Engineering survey contract model
Principal:
Contract number:
Contractor:
place of signing:
According to the "Economic Contract Law of the People's Republic of China", the "Surveying and Mapping Law of the People's Republic of China" and relevant laws and regulations, this contract was signed by both parties A and B.
Article 1 Surveying range
Article 2 Surveying and Mapping Contents
Article 3 Implementation of technical standards:
Serial number standard name standard code standard levelOther technical requirements:
Article 4 Survey and Mapping Engineering Fees:
1. The basis for the fee:
2. The total cost of the project and the project:
No. Item Name Workload Unit Price Total Project Total Price :Article 5 Obligations of Party A
1. Submit relevant information and technical requirements to Party B within __ days from the date of signing this contract.
2. Complete the validation of the technical design book within __ days from the date of receipt of the technical design document prepared by Party B.
3. It shall be responsible for ensuring that Party B's surveying and mapping team will smoothly enter the site and provide necessary conditions for Party B's work and life.
Article 6 Obligations of Party B
1. From the date of receipt of relevant information and technical requirements of Party A, complete the preparation of the technical design book within __ days according to the relevant information and technical requirements of Party A, and submit it to Party A for approval.
2. Organize the surveying and mapping team to enter the field within __ days from the date of receipt of Party A's approval of the technical design book.
3. Party B shall ensure the completion of the surveying and mapping project according to the contract period according to the requirements of the technical design book.
Article 7 Construction of the surveying and mapping project
No. Result Name Specification Quantity TimeArticle 8 Party A’s liability for breach of contract
1. After the contract is signed, Party B has no right to request the return of the deposit when the contract is terminated due to the stop of the project before Party B enters the site; Party B has already entered the site work, and Party A shall pay the total amount of work when the completed workload is less than 50%. 50% of the price; when the workload exceeds 50%, Party A shall pay 100% of the total project price.
2. If Party A fails to provide Party B with the necessary working conditions and causes stoppage or work, Party A shall pay Party B a stop and wage fee. The stop and work costs shall be calculated according to the average daily output value agreed upon in the contract, and the construction period shall be postponed.
3. If Party A fails to pay Party B's construction fee on time, Party B shall pay Party B the liquidated damages according to the number of delay days and the bank loan interest rate at that time.
4. Party A shall be obliged to keep confidential the drawings and other materials provided by Party B and the surveying and mapping results belonging to Party B, and shall not provide or use the items other than this contract to third parties. Otherwise, Party B has the right to be held liable for the losses caused.
Article 9 Party B's liability for breach of contract
1. After the contract comes into effect, if Party B arbitrarily stops or cancels the contract, Party B shall return the deposit to Party A twice.
2. If Party B fails to submit the survey results according to the date stipulated in the contract, Party A shall pay Party A the loss of the delay, and the daily loss of the delay shall be calculated at 1% of the total project price agreed in this contract.
3. If the quality of the surveying and mapping results provided by Party B is unqualified, Party B shall be responsible for re-testing or taking remedial measures without compensation to meet the quality requirements. If the quality of the survey results does not meet the requirements of the contract, Party B shall be liable for the direct losses caused thereby and bear corresponding legal liabilities.
4. Party B shall be obliged to keep confidential the drawings and technical materials provided by Party A and the surveying and mapping results belonging to Party A, and shall not transfer to third parties. Otherwise, Party A has the right to be held liable for the losses caused.
Article 10 When the contract cannot be fulfilled due to force majeure, both parties shall promptly negotiate and deal with it in accordance with relevant laws and regulations.
Article 11 Other Agreements:
Article 12 The parties shall resolve the unfinished matters in the implementation of this contract in a manner of seeking truth from facts and friendly consultation. If the two sides reach a consensus, they sign a supplementary agreement. The Supplementary Agreement is equally valid as this Agreement.
Article 13 Due to disputes between the two parties during the execution of the contract, the dispute between the two parties may be settled by negotiation between the two parties or by the competent authorities of both parties. If the agreement is not reached, the parties agree to apply to the __ Arbitration Commission for arbitration on the dispute arising from this contract. If the parties do not agree on the arbitration institution in the contract and fail to reach a written arbitration agreement afterwards, they may sue in a people's court with jurisdiction.
Article 14 Supplementary Provisions
1. This contract is signed by the representatives of both parties, and the official seal of the two parties or the special seal of the contract shall take effect. This contract is terminated after the completion of all the results of the handover and the settlement of the surveying and mapping engineering fees.
2. This contract is a __ share, A and Party B each hold __ copies.
Client's unit address:Postal code:
phone:
Bank of deposit:
Bank account number: Contractor unit address:
Postal code:
phone:
Bank of deposit:
Bank account:
The name of the client unit:
Name of the contractor:
Legal representative: Legal representative:
Or attorney:
Or attorney:
Contract conclusion time: year, month and day
Promulgation unit: Economic Contract Division of the State Administration for Industry and Commerce
recommended article
- Qingdao Construction Project Construction Contract
- Construction Engineering Design Contract (3)
- Shanghai housing rental (commercial housing pre-leasing)
- Room decoration commission
- Demonstration text of construction project contract (2)
- Demonstration text of commercial housing contract
- Shanghai Housing Sublease Contract Sample
- Construction project demolition house contract
- Urban residential area owner management committee charter
- Construction engineering technical consulting contract
- Engineering construction supervision commission
- Shanghai Participatory Housing Agreement
popular articles
- Describe the fast time sentence 2019
- Bing Xin’s famous words
- Team construction contract (construction team)
- Qingdao Construction Project Construction Contract
- Construction engineering survey contract
- Temporary wall construction agreement
- Construction project entrusted supervision contract (Chinese and English)
- a good saying that loves labor
- Qq space mood phrase
- Construction project construction contract (general)
- Strong words
- Deaf people jingle 2019
- Korean swear words
- Tao Xingzhi's famous sayings
- Du Yuexi's famous sayings
- I want to say something to the teacher.
- College entrance examination inspirational quotes
- Thanks to the friend's words 2019
- Taizai’s famous sayings
- 2014 is very touching words
- Construction project demolition house contract (official model
- English famous words
- Injured sentence
- The latest high school inspirational maxim
- Real estate mortgage loan contract
- Classical life motto
- Teacher's famous saying
- Sad love sentence 2019
- Ministry of Construction, State Administration for Industry and Commerce
- Contract conditions for construction of water conservancy and hydropower civil engineering