Construction Engineering Investigation Contract (1) (Demonstration Text) [Geotechnical Investigation, Hydrogeological Exploration
Construction engineering survey contract
[Geotechnical investigation, hydrogeological survey engineering measurement, engineering geophysical exploration]
project name:__________
construction place:__________
Contract No:__________
Survey certificate level: __________
Outsourcer: __________
Surveyor: __________
Signing date: __________
Ministry of Construction
Producer
State Administration for Industry and Commerce
March 2000
Employer __________________________________
Prospector __________________________________
The contractor entrusts the surveyor to bear ___________________________
________________________________task.
In accordance with the "Contract Law of the People's Republic of China" and the relevant national laws and regulations, in order to clarify the responsibilities and cooperate with each other in order to clarify the responsibilities and ensure the quality of engineering surveys, the contractors and surveyors agree to sign this contract and abide by them.
Article 1 Project Overview
1.1 Project Name: ___________________________
1.2 Project construction site: _________________________
1.3 Project scale and characteristics: ________________________
1.4 Engineering survey task entrusted document number, date: __________________
1.5 Engineering survey tasks and technical requirements: ________________
1.6 Acceptance method ____________________________
1.7 Estimated survey workload: ________________________
Article 2 The Employer shall promptly provide the following archives to the surveyor and be responsible for its accuracy and reliability.
2.1 Provide the approval file of this project, as well as the approval of land use, construction, and survey permit.
2.2 Provide the engineering survey task power of attorney, technical requirements and topographic map of the scope of work, the general layout of the building.
2.3 Provide the technical data and the coordinates and elevation data required for the project.
2.4 Provide information on the buried objects in the underground of the survey work and maps of specific locations.
2.5 The contractor cannot provide the above information. If the surveyor collects it, the contractor must pay the surveyor the corresponding fee.
Article 3 The surveyor submits the survey results to the contractor and is responsible for its quality.
The surveyor is responsible for submitting four copies of the survey results to the contractor, and the number of copies requested by the contractor is charged separately.
Article 4 Time and Fees and Payment Methods for Starting and Submitting Survey Results
4.1 Time for commencement of construction and submission of survey results
4.1.1 The survey work of this project is scheduled to start on ________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ Article 6 provides for handling.
4.1.2 The expiration date of the survey work shall be subject to the time specified in the notice of commencement or contract issued by the Employer. In case of special circumstances, the construction period shall be postponed.
4.2 Fees and payment methods
4.2.1 The survey of the project shall be based on the current charging standard __________ prescribed by the state; or the fees shall be calculated by means of “budget-paid”, “winning price plus visa” and “actual settlement of workload”. The charging items not specified in the nationally prescribed charging standards shall be separately negotiated by the contractor and the surveyor.
4.2.2 The project survey fee budget is ____ yuan. Within 3 days after the contract takes effect, the contractor shall pay 20% of the budget survey fee to the surveyor as a deposit, accounting for ____ yuan; a large-scale survey project with large survey scale and long construction period. The contractor shall also pay the surveyor ____% of the project progress fee according to the actual progress of the project ____%, ____ yuan; within __ days after the survey work is completed, the contractor pays the survey to the surveyor The ____% of the fee shall be ____ yuan; within 10 days after the submission of the survey results data, the contractor shall pay the full project fee in one lump sum.
Article 5 Responsibilities of the contractor and the surveyor
5.1 Contractor's Responsibility
5.1.1 When the contractor entrusts the task, the investigator shall be clearly identified in writing and the technical requirements shall be provided, and the archives shall be provided in accordance with the provisions of Article 2.
5.1.2 Within the scope of survey work, in the area where there is no data or drawings, the contractor shall be responsible for checking the underground buried objects. If the above-mentioned materials and drawings are not provided, or the data sheets provided are unreliable and the underground buried objects are unclear, When the surveyor has personal injury or economic loss during the survey work, the contractor bears civil liability.
5.1.3 The contractor shall promptly provide the surveyor with the working conditions and problems arising from the survey site and bear the expenses.
5.1.4 If the survey site needs to be guarded, especially in the case of hazardous, hazardous and dangerous on-site operations, the contractor shall send personnel to take charge of safety and security work, and carry out health care protection for the on-site personnel engaged in dangerous operations in accordance with relevant state regulations. .
