four virtues" project to promote the moral construction of the citizens of the county and the spirit of the archives of the 20th [20XX] No.43, combined with the actual education of our township, this implementation plan was formulated.
First, the guiding ideology
We will conscientiously implement the spirit of the party's XX and XX X Plenary Sessions, adhere to the scientific development concept as the guiding principle, build a socialist core value system as the foundation, and focus on enhancing the sense of integrity and responsibility. In the next few years, the “Four German Projects” will be implemented in depth throughout the school to continuously strengthen the social morality, professional ethics, family virtues and personal moral education of teachers and students. Infiltrating the "Chinese Little Teachers' Professional Ethics" and the "School of Primary and Secondary School Students" into daily study and work life, transforming into conscious actions, guiding the teachers and students to develop good moral literacy and behavior habits, and to be healthy, harmonious and sustainable for our school. Development provides solid ideological support and spiritual support.
Second, the activity target requirements:
Taking the next three years as the "year of moral construction promotion", based on the reality of our hometown, we will extensively carry out the construction of "four virtue projects" with "Ed, Chengde, Xiaode, Rende" as the main contents, and strengthen the society of teachers and students in schools. Public morality, professional ethics, family virtues and personal moral education. Through the development of various forms of study and education and ethical practice activities, we advocate a group of advanced models, guide teachers and students to start from the self, start from the small things around us, learn from the role models, and “love and respect the students; Studying, rigorously dropping out of school; courageously innovating, making progress and making progress; indifferent to fame and fortune, high-spirited and high-spirited, the basic requirements penetrate into the daily study and work life, vigorously promote "dedication and dedication, honesty and trustworthiness, filial piety, love, help, and courage "Civilized fashion, develop good moral literacy and behavioral habits, and promote the harmonious development of school work.
Third, a sound institution
In order to carry out the "Four German Projects" in an effective and effective manner, we have effectively implemented the activities and achieved practical results. After research and decision, we established an activity leading group.
Team leader: Liu Xiangjun
Deputy Team Leader: Tang Wenfa Sun Xinze
Member:
Feng Shouliang Hao Hongzhen Zhang Guangmin Liu Yupo Gao Wenshen
Cui Jinchao Liu Cangzhu Hao Jijun Fan Chuanbo Duan Chuanqiang
Small countries have to set up corresponding organizations to lead the group.
Fourth, the implementation steps
According to the unified deployment and requirements of the superiors, the event was divided into four phases, which lasted for three years:
Learning mobilization stage
1. Hold a mobilization meeting, set up a leading organization, formulate a work plan, and sign the personal responsibility of the “four virtues project”.
2. Organize the spirit of learning the superior files, learn the traditional Chinese virtues and virtues, and concentrate on the study time of no less than 40 hours, and the personal study notes should be no less than 4,000 words.
3. Building learning content around the “four virtues”, writing experiences and learning exchanges.
4. Organize the sing of "Si De Ge" in the teachers and students of the whole school; advertise the slogan on the campus; distribute the proposal to all teachers and students, and concentrate on publicity and reporting.
Organizational implementation phase
1. Strengthening the construction of teachers' morality and style with the "five ones" activity
Carry out a reading experience with love and responsibility as the theme to test the learning results, so that they can learn to learn, learn to understand, and realize something.
Organize a keynote speech on "How to be a happy teacher", find happiness around you, and establish a model of teacher's morality around you.
Deepen a theme event. That is, the practice of “doing a happy teacher, comprehending a happy life”, through the democratic evaluation, student satisfaction evaluation, job announcement, teacher public commitment, professional ethics lectures and psychological counseling activities, stimulate the sense of responsibility and mission of teaching and educating people. Create a positive atmosphere for teachers to be positive.
Combined with the main line of school teaching, a series of teaching activities are carried out. Actively build a platform for teachers to display and develop themselves, help teachers improve their education and teaching level, promote professional growth, and enhance teachers' professional accomplishment.
A series of literary and sports activities will be held. Caring for the physical and mental health of faculty and staff, embodying the feelings of humanistic management, organizing faculty and staff to actively exercise the body during the big class, guiding the faculty and staff to constantly adjust their mentality, and ensuring that the faculty and staff are devoted to education and teaching with sufficient energy.
2. Carry out a series of themed education activities of “Mingde Slim and Love Practice” among the students.
Combining the moral education work of each school in our township, we will determine the theme of each month and form a new situation of moral education with the theme of "month and month, theme, week and week, and content every day." The theme of moral education in each month is:
November - Civilized Courtesy Month
A "four virtues" education theme class meeting was held. Each class has a variety of design styles, lively, easy-to-understand, and interesting, age-oriented theme class sessions, so that students can understand the content of the four German education and understand the significance of implementing the "four German project" activities.
Participate in the "Love Claims" action, organize students to claim a tree, a green space or a public facility in a school or individual, and use the rest days and holidays to carry out voluntary maintenance and management.
Hold the "Lei Feng Spirit with Me" series of practical activities: ask the children to start with the little things around them, give their parents a cup of tea on Sundays and holidays, wash their feet, make meals, make grateful gifts; use weekends or spare time , carry out "going into the nursing home, caring for the elderly" and "I offer love for the old teachers" to visit the condolence activities.
In conjunction with the National Security Education Week, in the last week of November, we launched “Safety with Me”,
“Create a safe campus” safety education activity.
December - the campus is full of civilized flowers
Carry out the "Green Guardian" action. Each class organizes a special issue report, actively promotes environmental protection knowledge, advocates energy conservation and emission reduction, low-carbon life, educates students to consciously protect the environment, save resources, beautify their hometown, and supervise and report on behaviors that damage the environment.
Students in each class carefully study the "One-day routine" and "Standards of Daily Behavior of Primary School Students", hold a knowledge contest, and moral education in the competition, so that students can understand their spiritual essence.
Carry out the "My Show" campaign. Organize a "pre-course song", "read a good book, sing a good song, be a good person", "Chinese classic reading", organize and watch civilized etiquette videos and other educational practice activities, educate students on civilized etiquette and behavioral habits, Make students develop noble ideological quality and good moral sentiment.
January 20XX - the most glorious work, the happiest reading
Carry out competitions for folding clothes, tying shoelaces, and sewing sandbags to educate students to be "hardworking and glorious, lazy and shameful."
Hold a good book recommendation activity, and recommend students to read good books on the basis of mobilizing students to read more books, reading books, taking notes, and writing experiences.
Hold a student parent meeting. Improve the parent committee system, actively expand the channels of moral education, and form an educational network of communication, cooperation between schools, families and society.
March-April 2019 - Appraisal of the month.
In order to carry out the evaluation of "star-class civilized class" and "star-class civilized students" activities as the carrier, the students' self-evaluation, mutual evaluation and teacher evaluation are combined to carry out the summary of moral education work.
Organize students to use the summer vacation to carry out activities that are rich and diverse and full of moral education.
Summary improvement phase
Conduct self-examination and summary of the activities, find the shortcomings, and formulate the next tasks.
Long-term mechanism
Further improve the "four German projects" system, deepen the construction of the "four German projects", establish a long-term mechanism for the construction of the "four German projects", and form a normalization of work.
V. Implementation requirements
Strengthen organizational leadership. The school set up an activity leading group to clarify work responsibilities. According to the implementation plan, strengthen measures, clarify objectives, select breakthrough openings and joint points to ensure the effective implementation of various tasks.
Improve the working mechanism and strengthen the assessment management. In combination with the actual situation of the school, the evaluation mechanism of teacher's morality will be further improved, and the "one-vote veto" of teacher's morality assessment will be strictly implemented, and supervision and inspection will be strengthened to standardize teachers' teaching behavior according to law.
Strengthen typical culture. Focus on cultivating and excavating moral models and advanced figures. The selection of “student like, colleague admiration, leadership satisfaction” teachers and students series of activity pacesetters, establish advanced models and create a good working atmosphere.
Part 3: Implementation plan for river dam construction
In order to effectively improve the flood control capacity of Xingguo County and ensure the safety of people's lives and property, according to the overall plan of "one city, three districts" and "three rivers and six banks", in order to ensure the order of the river dam project on both sides of the river, the plan is promoted in an orderly manner. This embodiment:
I. Project Overview
The construction of the dams on both banks of the Yangtze River, the dam construction area is above the Tongjiang River estuary, and the junction of the two rivers below. The dam is about 320 meters long and is constructed by flapping gates. The overall requirements for project construction are “strong flooding capacity, low investment costs, and the characteristics of rejuvenating the country”. The main work of the project construction includes:
1. Do a good job of verifying the land, graves and trees surrounding the dam, and delineate the scope of requisition.
2. Complete land acquisition, grave relocation and various tree transplanting and felling and cleaning of miscellaneous trees in the surrounding area of the dam site.
3. In accordance with the policy provisions and the relevant compensation standards already issued in the county, do a good job in the compensation and distribution of land acquisition, grave relocation, tree felling and transplanting.
4. Do a good job in the project's environmental impact assessment, soil and water conservation plan report and other related work.
