Processing agreement
No.: emt_____ Date: ____ years __month __ day in ____ for the development of friendly cooperation between the two sides in the production of fishing nets, to enhance the friendship between the Chinese and Japanese people, China XX fishing net factory, address: ____ city ___ and Japan ____ system Net Co., Ltd., Address: Ako City, Hyogo Prefecture, Japan; electric hanging marumako; telex 5778785momoi-aj, in the China Light Industry Products Import and Export Corporation × × province branch, the complete set of equipment is divided into new and old parts, is brand new, Its performance is internationally advanced; it is a semi-old equipment, its main parts need to be completely renewed, and after extensive overhaul, its performance is the same as the new type of equipment of the same type, the price of equipment and parts is a preferential price.
The production capacity of the complete set of equipment must reach an annual output of more than 500 tons of fishing nets. Party B is responsible for ensuring the normal operation of mechanical performance. If the mechanical failure or non-operational error occurs within 1 year and 6 months after the equipment is put into operation, Party B It shall be responsible for dispatching engineering and technical personnel for repairs and free supply of spare parts. Party B shall be responsible for compensation for the losses caused by the suspension of production and shutdown. A mechanical failure will occur one and a half years later, and the reasons shall be ascertained.
After the signing of the agreement, Party B shall proceed to prepare according to the above requirements. Party A shall send personnel to Party B's factory to visit the equipment and equipment performance, which shall be subject to the acceptance of the ___ factory. Mechanical patents and technical materials are provided free of charge by Party B.
2. Party B is responsible for providing the raw materials and auxiliary materials required for the complete set of equipment with 46 sets of netting machines to be temporarily stored in Party A, commissioning processing, and ensuring a balanced supply on a monthly basis.
3. Party A is responsible for providing the corresponding plant, water, electricity, labor and packaging materials, and is responsible for processing the fishing nets according to the specifications, quantity and quality required by Party B, and collecting processing fees. All products are sold to Party B.
4. Both parties agree that the equipment price and processing fee are settled in Japanese Yen.
Second, the number of processing and processing fee B guarantees that the annual processing fee of fishing nets is more than 500 tons per year, and the processing fee income is not less than 240 million yen. Party A guarantees to process the above-mentioned 500 tons or more or the processing income of more than 240 million yen. Productivity. Four months from the normal operation of the complete set of equipment, the trial production and worker training period, during which the processing fee is increased by 60% in the first month based on the processing price agreed by the parties in the tentative product plan. In February, it increased by 40%, the third month increased by 25%, and the fourth month increased by 10%. The above-mentioned increased processing fee is borne by Party B.
After the expiration of the trial production training, according to the actual specifications of the different specifications and production, the product plan and processing price initially agreed by the two parties shall be referred to. The two parties shall separately negotiate the processing fee and agree once in the next six months. The adjustment range is limited to no more than 10%.
Three payment methods
1. The price of steel, pipes and trucks required for the installation of equipment, spare parts and expansion plants is: cmt Shantou 609.92 billion yen. The payment method of the price shall be paid by Party A through the Bank of China Credit Guarantee of Guangzhou Bank, and 60% of the processing fee collected by Party A shall be repaid in arrears until the end of the payment. The bank interest of the above price shall be borne by Party A, and the annual interest rate shall be 7.60%. Interest is calculated on the date of shipment of the last batch of equipment.
2. The payment of processing fee shall be opened by Party B to Party A within 15 days prior to the shipment of the first batch of fishing nets.
3. Processing fee is based on the settlement of the bill of lading.
For the four-transportation and premium, Party B shall bear the freight and insurance premiums for the delivery of raw materials and auxiliary materials to Shantou; Party A shall be responsible for transporting the manufactured goods to Hong Kong or Japan, and the transportation premium shall be borne by Party B. Party A shall be responsible for the insurance premiums for the storage of equipment, raw and auxiliary materials, semi-finished products and finished products during the period of storage.
