Housing commission
The contractor ________________, ________________, is the housing committee construction agreement, the two parties agree to enter into this contract, the terms are as follows:
The first housing base is located on the land of _________ and other _________, _________ form _________ building about _________ square meters, the precise area is based on the results of local government agencies.
Article 2 The total amount of the house is RMB _________ yuan.
Article 3 Payment Methods
1. The self-provided RMB _________ yuan shall be delivered on time according to the following deadlines.
The first phase of the contract: RMB _________ yuan, delivered at the time of signing.
The second phase: RMB _________ yuan, delivered at the start of construction.
The third phase: RMB _________ yuan, delivered at the completion of the basement infrastructure.
The fourth phase: RMB _________ yuan, delivered at the completion of the Dijon building structure.
The fifth period: RMB _________ yuan, delivered at the completion of the Dijon building structure.
The sixth period: RMB _________ yuan, delivered at the completion of the construction of the first building.
The seventh phase: RMB _________ yuan, delivered at the completion of the Dijon building structure.
Second, the loan _________ yuan, if no loans, should be delivered on time according to the following deadlines.
When the exterior is completed, the RMB _________ yuan will be delivered.
The RMB _________ yuan is delivered when the license is used.
Party A shall, after receiving the notice from Party B within three days of the delivery date, pay the final amount of RMB ______________ yuan and other expenses that should be borne, and Party B shall deliver the contract to Party A.
Article 4 If the second item of the preceding article is used for loan processing, it shall be handled in accordance with the agreement of the separate agency loan power of attorney.
Article 5 In the second item of the preceding article, Party A shall pay Party B the interest calculated from the bank loan interest rate from the date of receipt of the license to the date of receipt of the loan.
Article 6 The construction standards of the house shall be handled in accordance with the architectural drawings approved by the construction management authority and the construction instructions attached to the contract. No work-saving or material-reduction phenomenon shall occur. Party A shall obtain Party B’s changes to the internal installation. Agree that the required cost of materials is calculated separately.
Article 7 Party B shall complete the work within ______ working days from the date of commencement of the project. If there is any overdue period, Party B shall pay Party A RMB _________ yuan for overdue fine every one day, but if it is due to natural disasters This is not the case if an accident that can be resisted by human beings occurs, or because Party A changes the design, or Party A delays payment.
Article 8 The scope of use of the open space and the roof balcony is as follows:
1. The underground space below the public is reserved for the public, except for the public access stairs, passages, distorted areas, and divided areas.
The second and fourth floor roof balconies are kept by the owners of the top floor, except for public facilities.
Article 9 Stairs, passages, and roadways are publicly accessible, and no resident of any floor shall place any items that affect the passage of the passage for profit.
Article 10 The property rights certificates required for the registration of the ownership of the house shall be provided by Party B. When the house is completed, it shall be handed over to the special agent of Party B for registration, and the house deed tax, supervision fee, registration fee and re-payment fee required for registration shall be paid. , stamp duty, agency fee, etc., shall be borne by Party A and delivered to Party B within the notice period.
Article 11 If, due to the use of roads, any fees and other temporary taxes levied by the government on the roads are shared by Party A according to the occupied land area.
Article 12 The house tax payable for the house of the contract shall be paid by Party A regardless of the name of Party A or Party B from the date of completion of the completion of the project.
Article 13 Party B has obtained a construction permit from the Land Bureau and has been constructed according to the plan. If Party A fails to list it as a person in time, Party B has completed the deed tax required for part of the project, and Party A shall bear the burden according to law. However, if it is listed as a person, Party A shall not request the change of the name of the person in order to facilitate the smooth progress of the project.
Article 14 The amount payable by Party A to Party B shall be paid within five days of receipt of the notice. If it has not been paid within 15 days, it shall be deemed to be voluntarily waived, and the contract shall be null and void. Party A shall call the new subscribers for a one-month period. If more than one month, Party B may confiscate all the payment paid by Party A and the completed house, Party A has no objection. The overdue loss calculation standard is calculated in RMB _________ yuan from the date of overdue payment to the date of the new call to the new subscriber. In addition, if Party A pays the amount due by cheque, it is considered a breach of contract if all or part of the cheque cannot be redeemed.
Article 15 After the handover of the house of the contract is taken over by Party A, Party B shall be responsible for the warranty for one year.
Article 16 Party A shall, with the proof of the immigration certificate given by Party B and the contract, be allowed to move in, and must pay the top of each period, various taxes and fees, and the fee for the agent before obtaining the certificate of immigration.
Article 17 Party A shall entrust Party B to supervise the construction on its behalf. Party A shall not suspend or unilaterally terminate the contract for other reasons. Party B shall supervise the construction and construction of the project, and shall pay attention to the good manager. In the event of any matters not specified in this Agreement, the parties shall deal with them in accordance with normal engineering practices in a fair and reasonable manner.
Article 18 This Agreement shall be in two copies, and each party shall hold one copy.
person A person B:________
Representative: ________________ Representative: ________________
Address: __________________________ Address: __________________________
ID card unified number: ________________ ID card unified number: ________________
_________ years _________ months ________ days _________ years _________ months ________ days
Supervisor: ________________
Representative: ________________
_________year month day
recommended article
- Engineering construction supervision commission
- Construction Engineering Design Contract (3)
- Shanghai Housing Sublease Contract Sample
- Shanghai housing rental (commercial housing pre-leasing)
- Urban residential area owner management committee charter
- Shanghai Participatory Housing Agreement
- Demonstration text of commercial housing contract
- Demonstration text of construction project contract (2)
- Qingdao Construction Project Construction Contract
- Room decoration commission
- Construction project demolition house contract
- Construction engineering technical consulting contract
popular articles
- Tao Xingzhi's famous sayings
- Strong words
- Du Yuexi's famous sayings
- Ministry of Construction, State Administration for Industry and Commerce
- Construction engineering survey contract
- Team construction contract (construction team)
- Deaf people jingle 2019
- Real estate mortgage loan contract
- Contract conditions for construction of water conservancy and hydropower civil engineering
- Taizai’s famous sayings
- Describe the fast time sentence 2019
- Qq space mood phrase
- Qingdao Construction Project Construction Contract
- 2014 is very touching words
- Teacher's famous saying
- Construction project demolition house contract (official model
- Thanks to the friend's words 2019
- The latest high school inspirational maxim
- Construction project construction contract (general)
- Temporary wall construction agreement
- Construction project entrusted supervision contract (Chinese and English)
- English famous words
- Injured sentence
- Sad love sentence 2019
- Bing Xin’s famous words
- Korean swear words
- I want to say something to the teacher.
- Classical life motto
- a good saying that loves labor
- College entrance examination inspirational quotes