5. Do other preparatory work for the barrage project.
6. Complete the preliminary design and technical design of the project and complete the drawing review work.
7. Project construction and project supervision bidding.
8. The construction team will enter the construction site.
9. Completion acceptance and operation of the project.
Second, the working organization
In order to ensure the smooth implementation of the project construction as soon as possible and smoothly, the county party committee office and the government office issued the "Notice on the establishment of a riverside dam project construction headquarters" on March 8th, which was clearly defined by the county party committee member and deputy county head. The Minister of Agriculture and Industry is the chief commander and is responsible for the overall work of the command department; the vice chairman of the county CPPCC is the deputy commander, responsible for the coordination, inspection, arrangement and use and management of the daily work and construction of the headquarters. The agencies under the command include:
1. Office:
Director: The presiding office is working in full.
Deputy Director: Responsible for the daily work, organization, coordination and inspection of the office, propose work plans and arrangements, and formulate work measures and plans.
Deputy Director: Responsible for the review of expenses, material procurement, fund request and financial accounting, and daily office affairs.
office staff:
Responsible for engineering quality and technical control, engineering quantity verification and project change review.
Responsible for the drafting of archives, materials, meeting preparation, work reception, uploading, seal management, report review, coordination and other work.
Assist and do related work.
2. Land acquisition and grave migration group:
Team leader:
Deputy head:
Member units: Land and Resources Bureau, Housing Management Bureau, Forestry Bureau, Town, Township, Industrial Park
Responsibilities: Responsible for land acquisition, grave relocation, tree transplanting and fund compensation review
3. Working technology group:
Team leader:
member:
Responsibilities: Responsible for the whole process of monitoring, verification, and verification of project changes.
Third, work arrangements and implementation steps
1. The county water conservancy bureau takes the lead and the city investment company cooperates to complete the dam site selection, survey and measurement, and feasibility study report preparation before April 20th;
2. The county development and reform commission takes the lead, and the water conservancy bureau and the city investment company cooperate to complete the feasibility study review and project establishment of the project before May 10;
3. The county city investment company takes the lead and the water conservancy bureau cooperates to implement and determine the preliminary design unit of the project before the end of April of the year. The initial design plan will be taken before June 10, and the initial review work will be completed before the end of June;
4. The county environmental protection bureau is responsible for completing the on-site monitoring and environmental impact assessment report preparation work of the project before May 30 of the year;
5. The County Water and Environmental Protection Bureau is responsible for completing the preparation of the project soil and water conservation plan report before May 30 of the year;
6. The County Land and Resources Bureau, the township, township, and industrial park management committees cooperate to complete the survey and scoping of land acquisition surveys around the dam before May 10, and complete the land requisition procedures before May 20, and distribute them before the end of May. Compensation for land acquisition funds;
7. The county housing management bureau, the township, township, and industrial park management committees cooperate to complete the investigation and verification of the graves around the dam and the selection of the new grave settlement site before May 20, and notify the grave owner to prepare for the relocation before June 10. The compensation for the relocation of the graves will be paid, and all the graves will be relocated before July 10;
8. The County Forestry Bureau is responsible for the verification of the forest felling and transplanting around the dam before May 15 of the year. The approval process will be completed before May 25, and the tree felling and transplanting will be completed before June 20;
9. The county investment company will take the lead in organizing relevant departments to complete the bidding work of the project before August 15 of the year, and determine the construction and construction unit, and sign the construction contract;
10. At the end of August, the construction team entered the site and the project was officially started.
11. The headquarters is responsible for the cooperation between the Water Resources Bureau and the City Head Company. The construction and construction unit is instructed to complete the first phase of the construction of the cofferdam diversion project before the end of October of the year. The river dam foundation and pump house civil works will be completed before the end of November. Dam construction, gate and pump room equipment installation, complete the second phase of the project before the end of January, complete the second phase of dam construction before the end of February, complete the second phase of the gate and pump room equipment installation before the end of March, before April 15 The project is completed;
12. Complete the project completion, inspection and handover before the end of June;
14. The headquarters office should conscientiously carry out preparations, tracking services, supervision and inspection work in the early, middle and late stages of the project construction according to the above-mentioned implementation steps, and increase the guidance and management of the project construction.
Fourth, the project budget and the use of funds
The project shall be constructed and constructed according to the design plan approved by the county government. The relevant departments of the city investment company shall be responsible for the project budget estimation, and the city investment company shall be responsible for the review and supervision and use.
V. Work measures and requirements
1. Strengthen leadership.
The personnel required to be dispatched in the command department are relatively stable, ensuring that they are in place, and that people are attentive, attentive, time-consuming, and energetic, and in accordance with their respective responsibilities, do a good job in the implementation of various tasks.
2. Grasp the progress.
All member units and working groups of the command department shall draw up a work flow chart according to the time schedule and work implementation plan requirements, and report the progress of the work in the current month to the headquarters before the 25th of each month, and submit the work arrangements and plans for the next month.
3. Strengthen scheduling.
In principle, the headquarters convened a work scheduling meeting once a week. The working groups reported on the work progress last week, coordinated the difficulties and problems in the progress of the project, and studied the deployment of this week's work plans and arrangements.
4. Clear responsibilities.
Each job is counted down to the count, the responsibility is refined to the member units, the task is implemented to the individual, the responsibility is clear, the method is right, the measures are appropriate, the program is in place, and the time limit is closed, and the headquarters office is responsible for supervision and inspection.
5. Coordination and cooperation.
All member units and working groups of the headquarters should work under the unified leadership of the command department, establish a global concept, support each other, closely cooperate, form a joint effort, and do a good job in all work.
6, the rewards and punishments are clear.
All member units and working groups of the command department should take the initiative to do their work according to their respective job responsibilities, timely handle and resolve various contradictions and disputes arising in the work, ensure the smooth progress of the project construction, and regard the work of each member unit and individual. The reward is awarded for the completion of the situation.
Part 4: Implementation plan for the construction of “Tianwang” project in Wendi Town
In order to create a harmonious and stable cultural environment, create a good investment environment, protect the lives and property of the people, improve the technical defense capabilities of our town, meet the needs of the town's public security control and urban management, and enhance the safety and satisfaction of the people. Through the study of the town party committee and government, it was decided to implement the construction of “Skynet” project. The specific implementation plan is as follows:
First, the guiding ideology
Guided by the scientific concept of development, with the goal of creating a peaceful and cultural relic, adhere to the government's leadership, multi-party cooperation, deepen the construction of the "Skynet" project, improve the level of scientific and technological precautions, and build a "play, defense, management, control, stability" Protect against the network. Efforts should be made to achieve the goals of low number of cases, good order, social stability, and people's satisfaction, and create a good social security environment for the rapid and stable development of the arts and culture and the people's livelihood.
Second, organizational leadership
In order to ensure the smooth development of the “Skynet” project construction, the “Tianwang” project construction leading group of Wendi Town was established. The list of its members is as follows:
Team leader: Chen Peng Town Party Secretary
Deputy Secretary of the Party Committee and Mayor of Huanghai Town
Deputy Team Leader: Deputy Secretary of the Party Committee of Huanghua Town, Chairman of the National People's Congress
He Haibo Town Party Committee Member, Deputy Mayor
Member: Tao Zonghai Deputy Secretary of the Party Committee
Mo Dongxia Deputy Secretary of the Party Committee
Huang Huanfu Vice Chairman of the Town People's Congress
Mo Yongmao Town Party Committee Propaganda Committee, Deputy Mayor
Deputy Mayor of Liulin Town Government
Huang Hedong Town Party Committee
Liang Kaishao Town Discipline Inspection Commission, Secretary of the Discipline Inspection Commission
Member of the Party Committee and Armed Minister of Lidong Town
Huang Zuyuan Town Party Committee United Front Committee
Xie Guojun, Director of Wendi Police Station
Huang Chengyu, Deputy Director of the Town Comprehensive Management Office
Huang Weiqiang, Head of Wendi Justice Office
Liu Shuyu, captain of the traffic police squadron
Liu Yuanan Town Finance Office Director
Liang Yunda Township Party Committee
Head of each unit in the town
The leading group has an office located at the Comprehensive Management Office. The director of the office is concurrently appointed by Huang Hua, responsible for daily affairs and organization and coordination. Tel: 8641555.
Third, the scope of implementation
Install high-density video in four directions in the southeast and northwest of the town, and cover all-weather video surveillance cameras in the densely populated areas, public security spots, high-incidence areas, bazaars, hotels, schools, and hospitals in the town. The video surveillance system established by each business outlets and various operating stores can access the “Tianwang” engineering system through optical fiber and other communication methods, and establish a “Skynet” monitoring platform for resource sharing as a social video surveillance resource.
Fourth, the implementation steps
The Skynet project is divided into three phases:
1. Mobilization stage: Establish a leading group and various working groups and other institutions, formulate the implementation plan of the “Skynet” project construction, promptly convene a special meeting of the leading group, conduct research and deployment, unify thinking, clarify responsibilities, strengthen coordination, and implement well. The town's social security video surveillance "Tianwang" project construction mobilization meeting was held to mobilize and deploy.
