Fan Wen Daquan > Contract Model > Construction Engineering Contract Model

Construction and installation project contract agreement terms


Enter into the contract:

Construction unit:_________
Construction unit:_________
After full consultation, the two parties reached the following agreement:

Article 1: Project Name:

Article 2: Project location:

Article 3: Building area:

Article 4: Project price and payment method:

Article 5: Project deadline

Article 6: Engineering Quality Standards

Article 7: Contracting form and supply of materials and equipment

Article 8: Obligation of the Employer:

1. Before the start of construction ___ days, Party A will give Party B a construction drawing ___ share, and do "three links and one leveling"; do a good construction permit.

2. According to the agreement, according to the agreement, before the start of construction, ___ Tian A party will provide a good supply of materials and submit it to Party B for approval.

3. Responsible for organizing the design and construction units, jointly reviewing the construction organization design, responsible for organizing the inspection and acceptance work, and supervising the quality of the project.

4. Responsible for the timely allocation according to the agreement.

5. ......

Article 9: Contractor’s Obligation

Party B is responsible for:

1. The division of labor is responsible for the supply of materials.
2. Prepare a construction organization design and construction image schedule. Submit Party A in duplicate 5 days before the start of construction.
3. According to the construction drawing, the construction was carried out and completed on schedule.
4. After completion, the completed data will be arranged in a reasonable manner within 5 days.
5. Ensure the construction quality and strictly follow the national construction acceptance criteria.
6. ......

Article 10: Liability for breach of contract and incentive clause

Article 11: Other terms of assistance.

Article 12: The original of this contract is ___ share, one for each contractor and the contractor, and one for each of _____ and ______.

Article 13: The validity period of the contract and the settlement of the contract dispute.

Article 14: Schedules and other files with contractual effects.

Employer: Contractor:
Legal representative: _____ legal representative: ______
Address: ________ Address: _________
Bank of deposit: ______ Bank of deposit: _______
Account number: ________ account number: _________

Signing date: ____ years __ month __ day

recommended article

popular articles