Construction project contract agreement clause
Construction project contract agreement clause
Party A:
Party B:
In accordance with the principles of the Economic Contract Law of the People's Republic of China and the Regulations on Contracts for Construction and Installation Contracts, in accordance with the specific circumstances of the project, the parties reached the following agreement.
Article 1 Project Overview.
1.1 Project Name:
construction place:
Engineering Content:
Contracting scope:
1.2 Start date:
Completion date:
Total calendar date:
1.3 Quality level:
1.4 Contract price:
Article 2 Contract files and order of interpretation.
Article 3 The language, standards and applicable laws used in the contract file.
3.1 Contract language:
3.2 Applicable laws and regulations:
3.3 Applicable standards and specifications:
Article 4 drawings.
4.1 Drawing date provided
4.2 Drawings provide sets:
4.3 Special confidentiality requirements and fees for drawings:
Article 5 Party A's representative at the construction site.
5.1 List of Party A Resident Representatives and Delegates:
5.2 Name of the chief engineer who exercises social supervision and its authorized scope:
Article 6 Representatives of Party B in the construction site
Article 7 Party A works.
7.1 The construction site has the requirements for start-up conditions and completion time:
7.2 Time, place and supply requirements for water, electricity, telecommunications and other construction pipelines entering the construction site:
7.3 Opening hours and starting and ending locations of main traffic trunks and their public roads in the construction site:
7.4 Engineering Geology and Underground Pipeline Network Data Availability:
7.5 Handling documents, the name of the approval document and the completion time:
7.6 Level and coordinate control point location provision and inspection requirements:
7.7 The time for reviewing the drawings and design:
7.8 Protection requirements for buildings and underground pipelines around the construction site:
Article 8 Party B works.
8.1 Construction drawings and supporting design names, completion time and requirements:
8.2 Provide the name, time and number of copies of the plan, report:
8.3 Requirements for construction protection work:
8.4 Requirements for providing office and living facilities to Party A representatives:
8.5 Requirements for traffic and noise at the construction site:
8.6 Requirements for finished product protection:
8.7 Protection requirements for buildings and underground pipelines around the construction site:
8.8 Requirements for clean and hygienic construction site:
Article 9 progress plan.
9.1 Time for Party B to provide construction organization design and progress plan:
9.2 The time approved by Party A's representative.
Article 10 is postponed.
Article 11 suspension of construction.
Article 12 Delay in construction period.
Article 13 is scheduled in advance.
Article 14 Inspection and rework.
Article 15 Engineering quality level.
15.1 Economic Expenditure Requirements for Engineering Quality Level:
15.2 Quality Assessment Arbitration Department Name:
Article 16 Concealed works, intermediate acceptance.
16.1 Intermediate acceptance site and time:
Article 17 test drive.
Article 18 Acceptance and re-inspection.
Article 19 Contract price and adjustment.
19.1 Conditions for adjustment:
19.2 Ways of adjustment:
Article 20 Project advance payment.
20.1 Total amount of prepaid work:
20.2 Prepaid time and ratio:
20.3 Deduction time and ratio:
20.4 Party A shall not be liable for breach of contract on time:
Article 21 Verification of the quantity of work.
21.1 The time and requirements for Party B to submit the engineering quantity report:
Article 22 Payment of works.
22.1 Payment method of project payment:
22.2 Payment amount and time of project payment:
22.3 Party A's liability for breach of contract:
Article 23 Party A supplies materials and equipment.
23.1 Party A's requirements for materials and equipment:
Article 24 Party B purchases materials and equipment.
Article 25 Design changes.
Article 26 determines the price of the change.
Article 27 Completion acceptance.
27.1 When Party B submits the completion data and acceptance report:
27.2 Time and number of copies submitted by Party B to the as-built drawings:
Article 28 is completed and settled.
28.1 Settlement method:
28.2 When Party B submits the settlement report:
28.3 When Party A approves the settlement report:
28.4 The time when Party A will send the notice of the grant to the handling bank:
28.5 Party A's liability for breach of contract:
Article 29 warranty.
29.1 Warranty content and scope:
29.2 Warranty period:
29.3 Warranty amount and payment method:
29.4 Warranty Interest Rate:
Article 30 Disputes.