2. Preparation stage: Do a good job in the preliminary work. A comprehensive working group will be formed by the Comprehensive Management Office, the Public Security Bureau, the Traffic Police, the Electric Power, and the Urban Construction Department. The video surveillance points, the monitoring center line layout, and the power access will be planned and demonstrated. Please have qualified professional and technical personnel to formulate the construction design plan. Evaluate the budget, select the construction and installation company, and sign the project construction contract.
3. Construction stage: According to the arrangement of the “Tianwang” project leading group, it should be carefully organized according to the requirements of planning and design plan to ensure the construction quality. Relevant enterprises and institutions should coordinate and cooperate, fully support and ensure that the project is completed on schedule. After the completion of the project, the “Tianwang” project construction leading group will organize the acceptance.
V. Source of funds
In accordance with the principle of “who benefits and who invests”, the “Skynet” project system is established. Road monitoring, public space monitoring engineering construction, monitoring platform construction as a social welfare undertaking, its system construction costs, maintenance costs for higher-level funding to solve part of the funds, most of the funds are still mobilized by social forces to donate sponsorship, donations include: industrial enterprises , all breeding farms, shops in the town of Shangyu, residents, and units in the town and cadres and workers. Administrative enterprises, institutions, finance, insurance, schools, shopping malls, supermarkets, Internet cafes, hotels, key units, etc., the construction costs and maintenance costs of their own video surveillance systems and anti-theft alarm systems shall be borne by the unit.
6. Division of responsibilities
1. The “Tianwang” Leading Group Office is the lead unit of the “Skynet” project construction, responsible for planning, organizing, coordinating and implementing the project. It is necessary to strengthen supervision and inspection, actively and relevant units to study and formulate the implementation plan for the construction of “Tianwang” project, deploy in the whole town, organize supervision and hold dispatching meetings, etc., promote the work in depth, widely publicize and launch, create momentum and improve various units. Participate in the enthusiasm of the "Skynet" project; master the work schedule and establish the "Tianwang" project construction ledger.
2. Police station: In accordance with the mission requirements of the “Tianwang” project construction leading group, actively communicate with communications, power, urban construction and other units to complete the construction of monitoring platform and road monitoring. Provide technical solutions and standards to the leadership team and participate in the acceptance of each monitoring system project.
3. Communication department: Make full use of communication resources and technical advantages, and be responsible for providing optical network resources for the “Tianwang” project, and construct a cultural and residential monitoring metropolitan area network. When the conditions are ripe, the monitoring system of each unit will be connected to the “Tianwang” project monitoring platform of the text. When the communication network fails or has problems, it will be sent to the person for repair and repaired in the shortest time.
4. Power department: responsible for providing power access supply and guarantee to the “Tianwang” project; unified exemption of the electricity fee for the public monitoring system.
5. Urban Construction Department: Responsible for providing the urban construction planning and the situation around the monitoring point to the “Tianwang” project construction leading group to assist in determining the installation location of the surveillance camera.
Seven, safeguard measures
1. Strengthen leadership and careful deployment. The construction of the "Skynet" project is an important measure to meet the new requirements and new expectations of the people, and is an effective way to further improve the prevention and control capabilities of the town. All units and departments must attach great importance to it and put it into the important agenda. The main leaders must personally ask questions, fully support them, and the leaders in charge should be specifically responsible and implement them.
2. Strengthen cooperation and cooperation to form synergy. The "Skynet" project is a huge project involving a wide range of tasks. The tasks are arduous and arduous. All units and departments must strengthen contact and communication. They should perform their duties and responsibilities, and regularly exchange information, research and solve problems. New situations and new problems encountered in the work, and strive to form the joint force of the "Skynet" project construction.
3. Increase investment to ensure effective work. It is necessary to increase investment and encourage financial, insurance, shopping malls, hotels, Internet cafes, bathing, hospitals, schools, communities, enterprises and institutions to actively participate in this work in accordance with the principle of “who benefits and who invests”, effectively solving the funds. problem.
4. Strengthen publicity and launch it widely. A propaganda working group was established. The team leader is the deputy director of the Comprehensive Management Office Huang Chengwei. The team members are composed of the Comprehensive Management Office, the Judicial Office and the residents' committee. The main tasks are as follows: First, vigorously publicize the construction of the “Tianwang” project to the general public and the community. The important significance is to publicize the implementation of this project to strengthen the security of the town and town management, combating illegal crimes, and make the "Tianwang" project construction a household name. The second is to distribute propaganda materials, write and post slogans for extensive publicity, and at the same time, through publicity and propaganda, vigorously strive for the active participation of the people and all walks of life to jointly promote the construction of the “Skynet” project in the town.
Part V: Implementation plan for urban city construction projects
In order to speed up the pace of urbanization, further improve the comprehensive service function of the central city, and fully implement the construction project of the central city this year, the following plans are formulated:
First, the guiding ideology
Conscientiously implement the spirit of the Second Party Congress and the Second Session of the Second National People's Congress, and adhere to the principle of “planning, construction, management, management, consolidation, and improvement” in accordance with the general idea of “promoting new leapfrogging and building new ___”. Focusing on accelerating the development and construction of the Liuhu New District, we will further improve the public infrastructure, focus on expanding capacity, improve functions, and strive to make the construction of the central city to a new level.
Second, the main tasks of the project construction
In 20XX, the central city construction project mainly includes five areas: the first zone, two zones, three parks, four roads and five constructions. The estimated total investment is 651 million yuan, of which the government directly invests 231 million yuan and the social investment is 420 million yuan.
Zone: Refers to the construction of the tourist landscape belt of the Weihe Avenue, with a project budget of 89.8 million yuan. There are four main projects:
1. Landscape greening project of Weihe Avenue: According to the requirements of landscaping landscape design, the greening and scenic spots facilities on both sides of the road will be implemented. The estimated project investment is 39 million yuan, and 300 mu of land is required for requisition. After the completion of the project, the total area of landscape and greening will reach 785 mu, which will be in line with more than 10 landscape facilities built on both sides of the road, thus forming a tourist landscape belt of the Weihe Avenue. The greening of the north and south sides of the project is carried out by the Municipal Forestry Bureau; the isolation belt greening and scenic spots facilities are implemented by the municipal urban construction project headquarters.
2. Construction of a thousand mu of water surface in the Weihe River: On the basis of the treatment of the river bank on the north side of the Weihe Avenue, comprehensively control the riverbed embankment of the Bali Bridge to the Weihe Bridge section, clean up the dunes of the river, and level the riverbed. The rubber dam forms a thousand acres of water on the Weihe River. The estimated project investment is 39 million yuan. The project is implemented by the Municipal Water Affairs Bureau. The relevant leaders in charge of the organization will further investigate and demonstrate, and do a good job in planning and designing.
3. Construction of Hushan Bridge: The Hushan Bridge will be built across the Weihe River along Hushan Road, with an estimated investment of 10 million yuan. The project is implemented by the Municipal Transportation Bureau.
4. Reconstruction project of Caohe Aqueduct: The Baiyun Temple irrigation station aqueduct widened and reconstructed the adult passage and formed a water surface landscape. The estimated investment of the project was 1.8 million yuan. The project is implemented by the Municipal Water Affairs Bureau.
Two districts: Comprehensive development of affordable housing community and Taoyuan Community of Guangcheng Road. The total estimated project is 1.4 billion yuan, and the project is planned to be implemented in phases. In 2019, the project has completed an investment of 350 million yuan.
1. Construction of affordable housing community in Guangcheng Road: The district is adjacent to Xinke Road in the east, Liuhu Road in the south, Guangcheng Road in the west, and Weihe Avenue in the north. It covers an area of 400 mu and has a planned total construction area of 530,000 square meters. The total investment estimate is 412 million yuan. In 2019, the planned construction is 200,000 square meters, and the estimated investment is 250 million yuan. The project is under the responsibility of the Municipal Construction Bureau and is organized and implemented in a unified planning and market operation. At the same time, 200 sets of low-rent housing were built in Gangou Road to solve the housing problem of residents in urban areas, which was implemented by the district government.
2. Comprehensive development of Taoyuan Community: The plot is located on both sides of Taoyuan Road from Luan Avenue to Luohe Avenue. It covers an area of 673 mu and consists of six different groups. Develop and construct high-end commercial and residential communities and support the construction of commercial pedestrian streets. Adopting the mode of market operation, implementing unified planning, sector development, one-time bidding, and annual construction. In XX, the project plans to invest 100 million yuan to complete the work of land acquisition, scoping, and listing.
Sanyuan: Liuhu Park will continue to be built in the east, the green area park in the new area will be built and the Nanshan Park will be renovated. The estimated project cost is 71.5 million yuan.
1. Liuhu Park East Expansion Project: The estimated investment is 16 million yuan, mainly implementing Liuhu Academy, ancient city wall, Wanglou, Siyu Pavilion, Huxin Pavilion and other antique buildings, with a total construction area of 7,200 square meters. , complete public toilets, greening, lighting and other supporting projects. It is implemented by the municipal city construction project headquarters.
