Termite prevention contract for housing construction in Chongqing


Contract number: _____________

project name:_____________________

Building unit: _______________

Control unit: _______________

Signing time: ____ year ____ month ____ day

Chongqing Municipal Bureau of Land Resources and Housing Administration

Producer of Chongqing Administration for Industry and Commerce

According to the "Contract Law of the People's Republic of China", "Administrative Measures for the Prevention and Control of Termites in Urban Houses" and the "Administrative Measures for the Management of Termites in Urban Houses in Chongqing", combined with the specific conditions of termite prevention projects, both parties shall conclude this book on the basis of equality and consensus. contract.

I. Project Overview

Wood location of the project location ____ zone ____ street.

Third, the construction date of the contract construction period is from ____________________ to ____________________. Party B shall complete the construction prevention work within the agreed time limit.

Fourth, the quality standard up to db50/5010-1999 "termite construction control technical regulations" requirements.

V. Fees and payment methods

1. According to the type of building houses, the fees are charged according to the charging standards stipulated in the “Management Measures for the Management of White Ants in Chongqing”. Amount: ___佰____ ________________________________________________________________________________________________________________________________________________

2. Payment method: Party A pays in accordance with the following methods: One-time payment; 80% of the above fees are paid after the contract is signed, and the balance of the project is paid after acceptance.

3. If the completed area of ​​the project does not match the billable area of ​​the contract, it shall be calculated according to the completed area.

Sixth, acceptance criteria and methods

1. Standard db50/5010-1999 "Technical Regulations for Construction of Termites";

2. Method: According to the construction technical data signed and approved by both parties, the acceptance inspection is carried out in accordance with the requirements of the Technical Regulations for the Prevention and Control of Termites, and the completion acceptance report is signed. Preventive construction technology program:

Project Overview: including the name of the drug, the original drug concentration, the original drug amount, the application concentration, the application rate, and the application method.

Technical measures: including land cleaning, foundation treatment, wood component treatment, other treatment

Construction requirements: Strict implementation of the drug concentration standard. The spray treatment must be thorough, evenly saturated, and leave no blanks.

VII. Prevention period Termite prevention treatment period is the year, calculated from the date of delivery of the prevention project.

8. Party A's rights and obligations

1. Party B shall have the right to provide termite prevention services during the period of prevention engineering and termite prevention;

2. When the contract is signed, Party B shall provide Party B with the general layout plan, basic plan and front elevation of the project;

3. After the foundation trench is dug, the front and bottom foundations of the pouring ground are backfilled, and before the concrete is poured, the retaining wall works are notified to Party B five days before the backfilling and the wood components to be treated, and a written notice is issued. If you do not notify on time, the responsibility lies with Party A;

4. The termite prevention construction is completed. Under the organization of Party A, Party A and Party B jointly completed the project acceptance work, and jointly signed the “Acceptance Report for Urban House Termite Prevention Project”;

5. Provide necessary on-site construction coordination for Party B to prevent the construction process;

6. The work record of Party B's on-site prevention construction and return visit review shall be signed and approved by Party A.

9. Party B's rights and obligations

1. Enjoy the right to receive remuneration for services as agreed by both parties;

2. Work with Party A to determine the specific construction plan and complete the construction task within the agreed time period;

3. After the signing of the contract, professional and technical personnel shall be assigned immediately to the construction site for investigation, and the construction unit shall be instructed to strictly carry out the cleaning of the building construction land in accordance with the requirements of db50/5010-1999 "Technical Regulations for the Prevention and Control of Termites";

4. After the termite prevention construction is completed, Party A will work together with Party A to complete the prevention project acceptance work, and jointly sign the “Urban Housing Termite Prevention Project Acceptance Report”. After the completion of the inspection, the relevant materials and the “Urban Housing Prevention Project Acceptance Survey will be completed. The report is submitted to Party A;

5. Calculated from the date of completion acceptance, review every three years.

X. Liability for breach of contract

1. Within the term of termite prevention and treatment, if ant damage occurs within the scope of project prevention, Party B shall provide preventive services without compensation and bear the liquidated damages of the total amount of the contract.

2. In the course of the execution of this contract, either party shall breach the contract, and the defaulting party shall pay the other party a penalty of ____% of the total amount of the prevention service fee, and if it causes losses to the other party, it shall be liable for compensation.

XI. Ways to resolve disputes In the course of performance of this contract, if there is a dispute, the two parties will resolve the dispute through negotiation and the negotiation will not be completed, and the following ____ methods will be resolved.

1. Submitted to the Arbitration Commission for arbitration;

2. Prosecuted to the people's court according to law.

Twelve, contract effectiveness

1. The legal representative of both parties shall sign the official seal of the two parties;

2. This contract is in quadruplicate, and both parties are responsible for each.

13. Both Party A and Party B may hold this contract to the Termite Control Committee for the record in accordance with relevant regulations.

XIV. Other matters

1. __________________________________________

2. __________________________________________

Party A: __________

Legal representative: ____________

Manager: ________________

phone:__________________

Zip code: __________________

Bank of account: ________________

address:__________________

account number:__________________

Party B: __________

Legal representative: ____________

Manager: ________________

phone:__________________

Zip code: __________________

Bank of account: ________________

address:__________________

account number:__________________

Termite Special Committee Record __________

Manager: ________________

principal:________________

_______year month day