5 The delivery period is for Party A to produce normally. Party B shall reserve the original and auxiliary materials for two months in Party A, and the raw and auxiliary materials required for normal production shall be subject to the actual acceptance of Party A. In order to make the supply normal, Party A shall notify Party B at the beginning of the second month of the quantity received, used and the stock at the end of the month. In order to enable Party B to conduct its business normally, Party A shall receive the date of the original auxiliary materials provided by Party B. The product will be delivered to Party B on time, by quality and by quantity within one month. If problems occur during the implementation and are resolved through friendly negotiation between the two parties, the contractor shall not retain the completed work under any circumstances.
Six times of product processing and loss rate product loss rate and defective rate should be reduced by both parties. The nylon multifilament is tentatively set at 5%, and the loss rate of nylon monofilament is determined by the two parties after the trial production period.
After the trial production period expires, if Party A suffers from operational errors, and the defective products and losses exceed the reasonable range, Party A shall be responsible for compensation for Party B's losses; if the quality of raw materials is not satisfactory, the loss will be caused by excessive quality. Party B shall bear the original and auxiliary materials required for the test machine to be borne by Party B.
After the seven technical communication equipment arrives at the Shantou factory, Party B shall dispatch engineering and technical personnel to install the machine, adjust the machinery and test machine to start until the machine is in normal operation, and the product is qualified. The expenses of the above-mentioned engineers and technicians in China shall be borne by Party B. Party B shall be responsible for keeping secrets on production and technology.
After Party A and Party B agreed to formally put into production, Party B dispatched technical engineering personnel to the factory to provide guidance on technical, production management and quality inspection. The specific measures will be agreed upon separately. Party B agrees that Party A shall send engineering and technical personnel to Party B for technical exchange when necessary.
VIII Agreement Term This Agreement is valid for ___ years. During the term of the agreement, Party A and Party B will not reach the same or similar agreement with the third party. After the expiration of the agreement, if Party B requests it, it may be extended by ___ years with the consent of both parties. Party B has expressed its willingness to cooperate with Party A for a long time. Party A expressed its appreciation and hoped that Party B will submit a proposal as soon as possible to facilitate further negotiations.
The original of this Agreement, four copies of the Party A and the witnesses, and the Chinese witness shall prevail.
Party A: ______ Party B: ________ China ___ Fishing Net Factory Japan _____ Network Co., Ltd. China Light Industrial Products Import and Export Corporation: _____ Japan _____ Industry Co., Ltd.
recommended article
- Construction project demolition house contract
- Room decoration commission
- Engineering construction supervision commission
- Qingdao Construction Project Construction Contract
- Demonstration text of construction project contract (2)
- Shanghai Housing Sublease Contract Sample
- Demonstration text of commercial housing contract
- Construction Engineering Design Contract (3)
- Construction engineering technical consulting contract
- Shanghai housing rental (commercial housing pre-leasing)
- Urban residential area owner management committee charter
- Shanghai Participatory Housing Agreement
popular articles
- Tao Xingzhi's famous sayings
- Teacher's famous saying
- Construction engineering survey contract
- Injured sentence
- Classical life motto
- Construction project demolition house contract (official model
- College entrance examination inspirational quotes
- Ministry of Construction, State Administration for Industry and Commerce
- Construction project entrusted supervision contract (Chinese and English)
- Deaf people jingle 2019
- 2014 is very touching words
- Korean swear words
- Real estate mortgage loan contract
- Qq space mood phrase
- Team construction contract (construction team)
- Du Yuexi's famous sayings
- Describe the fast time sentence 2019
- Sad love sentence 2019
- Strong words
- The latest high school inspirational maxim
- English famous words
- Bing Xin’s famous words
- Construction project construction contract (general)
- Thanks to the friend's words 2019
- I want to say something to the teacher.
- Contract conditions for construction of water conservancy and hydropower civil engineering
- Temporary wall construction agreement
- Qingdao Construction Project Construction Contract
- a good saying that loves labor
- Taizai’s famous sayings