Fan Wen Daquan > Contract Model > Construction Engineering Contract Model

Family room decoration and construction contract


The contractor: _____ and the contractor: _____ In order to safeguard the rights and interests of both parties, in accordance with the current laws, regulations and rules, in conjunction with the specific circumstances of the project, this contract is signed and complied with.

Chapter 1 Contract Background

The first construction site is located in the _____ city _____ district _____ road _____ get _____ _____ room. The house was completed and accepted and delivered.

Article 2 Party A entrusts Party B to construct the house to make the house safe, hygienic, beautiful, livable, convenient to live, and pleasant to the mood.

Chapter II Qualifications of Construction Units

Article 3 Party B is an enterprise legal person approved and registered by the industrial and commercial administration authority. It has passed the latest annual inspection of the enterprise and has the qualifications for the civil building decoration and decoration project approved by the construction administrative authority. The qualification level meets the requirements of this construction. If Party B does not have the qualification for business or the corresponding qualifications, Party A has the right to terminate this contract. Party B shall immediately return the expenses already paid by Party A and compensate Party B for the losses.

Article 4 Before the signing of this contract, Party B shall present to Party A the originals of the Business License and the Qualification Certificate.

Chapter III Construction Content

Article 5 The house belongs to the _____ structure, the room type is _____ room _____ hall _____ kitchen _____ wei, the total construction area is _____ square meters; the construction is the _____ room _ ____ hall _____ kitchen _____ Wei, construction area is _____ square meters. For details, please refer to the Red Line Determination section in the Room Map as an attached file of this contract.

Article 6 The construction contents and practices are as follows:

Hall: ground part _____, wall part _____, ceiling part _____, door and window part _____, other _____;

Room: ground part _____, wall part _____, ceiling part _____, door and window part _____, other _____;

Kitchen: ground part _____, wall part _____, ceiling part _____, door and window part _____, other _____;

Wei: Ground part _____, wall part _____, ceiling part _____, door and window part _____, other _____;

Others: the ground part _____, the wall part _____, the ceiling part _____, the door and window part _____, other _____; if the preceding paragraph does not explain, it is determined according to the "renovation construction drawing" which is the attached file of this contract.

Chapter IV Materials, Equipment and Prices

Article 7 The materials and equipment used for construction shall be referred to as the “Main Material Quotation” as the subsidiary file of this contract, and the “Annual Material Quotation” as the subsidiary file of this contract. The labor expenses of Party B shall be referred to as the “labor fee” as the subsidiary file of this contract. Quotation.

Articles 8 to 13 shall apply in the case where Party B provides materials, equipment and services for construction use.

Article 9 The total price of the house project is _____ yuan, including material fee _____ yuan, labor fee _____ yuan, management fee _____ yuan, design fee _____ yuan, garbage clearance freight _____ Yuan, tax _____ yuan, other expenses _____ yuan. The total project price is the sum of the price of each item.

The total price and itemized price mentioned in the preceding paragraph are the budget price of Party B. If the settlement price exceeds the budget price, Party A shall pay the total project price according to the budget price; if the settlement price is lower than the budget price, Party A shall pay the total project price at the settlement price. Article 9 Party B's quotation for material, labor, management, design, and garbage clearance shall not exceed the market average price of the fee at the time of signing this contract.

If Party B's quotation in this contract exceeds the market average price, it shall be settled at the market average price.

If the two parties disagree with the average market price mentioned in the preceding paragraph, they may entrust the price assessment department to evaluate and the evaluation conclusions of the price assessment department shall be accepted by both parties.

Article 10 Party B shall indicate the name of the materials and equipment, the name of the manufacturer, the name of the factory, the brand, the model, the specification, the grade, the price and the quantity in the "Quote of Main Materials" and "Quotes of Auxiliary Materials".

If the materials and equipment provided and used by Party B are inconsistent with the provisions of the “Main Material Quotation” and “Auxiliary Material Quotation”, Party A has the right to choose to deal with it in one of the following ways: Party B shall accept:

If Party A agrees to continue to use it, Party B shall waive the cost of the materials and equipment;

If Party A does not agree to continue to use it, Party B shall replace and redo according to the provisions of the "Main Material Quotation" and "Auxiliary Material Quotation", and the replacement materials and equipment fees shall be halved, and the original construction period shall remain unchanged.

Article 11 Party B shall submit a copy of the specification, warranty, environmental protection manual and purchase invoice. If Party A requests to check the original, Party B shall agree. The product name, brand, model, specification, grade, price and quantity should be stated on the invoice.

Article 12 The quality of the materials and equipment provided by Party B must conform to the national standards, and the quality inspection certificate and the name, specification, model, manufacturer's name, and factory address of the product with Chinese mark shall not be used for the decoration and decoration of the building that has been eliminated by the state. Materials and equipment.

The materials and equipment provided by Party B must comply with national environmental protection standards, including but not limited to indoor air quality, radiation, lighting and noise intensity after completion, so that Party A can achieve safe living and living purposes.

