Part 1: Electrician Technology Competition Scheme

First, the name and model of the game

1, switch type: BQD10-200ZD/660/380V mine explosion-proof vacuum electromagnetic starter, switch manufacturers for the production of Shanxi Changzhi explosion-proof electrical plant.

2, JDB-225-A type electric integrated protector production.

3. Cable selection: U1000-3×50+1×10 rubber cable.

4. Provide sealing ring and rubber cable in the field. The sealing ring is provided with a sealing ring.

Second, the assessment project

1. Wiring process: One side of the load is connected with U1000-3×50+1×10 rubber cable. Including insulation test record, switch wiring cover cap bolt removal, cable head wiring, wiring cavity cover bolt fastening.

2. Find troubleshooting: Set 4 fault points. Troubleshooting includes troubleshooting, repair, installation, switch tuning, and self-test.

3, equipment explosion and integrity check: switch set 4 explosions or not good items. The player checks and fills in and records accurately in the tour check record form.

Third, the general score of the assessment project

Operation score = the quality score ± working hour quota.

Fourth, the assessment project quality score sheet

1, wiring process assessment quality score sheet

2, find the troubleshooting quality score sheet

3, equipment explosion and integrity check quality score sheet

V. Judging rules

1. Except for the rating items listed in the score sheet, other items are not included in the rating.

2, the wiring process time is 20 minutes, more than 30 minutes this item gets zero points.

3, the wiring process, 30 points per session plus 1 point, the time is greater than or equal to 25 seconds, 30 seconds to count; deducted 0.5 points for every 30 seconds. If the timeout is greater than or equal to 25 seconds, the time is 30 seconds.

The precondition for the extra points is that all wiring items must be completed, and the unfinished wiring process does not score. No points are added during the festival.

The precondition for the deduction is that the wiring process must be completed within 20 minutes to 30 minutes.

4, find troubleshooting, detonation and good inspection processing for a total of 25 minutes, more than 30 minutes this item gets zero points.

5, find troubleshooting, detonation and good inspection processing, add 30 points per section for 30 seconds, the time is greater than or equal to 25 seconds, press 30 seconds; deduct 30 points for every 30 seconds, more than When the time is greater than or equal to 25 seconds, it is timed by 30 seconds.

6. Use this accessory to cancel the qualification of this competition. You can use your own, homemade tools related to the game.

7. The contestants raised their hands to announce that they must leave the arena immediately after the game is over, and they are not allowed to continue or operate twice.

8, wiring process, troubleshooting and detonation intact inspection, each item must be at least zero points, no negative points.

9. Bolt loosening standard: The flattening with spring washer is subject to flattening; the above tightening direction without elastic pad is not more than 1800.

10. In the two quality assessment scores of the wiring process or the troubleshooting, each item can be deducted into a negative score, but the two total scores are deducted to zero points respectively, and no negative points appear.

11. Except for the number of written faults, self-inspection, nature and location of the fault, the time for the completion of the “assessment project completion requirements” will not be added, and the score will still be scored according to the “assessment project completion requirements” and the score sheet.

Six, the status of the game

1, wiring process

All are well-closed switches. The upper cover of the switch wiring chamber and the internal bolts and nozzle bolts are tightened and in good condition at the factory.

Unify a spare wiring cable, sealing ring, etc.

For safety reasons, the power supply is not connected before and after the wiring process, but the competitor must operate with the power supply.

2, troubleshooting

The main power supply has been switched on before the race, but there is an air switch to isolate it.

Operate the switch ground wire to the main ground.

Before the troubleshooting, the upper cover of the switching power supply wiring compartment is bolted, and the incoming power cable is connected.

At the same time, the game is equipped with a faulty JDB-225-A electric integrated protector, intact electronic components, relays, vacuum tubes, cords, fuses, fuses and other uniform objects.

3, explosion and good inspection

The switch detonation and integrity check is performed synchronously with the fault check, and is manually set in the fault switch together with the fault.

VII. Assessment project completion requirements and scoring principles

1, wiring process

Complete the requirements:

Complete the connection of a rubber cable on the load side.

Before and after wiring, the wiring compartment upper cover, internal wiring bolts, nozzles and crimping plate fixing bolts are all tightened.

Grading principle:

In the competition, the contestants must meet the requirements of the judging rules for the connection of a rubber cable. If the person is not required to complete, the game will be zero points, and the time will not be added.