5.1.5 Before the project survey, if the contractor is responsible for providing materials, it shall, according to the project materials proposed by the surveyor, provide various materials and their product qualification certificates on time, and bear the costs and transport to the site, send personnel and survey. People's personnel are accepted together.
5.1.6 Any changes in the survey process, after the formal change procedures, the contractor shall pay the survey fee according to the actual workload.
5.1.7 Provide the necessary production and living conditions for the staff of the surveyor and bear the expenses; if it is not available, the temporary facilities fee of the surveyor shall be paid ____ yuan in one lump sum.
5.1.8 Due to the reason of the contractor, the surveyor shall stop and work, except for the extension of the construction period, the contractor shall pay the stop and wages; if the contractor requests to complete the work ahead of schedule, the contractor shall The surveyor pays ____ yuan to calculate overtime pay.
5.1.9 The contractor shall protect the prospector's bid, survey plan, report, file, data drawing, data, special process, patent technology and rationalization proposal. Without the consent of the surveyor, the contractor shall not copy, not disclose, or Unauthorized modification, transmission or transfer to third parties or for use outside the contract; in the event of the above, the contractor shall be liable and the investigator shall have the right to claim.
5.1.10 The relevant provisions of this contract and other obligations of the contractor in the supplementary agreement.
5.2 Surveyor's responsibility
5.2.1 The surveyor shall conduct engineering surveys in accordance with the national technical specifications, standards, regulations and the contractor's mandate and technical requirements, and submit the quality survey results data according to the time specified in this contract and be responsible for them.
5.2.2 Due to the unqualified quality of the survey results provided by the surveyor, the surveyor shall be responsible for the replenishment and perfection of the quality of the surveyor; if the surveyor is unable to supplement and improve, and the other unit is required to be entrusted, the surveyor shall bear all the survey expenses. Or when a major economic loss or engineering accident is caused by the quality of the survey, the surveyor shall, in addition to being liable and exempt from the survey fee directly affected by the loss, pay compensation to the Employer according to the degree of loss, and the compensation shall be paid by the Employer. The surveyor agreed to be ____% of the actual loss.
5.2.3 Before the project survey, propose the survey outline or the survey organization design, and send the person and the contractor to check the materials provided by the package.
5.2.4 During the survey process, according to the geotechnical conditions and technical specifications of the project, the contractor shall be proposed to increase or decrease the workload or modify the survey work, and go through the formal change procedures.
5.2.5 The personnel of the surveyor working on the site shall abide by the safety and security of the contractor and other relevant rules and regulations, and assume the confidentiality obligations of the relevant materials.
5.2.6 The relevant provisions of this contract and other responsibilities of the surveyor in the supplementary agreement.
Article 6 Liability for breach of contract
6.1 Since the contractor has not provided the surveyor with the necessary working and living conditions, resulting in suspension, work or returning to and from the venue, the contractor shall pay the surveyor a stop and work fee, and the construction period shall be extended according to the actual working day, and shall be paid to the surveyor. Round-trip entry and exit fees and dispatch fees.
6.2 If the quality of the survey results is unqualified due to the surveyor's reasons and the technical requirements cannot be met, the reconnaissance survey costs shall be borne by the surveyor.
6.3 During the performance of the contract, if the contract is terminated due to the suspension of the project or the contractor requests to cancel the contract, if the surveyor has not carried out the survey work, the unpaid contractor has paid the deposit; if the survey has been carried out, the completed workload is less than 50%. At the time, the contractor shall pay the surveyor 50% of the budget for the survey fee of _____ yuan; when the completed workload exceeds 50%, the surveyor shall pay 100% of the survey fee for the budget.
6.4 The contractor shall not pay the survey fee at the time specified in the contract. For each more than one day, one-thousandth of the overdue liquidated damages for the unpaid survey fee shall be repaid.
6.5 Due to the reasons of the surveyor, the survey results data are not submitted according to the time specified in the contract. For each day, the survey fee shall be reduced by one-thousandth.
6.6 After the signing of this contract, the contractor does not have the right to request the return of the deposit when the contractor fails to perform the contract; when the prospector fails to perform the contract, the deposit is doubled.