If Party B violates the provisions of the preceding two paragraphs, it shall immediately replace and redo it. The materials and equipment after replacement shall not be charged, and the original construction period will remain unchanged.

Article 13 If Party A changes the construction content, Party B shall agree. If the contents of the construction period, the total price, the "Main Material Quotation" and the "Auxiliary Materials Quotation" change accordingly, it shall take effect after Party A's written confirmation.

Articles 14 to 16 shall be applicable to Party A providing materials and equipment for construction use and Party B providing labor services.

Article 15 The total project price of the house is _____ yuan, including labor costs _____ yuan, tax _____, and other expenses _____ yuan.

Article 16 The materials and equipment provided by Party A shall be delivered to the site on time, and Party B shall go through the formalities of acceptance. If the materials and equipment provided by Party A do not meet the national standards, Party B shall submit to Party A in writing after the acceptance, and Party A shall still indicate the use, and Party A shall bear the responsibility. If the materials and equipment supplied by Party A arrive at the scene and the damage occurs after acceptance by Party B, Party B shall compensate.

Article 17 The materials and equipment provided by Party A shall be used for the project; Party B shall not use it for other purposes without the consent of Party A.

If the materials and equipment provided by Party A are in short supply or replaced due to Party B's reasons, Party B shall compensate Party A according to the price of the shortage of materials and equipment or the difference of 10 times before and after the replacement of materials and equipment.

Chapter V Payment Methods

Article 18 The construction cost shall be paid as follows:

After the signing of this contract, Party A shall pay the construction cost equivalent to 30% of the total price two to five days before the commencement of construction;

Within three days after the date of completion of 50% of the project quantity, Party A shall pay the construction cost equivalent to 40% of the total price;

Within three days after the completion of the acceptance, Party A shall pay the construction cost equivalent to 25% of the total price.

After one year of completion acceptance or the expiration of the agreed warranty, Party A shall pay the construction cost equivalent to 5% of the total price.

If Party A pays the construction cost and Party B’s salesman or construction personnel collect it, it shall be deemed that Party B will collect it.

Article 19 If the total price is increased or decreased due to the change of construction content, Party A shall pay or collect the increase or decrease amount on the date of completion of the acceptance check.

Article 20 A receipt shall be issued for the payment of money between the two parties. After the completion of construction, Party A shall issue a legal invoice after Party A fully pays the amount due.

Article 21 After the completion acceptance is passed, Party A has the right to retain a warranty fund equivalent to 5% of the total project price. If there is no engineering quality problem within one year after the completion of the acceptance check, Party A shall refund the full amount of the warranty fund to Party B.

Chapter VI Settlement

Article 22 If the project is completed and Party A has any objection to the price after acceptance, Party B may request a period of no more than seven days. During the period of the price, Party A has the right to suspend payment to Party B. Party B shall agree. If Party A entrusts a third party to conduct the assessment, the period of the nuclear price will expire on the date of obtaining the assessment report.

If Party A entrusts a third party to evaluate the price, the price agreed upon in the “Main Material Quotation” and “Auxiliary Material Quotation” shall be used as the basis for calculating the total price, and Party B shall agree to settle the total price according to the evaluation result.

Chapter VII Project Progress

Article 23 The project is started on the _____ year _____ month __ day, _____ year _____ month _____ day is completed, the construction period is _____ days. The daily construction time is _____ _____ points to _____ _____ points.

During the construction period of the construction period, if Party B fails to construct, regardless of whether the project is completed or not, the construction will be processed on the 1st day of the unscheduled construction period. It is handled by one day for less than one day.

Chapter VIII Construction

Article 24 Party B shall assign _____ as the representative of the project resident site, and be responsible for the performance of this contract, including organizing construction according to requirements, coordinating and handling all matters handled by Party B. Party B shall recognize the actions of its assigned resident representative.

If Party B replaces the representative of the construction site, Party A shall notify Party A in writing; before Party A receives the notice of replacement, Party B shall recognize the behavior of the original resident representative.

Article 25 Party B shall construct the project itself and may not subcontract the project to any third party without the consent of Party A.

Article 26 The project shall implement dbj08-62-97 "Technical Regulations for Residential Building Engineering", db31/t30-1999 "Residential Acceptance and Acceptance Standards for Residential Buildings", and other standards and quality assessments and acceptances formulated by the State and the municipal administrative department of construction. Standard and agreement between the two parties.

Article 27 During the construction period, Party A and its representatives have the right to view, understand and inspect the construction situation on the spot, and Party B shall cooperate; however, Party A shall not affect Party B's construction.

Article 28 Party B shall construct according to the mandatory standards for construction projects and other technical standards, complete the project in accordance with the design, construction plan and practice instructions approved by Party A to ensure the quality of the project and shall not cut corners.

Article 29 During the construction period, if Party A modifies the design plan and changes the construction plan accordingly, and increases or decreases the construction content, Party B shall notify Party B before the construction of the changed project, and Party B shall construct according to the requirements of Party A.

If Party A changes, increases or decreases the construction project, it shall sign with Party B the “Project Change Order” which is the subsidiary file of this contract.