2, find troubleshooting

Complete the requirements:

All four fault points that are required to be set are excluded. The same group of fault points are the same, the fault points between the groups are different, and the fault points detected and processed should be the ones given by the fault point setting group.

The instrument must be used for troubleshooting. It is strictly forbidden to use the shorting method to check the fault.

After the fault is checked, the switch shall be subjected to a live self-test and the set load of the evaluation group shall be set and recorded. After the operation is completed, write out the number of faults, parts, fault causes and phenomena, otherwise deduct points.

Grading principle:

If all the troubleshooting points are processed, the scores will be scored according to the score sheet.

Participants will be deducted 20 points for each failure point, and the remaining points after deduction will be evaluated according to the scoring standard.

If the fault point is not excluded, this item will have zero points.

If the fault points are not completely excluded or cause other faults, the points shall be deducted according to the scoring standard, and the savings time shall not be added.

3, explosion and good inspection

Complete the requirements:

The four places that are required to be set are not destroyed or are not completely detected and processed. Explosion and in good inspection and record filling shall be subject to the settings set by the personnel of the setting group. Grading principle:

The switch detonation and the integrity check processing score are included in the total score of the actual operation, accounting for 20% of the total 100 points before the actual operation score, that is, 20 points.

5 points for each check, handling, or incomplete deduction. Fill in the inspection, the processing record is incorrect, and deduct 5 points in one place.

The switch is out of blast and in good condition for a total of 20 points.

Eight, assessment quality target content

1. Speed ​​and proficiency, proper use of tools and tools.

2. Wiring technology and explosion-proof performance, tool accessories placement and civilized hygiene.

3. Whether it is operated according to the operating procedures, whether it hurts others, self-injury and damage to equipment and accessories.

4. Fault analysis, judgment, search and processing capabilities.

5, explosion-proof switch explosion and good inspection ability and processing capacity.

Nine, fault setting type

1. The type of fault may be wiring, integrated protector fault, etc.

2. There are 8 different types of faults in the low-explosion switch. Each type of fault sets 4 fault points for each low-explosive switch.

3. Because each type of switch fault is not the same, when setting the fault, the fault difficulty level should be set as close as possible, and the fault setting personnel should try to balance the fairness.

X. Assessment project score description

1, wiring process

Each item in this rating can be deducted into a negative score, and the total item is deducted to zero.

2, find troubleshooting

Each item in this rating can be deducted into a negative score, and the total item is deducted to zero.

3, the switch is out of explosion and in good condition inspection and treatment

This item is checked for one or less points for each less inspection, and 20 points are deducted.

11. If there are serious defects in the game, it shall be replaced by the on-site assessment and ruling. Strictly implement the safety operation procedures. If the operation rules are seriously violated, the qualification of this item shall be cancelled.

Thirteen, preparation before the game

1. The venue of the competition is closed. Only players who are allowed to play and those who are admitted to the competition shall not be allowed to enter at will.

2. According to the expected number of players, there are new switches, new JDB-225-A motor integrated protector, U1000-3×50+1×10 rubber cable, intact electronic components, relays, vacuum tubes, cords, fuses. , fuses, etc., according to the expected players more than 20%.

3. Judging 10 sets of motors or 10 sets of lights instead of 10 sets.

4. The referee has his own mechanical stopwatch. It is not allowed to use a mechanical stopwatch that can delay the delay.

5. The contestants bring their own tools and switch drawings related to the electric fitter, such as shaker, multimeter, electric iron, gloves, test pencil, etc.

Wiring process preparation

The switch will be placed at the scheduled site according to the number of participants in each group.

1. One participating BQD10-200ZD/660.380V mine explosion-proof vacuum electromagnetic starter, one U1000-3×50+1×10 rubber sheathed cable, two sealing rings and one tile detector. One stop and one power supply card, one gap feeler, one discharge line, one automatic air switch and one power supply connection. In order to save the competition space, there are 2 sets of 400A power supply main feed switch or automatic air switch instead.

2. A set of labor protection products other than gloves.

Find troubleshooting site preparation

1. Each participating player BQD10-200ZD/660.380V mine explosion-proof vacuum electromagnetic starter 1 set, faulty JDB-225-A type motor comprehensive protection 1 set, tile detector, stop transmission card, discharge line one, Isolation of automatic air switch and power supply wiring set, unified placement of several different electronic components, isolation of automatic air switch and power supply wiring set.