Article 7 If the contract is not completed, the contractor and the surveyor shall agree to sign a supplementary agreement, and the supplementary agreement shall have the same effect as this contract.
Article 8 Other agreed matters: __________
Article 9 In the event of a dispute arising from this contract, the contractor and the surveyor shall promptly resolve the dispute, or may be mediate by the local construction administrative department. If the negotiation or mediation fails, the contractor and the surveyor agree to be arbitrated by the _____ Arbitration Commission. If the contractor or the surveyor fails to stipulate the arbitration institution in this contract and fails to reach a written arbitration agreement afterwards, he may sue the people's court.
Article 10 This contract shall become effective after it has been signed and sealed by the contractor and the surveyor; it shall be filed with the examination department prescribed by the provincial construction administrative department in accordance with the regulations; when the contractor or the surveyor deems it necessary, he shall apply for the attestation at the industrial and commercial administrative department where the project is located. . After the contractor and the surveyor fulfill the obligations stipulated in the contract, the contract is terminated.
This contract is a __ share, the contractor __ share, the surveyor __ share.
Name of the contractor: Name of the surveyor:
Legal representative: Legal representative:
Attorney: Attorney:
Residence: Residence:
Postal Code: Postal Code:
Telephone: Telephone:
Fax: Fax:
Bank of deposit: Bank of deposit:
Bank account number: Bank account number:
Construction administrative department filing: Attestation opinion:
Record number: Manager:
Date of filing: Year Month Day Date of Assess: Year Month Day
[Geotechnical investigation, hydrogeological survey engineering measurement, engineering geophysical exploration]
project name:__________
construction place:__________
Contract No:__________
Survey certificate level: __________
Outsourcer: __________
Surveyor: __________
Signing date: __________
Ministry of Construction
Producer
State Administration for Industry and Commerce
March 2000
Employer __________________________________
Prospector __________________________________
The contractor entrusts the surveyor to bear ___________________________
________________________________task.
In accordance with the "Contract Law of the People's Republic of China" and the relevant national laws and regulations, in order to clarify the responsibilities and cooperate with each other in order to clarify the responsibilities and ensure the quality of engineering surveys, the contractors and surveyors agree to sign this contract and abide by them.
Article 1 Project Overview
1.1 Project Name: ___________________________
1.2 Project construction site: _________________________
1.3 Project scale and characteristics: ________________________
1.4 Engineering survey task entrusted document number, date: __________________
1.5 Engineering survey tasks and technical requirements: ________________
1.6 Acceptance method ____________________________
1.7 Estimated survey workload: ________________________
Article 2 The Employer shall promptly provide the following archives to the surveyor and be responsible for its accuracy and reliability.
2.1 Provide the approval file of this project, as well as the approval of land use, construction, and survey permit.
2.2 Provide the engineering survey task power of attorney, technical requirements and topographic map of the scope of work, the general layout of the building.
2.3 Provide the technical data and the coordinates and elevation data required for the project.
2.4 Provide information on the buried objects in the underground of the survey work and maps of specific locations.
2.5 The contractor cannot provide the above information. If the surveyor collects it, the contractor must pay the surveyor the corresponding fee.
Article 3 The surveyor submits the survey results to the contractor and is responsible for its quality.
The surveyor is responsible for submitting four copies of the survey results to the contractor, and the number of copies requested by the contractor is charged separately.
Article 4 Time and Fees and Payment Methods for Starting and Submitting Survey Results
4.1 Time for commencement of construction and submission of survey results
4.1.1 The survey work of this project is scheduled to start on ________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ Article 6 provides for handling.
4.1.2 The expiration date of the survey work shall be subject to the time specified in the notice of commencement or contract issued by the Employer. In case of special circumstances, the construction period shall be postponed.
4.2 Fees and payment methods
4.2.1 The survey of the project shall be based on the current charging standard __________ prescribed by the state; or the fees shall be calculated by means of “budget-paid”, “winning price plus visa” and “actual settlement of workload”. The charging items not specified in the nationally prescribed charging standards shall be separately negotiated by the contractor and the surveyor.