If Party A changes the type of work resulting in the completion date and the total price of the project, it shall be handled in accordance with the provisions of Article 13 of this contract.

Article 30 Party B shall not alter the main body of the building and the structure of the load-bearing structure during construction, and shall not fold or change the supply of sputum, gas pipelines, or other acts that affect the building structure, endanger the safety of use, and exceed the original design standards of the house.

Party A may request the implementation of the acts prohibited by the preceding paragraph, and Party B may refuse, but shall provide amendments.

Article 31 Party B shall abide by the construction safety operation rules and take necessary safety protection and fire-fighting measures to ensure the safety of the operators and avoid the loss of Party A's houses and other property.

If Party B violates the provisions of the preceding paragraph and causes losses, it shall compensate.

Article 32 During construction, public space shall not be invaded, and facilities in public parts shall not be damaged. If Party B violates the provisions of the preceding paragraph and causes disputes between neighboring disputes and property companies and any third parties, it shall be responsible for handling the losses caused by Party A, and shall be compensated.

Article 33 The expenses for water, electricity, gas, telephone and other public utilities incurred at the construction site shall be borne by Party A, but if the average daily expenditure exceeds the following limit, the excess shall be borne by Party B: water fee _____ yuan/day, Electricity fee _____ yuan / day, gas fee _____ yuan / day, telephone fee _____ yuan / day.

The utility expenses incurred on the construction site mentioned in the preceding paragraph are the ratio of the total amount of the expenses during the construction period to the number of construction days, and the payment notice or receipt of the utility enterprise is the basis for determining the expenses.

Chapter IX Acceptance

Article 34 After the completion of the concealed project, Party B shall notify Party A in writing three days before the completion of the work, and Party A shall participate in the acceptance according to the time notified by Party B. If Party A fails to accept the goods on time, Party B shall be notified to arrange another time.

Party A cannot check and accept in time, which may cause Party B to delay the construction period. Party B can organize personnel to accept the inspection, and Party A should accept the acceptance result. If Party A requests re-inspection afterwards, Party B shall go through the re-inspection as required. If the re-inspection is qualified, the re-inspection and rework expenses shall be borne by Party A, and the construction period shall be postponed.

Article 35 After the completion of the project, Party B shall notify Party A in writing five days before the completion of the project, and Party A shall, within seven days after receiving the notice, organize the acceptance according to the contract of the engineering design contract and the corresponding quality standards, and the acceptance shall be handled. Acceptance and handover procedures, signing the “Engineering Quality Acceptance Form” as the subsidiary file of this contract and the “Project Checklist” as the subsidiary file of this contract.

Party B shall issue the "House Interior Decoration Quality Warranty" as an auxiliary file of this contract. If Party A fails to organize the inspection and acceptance within the stipulated time, Party B shall promptly notify Party B to determine the acceptance date. If the acceptance is qualified, Party A shall acknowledge the original completion date.

Article 36 If Party B loses personal or property rights due to construction quality problems, Party B shall not be exempted from liability for compensation due to Party A’s failure or failure to comply with the provisions of Articles 33 and 34 of this contract. .

Chapter 10 Warranty

Article 37 The project warranty period is three years. The leakage resistance of kitchens, bathrooms and exterior walls with waterproof requirements is five years. The warranty period is calculated from the date of completion acceptance.

Chapter 11: Liability for breach of contract

Article 38 Party A violates the provisions of the first paragraph of Article 17 of this contract. For each day overdue, Party B shall pay Party B the liquidated damages in accordance with the four-thousandth of the overdue amount.

Article 39 Party B shall, in violation of the provisions of Article 22 of this contract, pay a penalty of _____ for each day overdue; however, due to reasons of Party A or the construction project confirmed by Party A in writing, etc. Except for extended periods.

Article 40 Party B has the right to terminate this contract in violation of the provisions of Articles 25 and 27 of this contract, and requires Party B to compensate for the loss.

Article 41 If Party B violates the provisions of the first paragraph of Article 29 of this contract, Party A has the right to request Party B to redo or cancel this contract. If the original construction period is unchanged and Party A loses, Party B shall compensate.

Article 42 If Party A violates the provisions of the second paragraph of Article 34 and causes Party B's loss, Party A shall compensate.

Article 43 After the commencement of this contract, if either party requests termination of the contract, the contract shall be terminated after the party that has terminated the contract pays the other party a penalty of 10% of the total price of the project.

Chapter 12 Others

Article 44 If a dispute arises between the two parties in the performance of this contract and the negotiation fails, the following _____ ways shall be adopted:

Apply to the _____ Arbitration Commission for arbitration;

Prosecuted to the people's court

Article 45 The original of this contract is in quadruplicate, and both parties shall hold two copies.

person A person B:_____

ID number: _____ Legal representative: _____

Attorney: _____ Attorney: _____

ID card number: _____ ID card number: _____

Address: _____ Address: _____

Phone: _____ Phone: _____

Zip code: _____ Zip code: _____

Date: _____ year _____ month _____ day