2. Construction of the Greenbelt Park in the New District: Yanlin Road in the east, Luan Avenue in the south, Boai Road in the west and Liuhu Road in the north, covering a total area of 199.7 mu, with a total investment of 45.5 million yuan. The plan is implemented in an annual manner. In XX, the preparatory work for demolition, land acquisition, planning and design is completed. It is implemented by the municipal city construction project headquarters.
3. Nanshan Park Reconstruction Project: According to the city's overall urban planning, focus on the detailed construction planning of the park. On this basis, the public facilities in the park will be reconstructed and perfected according to the plan, and the rainwater and sewage pipelines will be laid, and the greening and lighting will be implemented. And other supporting projects to enhance the comprehensive use of the park. The project budget is 10 million yuan. Implemented by the district government.
Four roads: four north-south roads, Orchard North Road, Xingbei Road, Hushan Road and Dingbei North Road. The total length of the road is 3.74 kilometers, with a total area of 237.5 acres. The estimated investment is 69.735 million yuan. It is implemented by the municipal city construction project headquarters.
1. Construction of Orchard North Road: Liuhu Road in the south and Luohe Avenue in the north, with a total length of 650 meters, a road width of 30 meters, a main driveway of 15 meters, and sidewalks of 7.5 meters each.
2. Xingbei Road construction project: South Qiqi Avenue, north to Luohe Avenue, with a total length of 1078 meters, planned building red line 40 meters, road width 30 meters, one board road, main road width 15 meters, 7.5 meters on both sides sidewalk.
3. Hushan Road Construction Project: South Qiqi Avenue, north to Luohe Avenue, with a total length of 1231 meters. The planned road width is 90 meters south of Liuhu Road and 30 meters to the north.
4. Construction project of Dingbei North Road: Liuhu Road in the south and Luohe Avenue in the north, with a total length of 780 meters, a road width of 30 meters, and a control red line of 40 meters.
Wujian: It mainly includes five aspects of urban infrastructure, market construction, renovation of back streets and alleys, and construction of convenient public toilets.
The estimated project investment is 70.4 million yuan. Implemented by the district government.
1. Urban sewage reuse project: The project is a construction in progress with a total investment of 142 million yuan. In 2019, the project completed an investment of 15 million yuan. The rainwater and sewage diversion will be completed during the year, and will be considered together with the second phase of Huaneng Power Plant. The sewage pipe network was connected to the factory for treatment, and the project was completed and accepted.
2. Urban central heating project: The total investment of the project is 92.62 million yuan, and the project investment of 12 million yuan is completed in 2019. It is mainly combined with the development of the new urban area to implement the pre-supporting of the heating pipe network in the residential area of the new urban area. Station and part of the pipe network project.
3. Market construction project: Adopting the guidance of the government and the operation of the market, in accordance with the principle of “unified planning, rational layout, functional support, and convenience for the people”, the company will renovate 10 new professional markets and convenient markets, with an estimated investment of 24 million yuan.
4. Convenient road works: In accordance with the principle of “unified planning and design, unified quality standards, unified dispatch management, and unified technical acceptance”, 10 urban back streets and alleys will be reconstructed, with an estimated project investment of 16.4 million yuan.
5. Public toilet construction project: Adopting the government-led, social support, and who will benefit from the investment, 10 new public toilets will be built, with an estimated investment of 3 million yuan.
Continue to implement the XX year of continuous construction. Including Liuhu Academy, Huxin Pavilion, Siyu Pavilion, Wanglou construction and secondary platform greening, old park road reconstruction and Baofeng Road construction project.
In accordance with the requirements of “Creating a Provincial-level Garden City Implementation Plan”, the greening and urban beautification and lighting projects of urban roads and urban forest land, forest belts, squares and parks will be completed in 2019.
Third, the main ways of project implementation
The division of labor is responsible. Under the unified planning and unified organization and dispatch of the municipal urban construction project headquarters, the municipal and district governments and relevant departments and towns and towns shall be responsible for the division of work according to the tasks of decomposition, and implement them. The construction cost of the project shall be shared according to the principle of “who implements and who bears”.
project support. The Municipal Development and Reform Commission is responsible for the feasibility study and project work of the construction projects such as the landscape greening of the Weihe Avenue, the Weihe River surface and the Hushan Bridge in collaboration with the construction, transportation, forestry, and water affairs departments, and actively strive for special funds support from the state and the province. .
The loan started. In accordance with the principle of “appropriate debt collection and accelerated construction”, we will further integrate urban assets, optimize the selection and packaging of new loan projects, and continue to seek loan support from Bank of Communications, Development Bank and commercial banks.
In order to implement the spirit of the State Council's "Notice on Further Promoting the Construction of the National Green Passage Project", the task of greening the Xi'an Expressway Greening Project of the Green Passage of the city will be completed on time and in good quality and quantity. According to the "Master Plan for the Greening Forest Belt Project of the Main Road of Xi'an City", This embodiment is specifically formulated.
I. The significance of engineering construction
The construction of the Xi'an Expressway Green Passage Project is a major measure to implement the strategy of “Western Development and Xi'an Development”. It is an important part of the 9 trunk road green channel network projects implemented by the city and also improves the ecological environment. It is an important way to beautify the ancient city of Xi'an, improve the quality of life of urban and rural residents, and meet the sustainable development of society and economy. The implementation of this project will not only increase the green area of the city, reduce the pollution of various exhaust gases and dust to the atmosphere, but also promote the adjustment of the agricultural industry structure along the line and promote the healthy development of the two civilizations.
Second, the guiding ideology and principles of engineering construction
guiding ideology
To implement and protect the urban ecology by implementing the spirit of the instructions of General Secretary Jiang "recreating a beautiful and beautiful northwest region" and the request of Premier Zhu to "mobilize the broad masses of the people, plant trees and grass, and improve the ecological environment" With the environment as the center, we will build a high-standard and multi-effective ecological public welfare forest as a means to achieve beautiful mountains and rivers and promote urban and rural economic development, give full play to ecological, social and economic benefits, and promote the sustainable development of Xi'an's economic and social undertakings.
in principle
1. Adhere to the principle of unified planning, unified seed supply, and district organization implementation.
2. Adhere to the principle that land ownership is unchanged and that it is adjusted by districts, counties, townships and villages.
3. Adhere to the principle of combining appropriate land, quality first, greening and beautification.
4. Adhere to the country, the collective, and the individual together, whoever greens all, who invests and who benefits, who manages who benefits or does not plant the main tree, does not make the principle of no main forest.
Third, the main construction content
Construction scope
The Xi'an Expressway has a greening mileage of 42.6 kilometers, including 9 kilometers for Yanliang, 16.5 kilometers for Gaoling, 8.6 kilometers for Yongqiao and 8.5 kilometers for Linyi. The width of the forest frequency is 10 meters outside the barbed wire, and the total area of the forest belt is 1278 acres.
Construction period and tree planting requirements
1. Engineering tasks are completed by the end of March 20XX.
2. According to the principle of project construction, the tree species are arranged as follows: a row of eucalyptus trees planted 0.5 m outside the barbed wire, with a plant spacing of 3 m; 2 rows of poplar trees with 4 rows of poplar trees, with a row spacing of 2 m × 2 m. The poplar variety is 107 poplar and triploid Populus tomentosa, which are required to be planted in pure forest.
3. Seedling specifications: The seedling height is 3.5 meters or more, and the ground diameter is 2.5 cm or more. The growth is strong and straight, and there is no pest damage.
4. Planting requirements: use high-quality seedlings, dig large pits, plant large seedlings, plant spacing is in a "good" shape configuration. The planting pit size is 60×60×60 cm. Water the bottom of the plant before planting, and after planting, set a foot and water the roots to ensure that the seedlings sprout and survive. The trunk is whitened at 1.2 meters.
Seedling requirement
The project requires a total of 199,000 seedlings, including 171,000 poplar trees and 28,000 eucalyptus trees. The districts and counties are as follows:
1. The greening mileage of Yanliang District is 9 kilometers, and 42,000 seedlings are needed, including 36,000 poplar trees and 0.6 million eucalyptus trees.
2. Gaoling County has a greening mileage of 16.5 kilometers and requires 77,000 seedlings, including 66,000 poplar trees and 11,000 eucalyptus trees.
3. The greening mileage of Yanqiao District is 8.6 kilometers, and 40,000 seedlings are needed, including 34,300 poplar trees and 0.57 million eucalyptus trees.
4. The greening mileage of Linyi District is 8.5 kilometers, and 40,000 seedlings are needed, including 34,300 poplar trees and 0.57 million eucalyptus trees.
Fourth, the investment distribution plan
The project is an important part of the beautiful project of mountains and rivers, and it is also an important task of the green channel construction of the city. The project is organized and implemented by all districts and counties in accordance with the unified plan. The municipal finance grants appropriate financial subsidies, and subsidies for planting and management fees per kilometer. 35,000 yuan. In order to ensure the quality of the project, the seedlings are all provided by the city's modern integrated nursery.