30.1 Dispute Resolution Program:
30.2 Dispute Resolution:
Article 31 is a breach of contract.
31.1 Treatment of default:
31.2 The amount of liquidated damages:
31.3 Calculation method of loss:
31.4 Interest rate of Party A not paying on time:
Article 32 Claim.
Article 33 Safety construction.
Article 34 Patent technology, special processes and rationalization proposals.
Article 35 Underground obstacles and cultural relics.
Article 36 Project subcontracting.
36.1 Subcontracting unit and subcontracted project content:
36.2 Settlement method for subcontracted project price:
Article 37 Force majeure.
37.1 Standards for determining natural disasters that are force majeure:
Article 38 Insurance.
Article 39 The project is suspended or slowed down.
Article 40 The entry into force and termination of the contract.
40.1 Contract Effective Date:
Article 41 Contracts:
41.1 Copies of the contract:
41.2 Responsibilities for the distribution of the contract:
41.3 Contract book development costs:
Contract conclusion time: year, month and day
Employer: Contractor:
Address: Address:
Legal representative: legal representative:
Principal agent entrusted agent
Phone: Phone:
Electric hanging: Electric hanging:
Bank of deposit: Bank of deposit:
Account number: Account number:
Postal Code: Postal Code:
Forensic opinion:
Manager:
Assurance authority
year month day
Party A:
Party B:
In accordance with the principles of the Economic Contract Law of the People's Republic of China and the Regulations on Contracts for Construction and Installation Contracts, in accordance with the specific circumstances of the project, the parties reached the following agreement.
Article 1 Project Overview.
1.1 Project Name:
construction place:
Engineering Content:
Contracting scope:
1.2 Start date:
Completion date:
Total calendar date:
1.3 Quality level:
1.4 Contract price:
Article 2 Contract files and order of interpretation.
Article 3 The language, standards and applicable laws used in the contract file.
3.1 Contract language:
3.2 Applicable laws and regulations:
3.3 Applicable standards and specifications:
Article 4 drawings.
4.1 Drawing date provided
4.2 Drawings provide sets:
4.3 Special confidentiality requirements and fees for drawings:
Article 5 Party A's representative at the construction site.
5.1 List of Party A Resident Representatives and Delegates:
5.2 Name of the chief engineer who exercises social supervision and its authorized scope:
Article 6 Representatives of Party B in the construction site
Article 7 Party A works.
7.1 The construction site has the requirements for start-up conditions and completion time:
7.2 Time, place and supply requirements for water, electricity, telecommunications and other construction pipelines entering the construction site:
7.3 Opening hours and starting and ending locations of main traffic trunks and their public roads in the construction site:
7.4 Engineering Geology and Underground Pipeline Network Data Availability:
7.5 Handling documents, the name of the approval document and the completion time:
7.6 Level and coordinate control point location provision and inspection requirements:
7.7 The time for reviewing the drawings and design:
7.8 Protection requirements for buildings and underground pipelines around the construction site:
Article 8 Party B works.
8.1 Construction drawings and supporting design names, completion time and requirements:
8.2 Provide the name, time and number of copies of the plan, report:
8.3 Requirements for construction protection work:
8.4 Requirements for providing office and living facilities to Party A representatives:
8.5 Requirements for traffic and noise at the construction site:
8.6 Requirements for finished product protection:
8.7 Protection requirements for buildings and underground pipelines around the construction site:
8.8 Requirements for clean and hygienic construction site:
Article 9 progress plan.
9.1 Time for Party B to provide construction organization design and progress plan:
9.2 The time approved by Party A's representative.
Article 10 is postponed.
Article 11 suspension of construction.
Article 12 Delay in construction period.
Article 13 is scheduled in advance.
Article 14 Inspection and rework.
Article 15 Engineering quality level.
15.1 Economic Expenditure Requirements for Engineering Quality Level:
15.2 Quality Assessment Arbitration Department Name:
Article 16 Concealed works, intermediate acceptance.
16.1 Intermediate acceptance site and time:
Article 17 test drive.
Article 18 Acceptance and re-inspection.
Article 19 Contract price and adjustment.