4.2.2 The project survey fee budget is ____ yuan. Within 3 days after the contract takes effect, the contractor shall pay 20% of the budget survey fee to the surveyor as a deposit, accounting for ____ yuan; a large-scale survey project with large survey scale and long construction period. The contractor shall also pay the surveyor ____% of the project progress fee according to the actual progress of the project ____%, ____ yuan; within __ days after the survey work is completed, the contractor pays the survey to the surveyor The ____% of the fee shall be ____ yuan; within 10 days after the submission of the survey results data, the contractor shall pay the full project fee in one lump sum.
Article 5 Responsibilities of the contractor and the surveyor
5.1 Contractor's Responsibility
5.1.1 When the contractor entrusts the task, the investigator shall be clearly identified in writing and the technical requirements shall be provided, and the archives shall be provided in accordance with the provisions of Article 2.
5.1.2 Within the scope of survey work, in the area where there is no data or drawings, the contractor shall be responsible for checking the underground buried objects. If the above-mentioned materials and drawings are not provided, or the data sheets provided are unreliable and the underground buried objects are unclear, When the surveyor has personal injury or economic loss during the survey work, the contractor bears civil liability.
5.1.3 The contractor shall promptly provide the surveyor with the working conditions and problems arising from the survey site and bear the expenses.
5.1.4 If the survey site needs to be guarded, especially in the case of hazardous, hazardous and dangerous on-site operations, the contractor shall send personnel to take charge of safety and security work, and carry out health care protection for the on-site personnel engaged in dangerous operations in accordance with relevant state regulations. .
5.1.5 Before the project survey, if the contractor is responsible for providing materials, it shall, according to the project materials proposed by the surveyor, provide various materials and their product qualification certificates on time, and bear the costs and transport to the site, send personnel and survey. People's personnel are accepted together.
5.1.6 Any changes in the survey process, after the formal change procedures, the contractor shall pay the survey fee according to the actual workload.
5.1.7 Provide the necessary production and living conditions for the staff of the surveyor and bear the expenses; if it is not available, the temporary facilities fee of the surveyor shall be paid ____ yuan in one lump sum.
5.1.8 Due to the reason of the contractor, the surveyor shall stop and work, except for the extension of the construction period, the contractor shall pay the stop and wages; if the contractor requests to complete the work ahead of schedule, the contractor shall The surveyor pays ____ yuan to calculate overtime pay.
5.1.9 The contractor shall protect the prospector's bid, survey plan, report, file, data drawing, data, special process, patent technology and rationalization proposal. Without the consent of the surveyor, the contractor shall not copy, not disclose, or Unauthorized modification, transmission or transfer to third parties or for use outside the contract; in the event of the above, the contractor shall be liable and the investigator shall have the right to claim.
5.1.10 The relevant provisions of this contract and other obligations of the contractor in the supplementary agreement.
5.2 Surveyor's responsibility
5.2.1 The surveyor shall conduct engineering surveys in accordance with the national technical specifications, standards, regulations and the contractor's mandate and technical requirements, and submit the quality survey results data according to the time specified in this contract and be responsible for them.
5.2.2 Due to the unqualified quality of the survey results provided by the surveyor, the surveyor shall be responsible for the replenishment and perfection of the quality of the surveyor; if the surveyor is unable to supplement and improve, and the other unit is required to be entrusted, the surveyor shall bear all the survey expenses. Or when a major economic loss or engineering accident is caused by the quality of the survey, the surveyor shall, in addition to being liable and exempt from the survey fee directly affected by the loss, pay compensation to the Employer according to the degree of loss, and the compensation shall be paid by the Employer. The surveyor agreed to be ____% of the actual loss.
5.2.3 Before the project survey, propose the survey outline or the survey organization design, and send the person and the contractor to check the materials provided by the package.
5.2.4 During the survey process, according to the geotechnical conditions and technical specifications of the project, the contractor shall be proposed to increase or decrease the workload or modify the survey work, and go through the formal change procedures.
5.2.5 The personnel of the surveyor working on the site shall abide by the safety and security of the contractor and other relevant rules and regulations, and assume the confidentiality obligations of the relevant materials.
5.2.6 The relevant provisions of this contract and other responsibilities of the surveyor in the supplementary agreement.