The total investment of the project is 3 million yuan, of which the seedling fee is 1,107,600 yuan, the district and county planting and management subsidy is 1.491 million yuan, the technical guidance fee is 60,000 yuan, the supervision fee is 70,000 yuan, the management fee is 50,000 yuan, and the design fee is 21,400 yuan. Unforeseen expenses of 200,000 yuan.
The subsidies for districts and sub-sections are as follows:
1. The greening mileage of Yanliang District is 9 kilometers, with an investment of 315,000 yuan.
2. Gaoling County has a greening mileage of 16.5 kilometers and an investment of 577,500 yuan.
3. The greening mileage of Yanqiao District is 8.6 kilometers with an investment of 301,000 yuan.
4. Linyi District has a greening mileage of 8.5 kilometers and an investment of 297,500 yuan.
V. Guarantee measures
Strengthen leadership and raise awareness
The relevant districts and counties should attach great importance to the construction of the green channel project of the Xiqiao Expressway. It is necessary to put this project on the important agenda. It is necessary to stand at the strategic height of the development of the western region and fully understand the significance of implementing this project. It is necessary to widely publicize and launch, organize all aspects of strength, and invest in the construction of the green channel project of Xiqiao Expressway, and strive to achieve new and better results.
Establish a sound technology and quality assurance system
The Municipal Forestry Bureau will draw 6-8 professional and technical personnel from the municipal forestry station to form technical guidance and quality supervision team, responsible for technical guidance, seedling evaluation and quality supervision. All districts and counties must establish corresponding institutions, and under the guidance of the city's supervisors, earnestly grasp the quality of the project. It is necessary to follow the procedure of burying the planting pit first, and then transferring the seedlings and planting after the experience is passed. It is strictly forbidden to organize the pits and planting after the seedlings are transported. It must be done on the same day, transported on the same day, and planted on the same day. After planting, water the roots to ensure that the seedlings survive.
Seriously check and accept, and actively implement the implementation
All districts and counties should do all the preparatory work for construction such as ideological launching and land adjustment before the end of February. In early March, the people were mobilized and planting activities were carried out to ensure that tasks were completed on time. At the end of June 20XX, the city will organize relevant departments to carry out inspection and acceptance, reward and reward the completion of the completion; notify the completion of the poor criticism, complete the task within a time limit, and hold the relevant leaders responsible. After the inspection and acceptance, for the sections with low survival rate, the districts and counties must be replanted in the autumn, and no subsidies will be given in the city. Regardless of any form of land, it is strictly forbidden to interplant high-dry crops in forest belts to ensure planting results.
Establish management responsibility and consolidate afforestation results
All districts, counties, towns and towns shall, in light of their respective actualities, formulate practical and feasible management and protection measures and implement management and protection responsibilities. In the future, the county, township and village road greening land that the local government is responsible for can promote farmers' voluntary land acquisition, national emergence, individual contracting and afforestation management, and return of income, and implement the policy of who will benefit from forestation. It can also take the form of auction, contracting, anti-rental and reverse packaging to solve the project land. It is necessary to mobilize the enthusiasm of all parties to participate in the project construction by clarifying the property rights and clarifying the responsible persons, so as to consolidate the achievements of afforestation.
Part 2: Implementation plan for the “four virtues” project construction
In order to further strengthen the ideological and moral construction of our teachers and students, and promote the harmonious and healthy development of all our work,
According to the opinions of the county party committee and the county government on the implementation of the "four virtues" project to promote the moral construction of the citizens of the county and the spirit of the archives of the 20th [20XX] No.43, combined with the actual education of our township, this implementation plan was formulated.
First, the guiding ideology
We will conscientiously implement the spirit of the party's XX and XX X Plenary Sessions, adhere to the scientific development concept as the guiding principle, build a socialist core value system as the foundation, and focus on enhancing the sense of integrity and responsibility. In the next few years, the “Four German Projects” will be implemented in depth throughout the school to continuously strengthen the social morality, professional ethics, family virtues and personal moral education of teachers and students. Infiltrating the "Chinese Little Teachers' Professional Ethics" and the "School of Primary and Secondary School Students" into daily study and work life, transforming into conscious actions, guiding the teachers and students to develop good moral literacy and behavior habits, and to be healthy, harmonious and sustainable for our school. Development provides solid ideological support and spiritual support.
Second, the activity target requirements:
Taking the next three years as the "year of moral construction promotion", based on the reality of our hometown, we will extensively carry out the construction of "four virtue projects" with "Ed, Chengde, Xiaode, Rende" as the main contents, and strengthen the society of teachers and students in schools. Public morality, professional ethics, family virtues and personal moral education. Through the development of various forms of study and education and ethical practice activities, we advocate a group of advanced models, guide teachers and students to start from the self, start from the small things around us, learn from the role models, and “love and respect the students; Studying, rigorously dropping out of school; courageously innovating, making progress and making progress; indifferent to fame and fortune, high-spirited and high-spirited, the basic requirements penetrate into the daily study and work life, vigorously promote "dedication and dedication, honesty and trustworthiness, filial piety, love, help, and courage "Civilized fashion, develop good moral literacy and behavioral habits, and promote the harmonious development of school work.
Third, a sound institution
In order to carry out the "Four German Projects" in an effective and effective manner, we have effectively implemented the activities and achieved practical results. After research and decision, we established an activity leading group.
Team leader: Liu Xiangjun
Deputy Team Leader: Tang Wenfa Sun Xinze
Member:
Feng Shouliang Hao Hongzhen Zhang Guangmin Liu Yupo Gao Wenshen
Cui Jinchao Liu Cangzhu Hao Jijun Fan Chuanbo Duan Chuanqiang
Small countries have to set up corresponding organizations to lead the group.
Fourth, the implementation steps
According to the unified deployment and requirements of the superiors, the event was divided into four phases, which lasted for three years:
Learning mobilization stage
1. Hold a mobilization meeting, set up a leading organization, formulate a work plan, and sign the personal responsibility of the “four virtues project”.
2. Organize the spirit of learning the superior files, learn the traditional Chinese virtues and virtues, and concentrate on the study time of no less than 40 hours, and the personal study notes should be no less than 4,000 words.
3. Building learning content around the “four virtues”, writing experiences and learning exchanges.
4. Organize the sing of "Si De Ge" in the teachers and students of the whole school; advertise the slogan on the campus; distribute the proposal to all teachers and students, and concentrate on publicity and reporting.
Organizational implementation phase
1. Strengthening the construction of teachers' morality and style with the "five ones" activity
Carry out a reading experience with love and responsibility as the theme to test the learning results, so that they can learn to learn, learn to understand, and realize something.
Organize a keynote speech on "How to be a happy teacher", find happiness around you, and establish a model of teacher's morality around you.
Deepen a theme event. That is, the practice of “doing a happy teacher, comprehending a happy life”, through the democratic evaluation, student satisfaction evaluation, job announcement, teacher public commitment, professional ethics lectures and psychological counseling activities, stimulate the sense of responsibility and mission of teaching and educating people. Create a positive atmosphere for teachers to be positive.
Combined with the main line of school teaching, a series of teaching activities are carried out. Actively build a platform for teachers to display and develop themselves, help teachers improve their education and teaching level, promote professional growth, and enhance teachers' professional accomplishment.
A series of literary and sports activities will be held. Caring for the physical and mental health of faculty and staff, embodying the feelings of humanistic management, organizing faculty and staff to actively exercise the body during the big class, guiding the faculty and staff to constantly adjust their mentality, and ensuring that the faculty and staff are devoted to education and teaching with sufficient energy.
2. Carry out a series of themed education activities of “Mingde Slim and Love Practice” among the students.
Combining the moral education work of each school in our township, we will determine the theme of each month and form a new situation of moral education with the theme of "month and month, theme, week and week, and content every day." The theme of moral education in each month is:
November - Civilized Courtesy Month
A "four virtues" education theme class meeting was held. Each class has a variety of design styles, lively, easy-to-understand, and interesting, age-oriented theme class sessions, so that students can understand the content of the four German education and understand the significance of implementing the "four German project" activities.
Participate in the "Love Claims" action, organize students to claim a tree, a green space or a public facility in a school or individual, and use the rest days and holidays to carry out voluntary maintenance and management.
Hold the "Lei Feng Spirit with Me" series of practical activities: ask the children to start with the little things around them, give their parents a cup of tea on Sundays and holidays, wash their feet, make meals, make grateful gifts; use weekends or spare time , carry out "going into the nursing home, caring for the elderly" and "I offer love for the old teachers" to visit the condolence activities.
In conjunction with the National Security Education Week, in the last week of November, we launched “Safety with Me”,
“Create a safe campus” safety education activity.
December - the campus is full of civilized flowers
Carry out the "Green Guardian" action. Each class organizes a special issue report, actively promotes environmental protection knowledge, advocates energy conservation and emission reduction, low-carbon life, educates students to consciously protect the environment, save resources, beautify their hometown, and supervise and report on behaviors that damage the environment.
Students in each class carefully study the "One-day routine" and "Standards of Daily Behavior of Primary School Students", hold a knowledge contest, and moral education in the competition, so that students can understand their spiritual essence.