19.1 Conditions for adjustment:
19.2 Ways of adjustment:
Article 20 Project advance payment.
20.1 Total amount of prepaid work:
20.2 Prepaid time and ratio:
20.3 Deduction time and ratio:
20.4 Party A shall not be liable for breach of contract on time:
Article 21 Verification of the quantity of work.
21.1 The time and requirements for Party B to submit the engineering quantity report:
Article 22 Payment of works.
22.1 Payment method of project payment:
22.2 Payment amount and time of project payment:
22.3 Party A's liability for breach of contract:
Article 23 Party A supplies materials and equipment.
23.1 Party A's requirements for materials and equipment:
Article 24 Party B purchases materials and equipment.
Article 25 Design changes.
Article 26 determines the price of the change.
Article 27 Completion acceptance.
27.1 When Party B submits the completion data and acceptance report:
27.2 Time and number of copies submitted by Party B to the as-built drawings:
Article 28 is completed and settled.
28.1 Settlement method:
28.2 When Party B submits the settlement report:
28.3 When Party A approves the settlement report:
28.4 The time when Party A will send the notice of the grant to the handling bank:
28.5 Party A's liability for breach of contract:
Article 29 warranty.
29.1 Warranty content and scope:
29.2 Warranty period:
29.3 Warranty amount and payment method:
29.4 Warranty Interest Rate:
Article 30 Disputes.
30.1 Dispute Resolution Program:
30.2 Dispute Resolution:
Article 31 is a breach of contract.
31.1 Treatment of default:
31.2 The amount of liquidated damages:
31.3 Calculation method of loss:
31.4 Interest rate of Party A not paying on time:
Article 32 Claim.
Article 33 Safety construction.
Article 34 Patent technology, special processes and rationalization proposals.
Article 35 Underground obstacles and cultural relics.
Article 36 Project subcontracting.
36.1 Subcontracting unit and subcontracted project content:
36.2 Settlement method for subcontracted project price:
Article 37 Force majeure.
37.1 Standards for determining natural disasters that are force majeure:
Article 38 Insurance.
Article 39 The project is suspended or slowed down.
Article 40 The entry into force and termination of the contract.
40.1 Contract Effective Date:
Article 41 Contracts:
41.1 Copies of the contract:
41.2 Responsibilities for the distribution of the contract:
41.3 Contract book development costs:
Contract conclusion time: year, month and day
Employer: Contractor:
Address: Address:
Legal representative: legal representative:
Principal agent entrusted agent
Phone: Phone:
Electric hanging: Electric hanging:
Bank of deposit: Bank of deposit:
Account number: Account number:
Postal Code: Postal Code:
Forensic opinion:
Manager:
Assurance authority
year month day
recommended article
- Engineering construction supervision commission
- Shanghai Participatory Housing Agreement
- Room decoration commission
- Urban residential area owner management committee charter
- Construction engineering technical consulting contract
- Shanghai Housing Sublease Contract Sample
- Construction project demolition house contract
- Construction Engineering Design Contract (3)
- Qingdao Construction Project Construction Contract
- Demonstration text of commercial housing contract
- Shanghai housing rental (commercial housing pre-leasing)
- Demonstration text of construction project contract (2)
popular articles
- Deaf people jingle 2019
- Injured sentence
- The latest high school inspirational maxim
- Sad love sentence 2019
- Contract conditions for construction of water conservancy and hydropower civil engineering
- Construction project construction contract (general)
- 2014 is very touching words
- a good saying that loves labor
- English famous words
- Temporary wall construction agreement
- Ministry of Construction, State Administration for Industry and Commerce
- Team construction contract (construction team)
- Teacher's famous saying
- Taizai’s famous sayings
- Construction project entrusted supervision contract (Chinese and English)
- Classical life motto
- College entrance examination inspirational quotes
- Construction engineering survey contract
- Bing Xin’s famous words
- Describe the fast time sentence 2019
- Thanks to the friend's words 2019
- Qq space mood phrase
- Qingdao Construction Project Construction Contract
- Strong words
- Korean swear words
- Du Yuexi's famous sayings
- Construction project demolition house contract (official model
- I want to say something to the teacher.
- Real estate mortgage loan contract
- Tao Xingzhi's famous sayings