2. The referee judges use a number of motors or lights instead.

Match preparation tool material list

XIV, safety operation procedures assessment rules

1. The participating players must bring their own tools into the operation site. They must comply with the regulations. They must not bring their own spare parts. Once they are found, they will be confiscated immediately.

2. It is strictly forbidden to carry out live work. It is strictly forbidden to relocate electrical equipment with electricity.

3. When using the soldering iron, avoid flammable materials and other items that are easily burnt to avoid harm.

4. Cancellation of the competition due to damage to the equipment of the contestant's improper operation.

5. After the contestants finish the competition, they will bring their own tools to leave the scene and keep the site clean.

Fifteen, "work ticket", "scoring standard", switch explosion and good inspection processing see the table


Chapter 2: Electrician Technology Competition Scheme

First, the content of the contest:

1. Theoretical examination: coal mine employee skill training series "mine maintenance electrician", "coal safety regulations" and so on. Out of 100 points, the total score is included in the 30% conversion.

2, the actual operation:

1) Fill in the work ticket;

2), power off the switch;

3), out of 100 points, based on 70% conversion into the total score.

Second, the time and place of competition:

1. Competition time: June 13th, 20XX, 8:30-12:00.

2, practice contest location: 6KV substation.

Third, the referee group consists of:

1. Referee: Liu Weixing

2. Deputy Referee: Liu Sanyuan

3. Referees: Hao Jixing, Hao Jinhai, Amber Zhong, Zhang Zaizeng

4. Supervisor: Zhang Linsheng

5. Guardian: Zhang Yuansheng, Wang Haibo

Fourth, the contestants:

Liu Yanbing, Li Zengguang, Xue Weiwei, Wang Fusheng, Wang Qiang, Xu Dongsheng, Li Gang, 7 people

V. Competition equipment requirements:

1. The switch cabinet uses the 682 switch of the high-rise building site of the 6KV substation.

2. Check the switch and its sensitivity must be guaranteed.

3. The switch is well grounded and the indication is correct.

Sixth, the actual operation safety requirements:

1. Obey the discipline, follow the rules, and follow the instructions of the referee.

2. Select the handheld operation license to enter the site.

3. The player wears the labor protection articles correctly and strictly abides by the safety operation rules to prevent personal accidents of the equipment.

4. When starting the operation, pay attention to the operation according to the switching operation ticket program; after the operation is completed, check the surrounding environment to confirm the correctness before leaving the field.

5. Except for referees, staff and players, other personnel are strictly prohibited from entering the competition venue. Seven, the scoring standard:

Practice competitions are assessed according to practical scoring criteria.


Part 3: Electrician Technology Competition Scheme

In order to fully mobilize students' enthusiasm for studying electrical and electronic majors, to test the theoretical and internship learning results of 09 electrician students, strengthen skills, promote teaching reform, and improve teaching quality, our school's Academic Affairs Office specially holds 09-level electric and electronic professional skills competition activities.

First, the method of comparison

This competition was conducted in the XX electrician and electronics major. First, the preliminary competition was held in the class. The top 12 students can enter the finals. The finals are divided into four groups. Each group has three students. The group is selected according to the total score of each group. One, the second place of the group will be rewarded.

Second, the content and requirements of competition

Basic knowledge of electrical and electronic theory;

1. Basic knowledge questions

2. Risk rush questions

Electrical and electronic professional practice ability

1. Install the lighting circuit

2. Assemble, install ceiling fan, fluorescent lamp

three. Grading

i must answer 10 questions per question;

Ii risk questions 15 points for each question, 15 points for the wrong answer;

Iii1 lighting circuit installation 2 assembly, installation ceiling fan, fluorescent lamp

IV. Organization and review: The event was hosted by the Academic Affairs Office. The comprehensive department and the academic office cooperated. The teacher of the electrical and electronic practice instructor, Mr. Chi Minjie, served as the referee. The instructor Peng Yongjun served as the referee of the skill competition. Dai Min’an and Lu Xiaojuan were the theoretical experts. The judges, and invited leaders to play safe and civilized production and process impression points, 20 points per person.

V. List of participating students

The first group: Zhang Xiaodong Zhang Tianxun Lan Xumeng

The second group: Feng Shuai Ma Ying Liu Chuan

The third group: Qu Jinwen Zhang Yuan Guan Xiaocui

The fourth group: Wen Long Zheng Xiangyuan Li Pan

Sixth, the school leaders summed up and commended