Carry out the "My Show" campaign. Organize a "pre-course song", "read a good book, sing a good song, be a good person", "Chinese classic reading", organize and watch civilized etiquette videos and other educational practice activities, educate students on civilized etiquette and behavioral habits, Make students develop noble ideological quality and good moral sentiment.
January 20XX - the most glorious work, the happiest reading
Carry out competitions for folding clothes, tying shoelaces, and sewing sandbags to educate students to be "hardworking and glorious, lazy and shameful."
Hold a good book recommendation activity, and recommend students to read good books on the basis of mobilizing students to read more books, reading books, taking notes, and writing experiences.
Hold a student parent meeting. Improve the parent committee system, actively expand the channels of moral education, and form an educational network of communication, cooperation between schools, families and society.
March-April 2019 - Appraisal of the month.
In order to carry out the evaluation of "star-class civilized class" and "star-class civilized students" activities as the carrier, the students' self-evaluation, mutual evaluation and teacher evaluation are combined to carry out the summary of moral education work.
Organize students to use the summer vacation to carry out activities that are rich and diverse and full of moral education.
Summary improvement phase
Conduct self-examination and summary of the activities, find the shortcomings, and formulate the next tasks.
Long-term mechanism
Further improve the "four German projects" system, deepen the construction of the "four German projects", establish a long-term mechanism for the construction of the "four German projects", and form a normalization of work.
V. Implementation requirements
Strengthen organizational leadership. The school set up an activity leading group to clarify work responsibilities. According to the implementation plan, strengthen measures, clarify objectives, select breakthrough openings and joint points to ensure the effective implementation of various tasks.
Improve the working mechanism and strengthen the assessment management. In combination with the actual situation of the school, the evaluation mechanism of teacher's morality will be further improved, and the "one-vote veto" of teacher's morality assessment will be strictly implemented, and supervision and inspection will be strengthened to standardize teachers' teaching behavior according to law.
Strengthen typical culture. Focus on cultivating and excavating moral models and advanced figures. The selection of “student like, colleague admiration, leadership satisfaction” teachers and students series of activity pacesetters, establish advanced models and create a good working atmosphere.
Part 3: Implementation plan for river dam construction
In order to effectively improve the flood control capacity of Xingguo County and ensure the safety of people's lives and property, according to the overall plan of "one city, three districts" and "three rivers and six banks", in order to ensure the order of the river dam project on both sides of the river, the plan is promoted in an orderly manner. This embodiment:
I. Project Overview
The construction of the dams on both banks of the Yangtze River, the dam construction area is above the Tongjiang River estuary, and the junction of the two rivers below. The dam is about 320 meters long and is constructed by flapping gates. The overall requirements for project construction are “strong flooding capacity, low investment costs, and the characteristics of rejuvenating the country”. The main work of the project construction includes:
1. Do a good job of verifying the land, graves and trees surrounding the dam, and delineate the scope of requisition.
2. Complete land acquisition, grave relocation and various tree transplanting and felling and cleaning of miscellaneous trees in the surrounding area of the dam site.
3. In accordance with the policy provisions and the relevant compensation standards already issued in the county, do a good job in the compensation and distribution of land acquisition, grave relocation, tree felling and transplanting.
4. Do a good job in the project's environmental impact assessment, soil and water conservation plan report and other related work.
5. Do other preparatory work for the barrage project.
6. Complete the preliminary design and technical design of the project and complete the drawing review work.
7. Project construction and project supervision bidding.
8. The construction team will enter the construction site.
9. Completion acceptance and operation of the project.
Second, the working organization
In order to ensure the smooth implementation of the project construction as soon as possible and smoothly, the county party committee office and the government office issued the "Notice on the establishment of a riverside dam project construction headquarters" on March 8th, which was clearly defined by the county party committee member and deputy county head. The Minister of Agriculture and Industry is the chief commander and is responsible for the overall work of the command department; the vice chairman of the county CPPCC is the deputy commander, responsible for the coordination, inspection, arrangement and use and management of the daily work and construction of the headquarters. The agencies under the command include:
1. Office:
Director: The presiding office is working in full.
Deputy Director: Responsible for the daily work, organization, coordination and inspection of the office, propose work plans and arrangements, and formulate work measures and plans.
Deputy Director: Responsible for the review of expenses, material procurement, fund request and financial accounting, and daily office affairs.
office staff:
Responsible for engineering quality and technical control, engineering quantity verification and project change review.
Responsible for the drafting of archives, materials, meeting preparation, work reception, uploading, seal management, report review, coordination and other work.
Assist and do related work.
2. Land acquisition and grave migration group:
Team leader:
Deputy head:
Member units: Land and Resources Bureau, Housing Management Bureau, Forestry Bureau, Town, Township, Industrial Park
Responsibilities: Responsible for land acquisition, grave relocation, tree transplanting and fund compensation review
3. Working technology group:
Team leader:
member:
Responsibilities: Responsible for the whole process of monitoring, verification, and verification of project changes.
Third, work arrangements and implementation steps
1. The county water conservancy bureau takes the lead and the city investment company cooperates to complete the dam site selection, survey and measurement, and feasibility study report preparation before April 20th;
2. The county development and reform commission takes the lead, and the water conservancy bureau and the city investment company cooperate to complete the feasibility study review and project establishment of the project before May 10;
3. The county city investment company takes the lead and the water conservancy bureau cooperates to implement and determine the preliminary design unit of the project before the end of April of the year. The initial design plan will be taken before June 10, and the initial review work will be completed before the end of June;
4. The county environmental protection bureau is responsible for completing the on-site monitoring and environmental impact assessment report preparation work of the project before May 30 of the year;
5. The County Water and Environmental Protection Bureau is responsible for completing the preparation of the project soil and water conservation plan report before May 30 of the year;
6. The County Land and Resources Bureau, the township, township, and industrial park management committees cooperate to complete the survey and scoping of land acquisition surveys around the dam before May 10, and complete the land requisition procedures before May 20, and distribute them before the end of May. Compensation for land acquisition funds;
7. The county housing management bureau, the township, township, and industrial park management committees cooperate to complete the investigation and verification of the graves around the dam and the selection of the new grave settlement site before May 20, and notify the grave owner to prepare for the relocation before June 10. The compensation for the relocation of the graves will be paid, and all the graves will be relocated before July 10;
8. The County Forestry Bureau is responsible for the verification of the forest felling and transplanting around the dam before May 15 of the year. The approval process will be completed before May 25, and the tree felling and transplanting will be completed before June 20;
9. The county investment company will take the lead in organizing relevant departments to complete the bidding work of the project before August 15 of the year, and determine the construction and construction unit, and sign the construction contract;
10. At the end of August, the construction team entered the site and the project was officially started.
11. The headquarters is responsible for the cooperation between the Water Resources Bureau and the City Head Company. The construction and construction unit is instructed to complete the first phase of the construction of the cofferdam diversion project before the end of October of the year. The river dam foundation and pump house civil works will be completed before the end of November. Dam construction, gate and pump room equipment installation, complete the second phase of the project before the end of January, complete the second phase of dam construction before the end of February, complete the second phase of the gate and pump room equipment installation before the end of March, before April 15 The project is completed;
12. Complete the project completion, inspection and handover before the end of June;
14. The headquarters office should conscientiously carry out preparations, tracking services, supervision and inspection work in the early, middle and late stages of the project construction according to the above-mentioned implementation steps, and increase the guidance and management of the project construction.
Fourth, the project budget and the use of funds
The project shall be constructed and constructed according to the design plan approved by the county government. The relevant departments of the city investment company shall be responsible for the project budget estimation, and the city investment company shall be responsible for the review and supervision and use.
V. Work measures and requirements
1. Strengthen leadership.
The personnel required to be dispatched in the command department are relatively stable, ensuring that they are in place, and that people are attentive, attentive, time-consuming, and energetic, and in accordance with their respective responsibilities, do a good job in the implementation of various tasks.
2. Grasp the progress.
All member units and working groups of the command department shall draw up a work flow chart according to the time schedule and work implementation plan requirements, and report the progress of the work in the current month to the headquarters before the 25th of each month, and submit the work arrangements and plans for the next month.
3. Strengthen scheduling.
In principle, the headquarters convened a work scheduling meeting once a week. The working groups reported on the work progress last week, coordinated the difficulties and problems in the progress of the project, and studied the deployment of this week's work plans and arrangements.
4. Clear responsibilities.
Each job is counted down to the count, the responsibility is refined to the member units, the task is implemented to the individual, the responsibility is clear, the method is right, the measures are appropriate, the program is in place, and the time limit is closed, and the headquarters office is responsible for supervision and inspection.
5. Coordination and cooperation.
All member units and working groups of the headquarters should work under the unified leadership of the command department, establish a global concept, support each other, closely cooperate, form a joint effort, and do a good job in all work.
6, the rewards and punishments are clear.
All member units and working groups of the command department should take the initiative to do their work according to their respective job responsibilities, timely handle and resolve various contradictions and disputes arising in the work, ensure the smooth progress of the project construction, and regard the work of each member unit and individual. The reward is awarded for the completion of the situation.