Article 6 Liability for breach of contract
6.1 Since the contractor has not provided the surveyor with the necessary working and living conditions, resulting in suspension, work or returning to and from the venue, the contractor shall pay the surveyor a stop and work fee, and the construction period shall be extended according to the actual working day, and shall be paid to the surveyor. Round-trip entry and exit fees and dispatch fees.
6.2 If the quality of the survey results is unqualified due to the surveyor's reasons and the technical requirements cannot be met, the reconnaissance survey costs shall be borne by the surveyor.
6.3 During the performance of the contract, if the contract is terminated due to the suspension of the project or the contractor requests to cancel the contract, if the surveyor has not carried out the survey work, the unpaid contractor has paid the deposit; if the survey has been carried out, the completed workload is less than 50%. At the time, the contractor shall pay the surveyor 50% of the budget for the survey fee of _____ yuan; when the completed workload exceeds 50%, the surveyor shall pay 100% of the survey fee for the budget.
6.4 The contractor shall not pay the survey fee at the time specified in the contract. For each more than one day, one-thousandth of the overdue liquidated damages for the unpaid survey fee shall be repaid.
6.5 Due to the reasons of the surveyor, the survey results data are not submitted according to the time specified in the contract. For each day, the survey fee shall be reduced by one-thousandth.
6.6 After the signing of this contract, the contractor does not have the right to request the return of the deposit when the contractor fails to perform the contract; when the prospector fails to perform the contract, the deposit is doubled.
Article 7 If the contract is not completed, the contractor and the surveyor shall agree to sign a supplementary agreement, and the supplementary agreement shall have the same effect as this contract.
Article 8 Other agreed matters: __________
Article 9 In the event of a dispute arising from this contract, the contractor and the surveyor shall promptly resolve the dispute, or may be mediate by the local construction administrative department. If the negotiation or mediation fails, the contractor and the surveyor agree to be arbitrated by the _____ Arbitration Commission. If the contractor or the surveyor fails to stipulate the arbitration institution in this contract and fails to reach a written arbitration agreement afterwards, he may sue the people's court.
Article 10 This contract shall become effective after it has been signed and sealed by the contractor and the surveyor; it shall be filed with the examination department prescribed by the provincial construction administrative department in accordance with the regulations; when the contractor or the surveyor deems it necessary, he shall apply for the attestation at the industrial and commercial administrative department where the project is located. . After the contractor and the surveyor fulfill the obligations stipulated in the contract, the contract is terminated.
This contract is a __ share, the contractor __ share, the surveyor __ share.
Name of the contractor: Name of the surveyor:
Legal representative: Legal representative:
Attorney: Attorney:
Residence: Residence:
Postal Code: Postal Code:
Telephone: Telephone:
Fax: Fax:
Bank of deposit: Bank of deposit:
Bank account number: Bank account number:
Construction administrative department filing: Attestation opinion:
Record number: Manager:
Date of filing: Year Month Day Date of Assess: Year Month Day
recommended article
- Construction Engineering Design Contract (3)
- Demonstration text of commercial housing contract
- Construction engineering technical consulting contract
- Engineering construction supervision commission
- Room decoration commission
- Urban residential area owner management committee charter
- Shanghai Housing Sublease Contract Sample
- Qingdao Construction Project Construction Contract
- Shanghai Participatory Housing Agreement
- Shanghai housing rental (commercial housing pre-leasing)
- Construction project demolition house contract
- Demonstration text of construction project contract (2)
popular articles
- I want to say something to the teacher.
- Deaf people jingle 2019
- Describe the fast time sentence 2019
- Contract conditions for construction of water conservancy and hydropower civil engineering
- Strong words
- 2014 is very touching words
- Qq space mood phrase
- Taizai’s famous sayings
- Teacher's famous saying
- Classical life motto
- Team construction contract (construction team)
- Tao Xingzhi's famous sayings
- Construction project entrusted supervision contract (Chinese and English)
- Injured sentence
- Construction engineering survey contract
- Real estate mortgage loan contract
- Thanks to the friend's words 2019
- Bing Xin’s famous words
- Korean swear words
- Du Yuexi's famous sayings
- Construction project construction contract (general)
- Qingdao Construction Project Construction Contract
- The latest high school inspirational maxim
- Temporary wall construction agreement
- English famous words
- a good saying that loves labor
- Construction project demolition house contract (official model