Part 4: Implementation plan for the construction of “Tianwang” project in Wendi Town
In order to create a harmonious and stable cultural environment, create a good investment environment, protect the lives and property of the people, improve the technical defense capabilities of our town, meet the needs of the town's public security control and urban management, and enhance the safety and satisfaction of the people. Through the study of the town party committee and government, it was decided to implement the construction of “Skynet” project. The specific implementation plan is as follows:
First, the guiding ideology
Guided by the scientific concept of development, with the goal of creating a peaceful and cultural relic, adhere to the government's leadership, multi-party cooperation, deepen the construction of the "Skynet" project, improve the level of scientific and technological precautions, and build a "play, defense, management, control, stability" Protect against the network. Efforts should be made to achieve the goals of low number of cases, good order, social stability, and people's satisfaction, and create a good social security environment for the rapid and stable development of the arts and culture and the people's livelihood.
Second, organizational leadership
In order to ensure the smooth development of the “Skynet” project construction, the “Tianwang” project construction leading group of Wendi Town was established. The list of its members is as follows:
Team leader: Chen Peng Town Party Secretary
Deputy Secretary of the Party Committee and Mayor of Huanghai Town
Deputy Team Leader: Deputy Secretary of the Party Committee of Huanghua Town, Chairman of the National People's Congress
He Haibo Town Party Committee Member, Deputy Mayor
Member: Tao Zonghai Deputy Secretary of the Party Committee
Mo Dongxia Deputy Secretary of the Party Committee
Huang Huanfu Vice Chairman of the Town People's Congress
Mo Yongmao Town Party Committee Propaganda Committee, Deputy Mayor
Deputy Mayor of Liulin Town Government
Huang Hedong Town Party Committee
Liang Kaishao Town Discipline Inspection Commission, Secretary of the Discipline Inspection Commission
Member of the Party Committee and Armed Minister of Lidong Town
Huang Zuyuan Town Party Committee United Front Committee
Xie Guojun, Director of Wendi Police Station
Huang Chengyu, Deputy Director of the Town Comprehensive Management Office
Huang Weiqiang, Head of Wendi Justice Office
Liu Shuyu, captain of the traffic police squadron
Liu Yuanan Town Finance Office Director
Liang Yunda Township Party Committee
Head of each unit in the town
The leading group has an office located at the Comprehensive Management Office. The director of the office is concurrently appointed by Huang Hua, responsible for daily affairs and organization and coordination. Tel: 8641555.
Third, the scope of implementation
Install high-density video in four directions in the southeast and northwest of the town, and cover all-weather video surveillance cameras in the densely populated areas, public security spots, high-incidence areas, bazaars, hotels, schools, and hospitals in the town. The video surveillance system established by each business outlets and various operating stores can access the “Tianwang” engineering system through optical fiber and other communication methods, and establish a “Skynet” monitoring platform for resource sharing as a social video surveillance resource.
Fourth, the implementation steps
The Skynet project is divided into three phases:
1. Mobilization stage: Establish a leading group and various working groups and other institutions, formulate the implementation plan of the “Skynet” project construction, promptly convene a special meeting of the leading group, conduct research and deployment, unify thinking, clarify responsibilities, strengthen coordination, and implement well. The town's social security video surveillance "Tianwang" project construction mobilization meeting was held to mobilize and deploy.
2. Preparation stage: Do a good job in the preliminary work. A comprehensive working group will be formed by the Comprehensive Management Office, the Public Security Bureau, the Traffic Police, the Electric Power, and the Urban Construction Department. The video surveillance points, the monitoring center line layout, and the power access will be planned and demonstrated. Please have qualified professional and technical personnel to formulate the construction design plan. Evaluate the budget, select the construction and installation company, and sign the project construction contract.
3. Construction stage: According to the arrangement of the “Tianwang” project leading group, it should be carefully organized according to the requirements of planning and design plan to ensure the construction quality. Relevant enterprises and institutions should coordinate and cooperate, fully support and ensure that the project is completed on schedule. After the completion of the project, the “Tianwang” project construction leading group will organize the acceptance.
V. Source of funds
In accordance with the principle of “who benefits and who invests”, the “Skynet” project system is established. Road monitoring, public space monitoring engineering construction, monitoring platform construction as a social welfare undertaking, its system construction costs, maintenance costs for higher-level funding to solve part of the funds, most of the funds are still mobilized by social forces to donate sponsorship, donations include: industrial enterprises , all breeding farms, shops in the town of Shangyu, residents, and units in the town and cadres and workers. Administrative enterprises, institutions, finance, insurance, schools, shopping malls, supermarkets, Internet cafes, hotels, key units, etc., the construction costs and maintenance costs of their own video surveillance systems and anti-theft alarm systems shall be borne by the unit.
6. Division of responsibilities
1. The “Tianwang” Leading Group Office is the lead unit of the “Skynet” project construction, responsible for planning, organizing, coordinating and implementing the project. It is necessary to strengthen supervision and inspection, actively and relevant units to study and formulate the implementation plan for the construction of “Tianwang” project, deploy in the whole town, organize supervision and hold dispatching meetings, etc., promote the work in depth, widely publicize and launch, create momentum and improve various units. Participate in the enthusiasm of the "Skynet" project; master the work schedule and establish the "Tianwang" project construction ledger.
2. Police station: In accordance with the mission requirements of the “Tianwang” project construction leading group, actively communicate with communications, power, urban construction and other units to complete the construction of monitoring platform and road monitoring. Provide technical solutions and standards to the leadership team and participate in the acceptance of each monitoring system project.
3. Communication department: Make full use of communication resources and technical advantages, and be responsible for providing optical network resources for the “Tianwang” project, and construct a cultural and residential monitoring metropolitan area network. When the conditions are ripe, the monitoring system of each unit will be connected to the “Tianwang” project monitoring platform of the text. When the communication network fails or has problems, it will be sent to the person for repair and repaired in the shortest time.
4. Power department: responsible for providing power access supply and guarantee to the “Tianwang” project; unified exemption of the electricity fee for the public monitoring system.
5. Urban Construction Department: Responsible for providing the urban construction planning and the situation around the monitoring point to the “Tianwang” project construction leading group to assist in determining the installation location of the surveillance camera.
Seven, safeguard measures
1. Strengthen leadership and careful deployment. The construction of the "Skynet" project is an important measure to meet the new requirements and new expectations of the people, and is an effective way to further improve the prevention and control capabilities of the town. All units and departments must attach great importance to it and put it into the important agenda. The main leaders must personally ask questions, fully support them, and the leaders in charge should be specifically responsible and implement them.
2. Strengthen cooperation and cooperation to form synergy. The "Skynet" project is a huge project involving a wide range of tasks. The tasks are arduous and arduous. All units and departments must strengthen contact and communication. They should perform their duties and responsibilities, and regularly exchange information, research and solve problems. New situations and new problems encountered in the work, and strive to form the joint force of the "Skynet" project construction.
3. Increase investment to ensure effective work. It is necessary to increase investment and encourage financial, insurance, shopping malls, hotels, Internet cafes, bathing, hospitals, schools, communities, enterprises and institutions to actively participate in this work in accordance with the principle of “who benefits and who invests”, effectively solving the funds. problem.
4. Strengthen publicity and launch it widely. A propaganda working group was established. The team leader is the deputy director of the Comprehensive Management Office Huang Chengwei. The team members are composed of the Comprehensive Management Office, the Judicial Office and the residents' committee. The main tasks are as follows: First, vigorously publicize the construction of the “Tianwang” project to the general public and the community. The important significance is to publicize the implementation of this project to strengthen the security of the town and town management, combating illegal crimes, and make the "Tianwang" project construction a household name. The second is to distribute propaganda materials, write and post slogans for extensive publicity, and at the same time, through publicity and propaganda, vigorously strive for the active participation of the people and all walks of life to jointly promote the construction of the “Skynet” project in the town.
Part V: Implementation plan for urban city construction projects
In order to speed up the pace of urbanization, further improve the comprehensive service function of the central city, and fully implement the construction project of the central city this year, the following plans are formulated:
First, the guiding ideology
Conscientiously implement the spirit of the Second Party Congress and the Second Session of the Second National People's Congress, and adhere to the principle of “planning, construction, management, management, consolidation, and improvement” in accordance with the general idea of “promoting new leapfrogging and building new ___”. Focusing on accelerating the development and construction of the Liuhu New District, we will further improve the public infrastructure, focus on expanding capacity, improve functions, and strive to make the construction of the central city to a new level.
Second, the main tasks of the project construction
In 20XX, the central city construction project mainly includes five areas: the first zone, two zones, three parks, four roads and five constructions. The estimated total investment is 651 million yuan, of which the government directly invests 231 million yuan and the social investment is 420 million yuan.
Zone: Refers to the construction of the tourist landscape belt of the Weihe Avenue, with a project budget of 89.8 million yuan. There are four main projects:
1. Landscape greening project of Weihe Avenue: According to the requirements of landscaping landscape design, the greening and scenic spots facilities on both sides of the road will be implemented. The estimated project investment is 39 million yuan, and 300 mu of land is required for requisition. After the completion of the project, the total area of landscape and greening will reach 785 mu, which will be in line with more than 10 landscape facilities built on both sides of the road, thus forming a tourist landscape belt of the Weihe Avenue. The greening of the north and south sides of the project is carried out by the Municipal Forestry Bureau; the isolation belt greening and scenic spots facilities are implemented by the municipal urban construction project headquarters.
2. Construction of a thousand mu of water surface in the Weihe River: On the basis of the treatment of the river bank on the north side of the Weihe Avenue, comprehensively control the riverbed embankment of the Bali Bridge to the Weihe Bridge section, clean up the dunes of the river, and level the riverbed. The rubber dam forms a thousand acres of water on the Weihe River. The estimated project investment is 39 million yuan. The project is implemented by the Municipal Water Affairs Bureau. The relevant leaders in charge of the organization will further investigate and demonstrate, and do a good job in planning and designing.
3. Construction of Hushan Bridge: The Hushan Bridge will be built across the Weihe River along Hushan Road, with an estimated investment of 10 million yuan. The project is implemented by the Municipal Transportation Bureau.
4. Reconstruction project of Caohe Aqueduct: The Baiyun Temple irrigation station aqueduct widened and reconstructed the adult passage and formed a water surface landscape. The estimated investment of the project was 1.8 million yuan. The project is implemented by the Municipal Water Affairs Bureau.
Two districts: Comprehensive development of affordable housing community and Taoyuan Community of Guangcheng Road. The total estimated project is 1.4 billion yuan, and the project is planned to be implemented in phases. In 2019, the project has completed an investment of 350 million yuan.
1. Construction of affordable housing community in Guangcheng Road: The district is adjacent to Xinke Road in the east, Liuhu Road in the south, Guangcheng Road in the west, and Weihe Avenue in the north. It covers an area of 400 mu and has a planned total construction area of 530,000 square meters. The total investment estimate is 412 million yuan. In 2019, the planned construction is 200,000 square meters, and the estimated investment is 250 million yuan. The project is under the responsibility of the Municipal Construction Bureau and is organized and implemented in a unified planning and market operation. At the same time, 200 sets of low-rent housing were built in Gangou Road to solve the housing problem of residents in urban areas, which was implemented by the district government.
2. Comprehensive development of Taoyuan Community: The plot is located on both sides of Taoyuan Road from Luan Avenue to Luohe Avenue. It covers an area of 673 mu and consists of six different groups. Develop and construct high-end commercial and residential communities and support the construction of commercial pedestrian streets. Adopting the mode of market operation, implementing unified planning, sector development, one-time bidding, and annual construction. In XX, the project plans to invest 100 million yuan to complete the work of land acquisition, scoping, and listing.
Sanyuan: Liuhu Park will continue to be built in the east, the green area park in the new area will be built and the Nanshan Park will be renovated. The estimated project cost is 71.5 million yuan.
1. Liuhu Park East Expansion Project: The estimated investment is 16 million yuan, mainly implementing Liuhu Academy, ancient city wall, Wanglou, Siyu Pavilion, Huxin Pavilion and other antique buildings, with a total construction area of 7,200 square meters. , complete public toilets, greening, lighting and other supporting projects. It is implemented by the municipal city construction project headquarters.
2. Construction of the Greenbelt Park in the New District: Yanlin Road in the east, Luan Avenue in the south, Boai Road in the west and Liuhu Road in the north, covering a total area of 199.7 mu, with a total investment of 45.5 million yuan. The plan is implemented in an annual manner. In XX, the preparatory work for demolition, land acquisition, planning and design is completed. It is implemented by the municipal city construction project headquarters.
3. Nanshan Park Reconstruction Project: According to the city's overall urban planning, focus on the detailed construction planning of the park. On this basis, the public facilities in the park will be reconstructed and perfected according to the plan, and the rainwater and sewage pipelines will be laid, and the greening and lighting will be implemented. And other supporting projects to enhance the comprehensive use of the park. The project budget is 10 million yuan. Implemented by the district government.
Four roads: four north-south roads, Orchard North Road, Xingbei Road, Hushan Road and Dingbei North Road. The total length of the road is 3.74 kilometers, with a total area of 237.5 acres. The estimated investment is 69.735 million yuan. It is implemented by the municipal city construction project headquarters.
1. Construction of Orchard North Road: Liuhu Road in the south and Luohe Avenue in the north, with a total length of 650 meters, a road width of 30 meters, a main driveway of 15 meters, and sidewalks of 7.5 meters each.
2. Xingbei Road construction project: South Qiqi Avenue, north to Luohe Avenue, with a total length of 1078 meters, planned building red line 40 meters, road width 30 meters, one board road, main road width 15 meters, 7.5 meters on both sides sidewalk.
3. Hushan Road Construction Project: South Qiqi Avenue, north to Luohe Avenue, with a total length of 1231 meters. The planned road width is 90 meters south of Liuhu Road and 30 meters to the north.
4. Construction project of Dingbei North Road: Liuhu Road in the south and Luohe Avenue in the north, with a total length of 780 meters, a road width of 30 meters, and a control red line of 40 meters.
Wujian: It mainly includes five aspects of urban infrastructure, market construction, renovation of back streets and alleys, and construction of convenient public toilets.
The estimated project investment is 70.4 million yuan. Implemented by the district government.
1. Urban sewage reuse project: The project is a construction in progress with a total investment of 142 million yuan. In 2019, the project completed an investment of 15 million yuan. The rainwater and sewage diversion will be completed during the year, and will be considered together with the second phase of Huaneng Power Plant. The sewage pipe network was connected to the factory for treatment, and the project was completed and accepted.
2. Urban central heating project: The total investment of the project is 92.62 million yuan, and the project investment of 12 million yuan is completed in 2019. It is mainly combined with the development of the new urban area to implement the pre-supporting of the heating pipe network in the residential area of the new urban area. Station and part of the pipe network project.
3. Market construction project: Adopting the guidance of the government and the operation of the market, in accordance with the principle of “unified planning, rational layout, functional support, and convenience for the people”, the company will renovate 10 new professional markets and convenient markets, with an estimated investment of 24 million yuan.
4. Convenient road works: In accordance with the principle of “unified planning and design, unified quality standards, unified dispatch management, and unified technical acceptance”, 10 urban back streets and alleys will be reconstructed, with an estimated project investment of 16.4 million yuan.
5. Public toilet construction project: Adopting the government-led, social support, and who will benefit from the investment, 10 new public toilets will be built, with an estimated investment of 3 million yuan.
Continue to implement the XX year of continuous construction. Including Liuhu Academy, Huxin Pavilion, Siyu Pavilion, Wanglou construction and secondary platform greening, old park road reconstruction and Baofeng Road construction project.
In accordance with the requirements of “Creating a Provincial-level Garden City Implementation Plan”, the greening and urban beautification and lighting projects of urban roads and urban forest land, forest belts, squares and parks will be completed in 2019.
Third, the main ways of project implementation
The division of labor is responsible. Under the unified planning and unified organization and dispatch of the municipal urban construction project headquarters, the municipal and district governments and relevant departments and towns and towns shall be responsible for the division of work according to the tasks of decomposition, and implement them. The construction cost of the project shall be shared according to the principle of “who implements and who bears”.
project support. The Municipal Development and Reform Commission is responsible for the feasibility study and project work of the construction projects such as the landscape greening of the Weihe Avenue, the Weihe River surface and the Hushan Bridge in collaboration with the construction, transportation, forestry, and water affairs departments, and actively strive for special funds support from the state and the province. .
The loan started. In accordance with the principle of “appropriate debt collection and accelerated construction”, we will further integrate urban assets, optimize the selection and packaging of new loan projects, and continue to seek loan support from Bank of Communications, Development Bank and commercial banks.
recommended article
- Celebration program
- July 1 commendation activity plan
- New Year's event plan for 2019
- 2014 organization life meeting plan
- Supermarket 5.1 Promotions
- Collective wedding planning
- Winter Fire Prevention Program 2019
- Guoxiaoxin Teacher Training Program
- Company opening ceremony planning plan
- Village-level environmental sanitation improvement plan
- Create a smoke-free unit implementation
- Equipment Management Implementation Plan
popular articles
- English famous words
- I want to say something to the teacher.
- Summer camp program for 2019
- 2019 Christmas Eve event plan
- Strong words
- Thanks to the friend's words 2019
- Du Yuexi's famous sayings
- Qq space mood phrase
- Company activity planning
- Bing Xin’s famous words
- Injured sentence
- July 1st activity plan
- Describe the fast time sentence 2019
- Classical life motto
- Taizai’s famous sayings
- a good saying that loves labor
- Deaf people jingle 2019
- 2014 is very touching words
- Tao Xingzhi's famous sayings
- 2014 Mall National Day Festival Plan
- Korean swear words
- The latest high school inspirational maxim
- Teacher's famous saying
- College student business plan
- Teacher's Day Program for 2019
- Jiujiu Chongyang Festival Program in 2019
- Sad love sentence 2019
- In-house training program
- 2019 annual training program
- College entrance examination inspirational quotes