Installation engineering cooperation contract
This Agreement is entered into by the following parties:
Party A: ________________
Party B: ________________
According to the "Contract Law of the People's Republic of China" and other relevant regulations, combined with the specific conditions of cooperation between the two companies, the preliminary terms of cooperation are as follows:
1. Contract mark
Party B shall implement and complete Party A's regulations and requirements, and cooperate with Party A to complete the projects in China within the scope of business scope.
2. Total contract price _________ $
This contract price is a one-time package pricing, including content:
2.1? Preparations before the installation of the plant equipment, consultation, agency contact, pre-purchase, auxiliary drawing work.
2.2? Machined parts required for equipment, hardware distribution, labor supplies and a range of auxiliary materials.
2.3? Manpower assistance and tool assistance required in the project.
2.4? The arrangements for the food and drink of the staff dispatched by Party A do not include services outside Suzhou.
2.5? Maintenance engineering after installation equipment engineering: paint, cleaning the site, no high-tech inspection cooperation, tool storage, etc.
3. Contract period
3.1 Party B must cooperate unconditionally to meet the construction schedule requirements of Party A and Party A's client units.
3.2 Party B shall provide the services to Party A on time, and the losses caused by the overdue shall be borne by Party B.
3.3.1 Work to be prepared in the previous period Party A shall notify Party B 20 days before the start of the project.
3.3.2 Procurement Delivery Service Party B shall give a reply within 12 hours after express request, and the tasks that can be carried out shall be.
3.3.3 Party B shall complete the auxiliary drawing work in time, and Party A shall guarantee the timeliness of providing complete information and contact.
3.3 According to the situation on the ground, the paint project and the auxiliary inspection work can not be completed in one time, and Party A and Party B will solve the problem together after deliberation.
4. Quality assurance
Party B shall ensure that the processed parts, accessories, hardware, etc. supplied by the company shall be completely new. At the request of Party A, it shall provide a certificate of conformity of the quality of the reverberation or the type of material. If there is special equipment with instructions, Party B shall provide instructions in advance. Party A shall Party B shall not be liable for any consequences caused by violation of the normal use.
5. Technical Information
Party A shall provide technical information and business information. Party B shall prepare the materials, pictures and drawings that are consistent with the requirements, and send them to Party A on time. If Party A believes that the information is incomplete or lost, Party B shall, after receiving the clear request from Party A. It must be provided again for free.
6. manager
6.1 Party A's representative is ________
6.2 Party A ________ is responsible for quality supervision and acceptance
6.3 Party B is responsible for the management of the project as _______
6.4 Party A and Party B management personnel:
6.4.1 The instructions, notices and changes of Party A's representatives shall be submitted to Party B's representative in writing after signing by _________. Party B's representative shall take effect after signing the name and date on the return receipt. Party A's representative shall provide Party B with timely information. The required instructions and approvals, if Party B fails to perform, shall bear the visible losses caused to Party A.
6.5.1 Party B's request, request and notice shall be signed and signed by Party B's representative to Party A's representative in writing. Party A's name will be effective after signing the name and date on the receipt, and Party A shall bear the expenses incurred due to the wrong execution of the order. And the damage caused to itself.
6.6 Party A's responsibility:
6.6.1 Party A shall organize Party B technical personnel, procurement personnel, etc. to inspect the site and provide oral safety counseling.
6.6.2 Request, direct, supervise and indicate technical problems in advance.
6.6.3 Coordinate the procedures of Party B personnel and ________.
6.6.4 Respect and trust Party B, Party B shall not be responsible for the private operation of Party A in China.
6.7 Party B's responsibilities:
6.7.1 Party B shall report the relevant actual situation of the Company to Party A within 7 days before the commencement of the project.
6.7.2 Party B shall provide hardware, mechanical parts, manpower and ensure quality according to the scope of the project as stipulated in the contract.
6.7.3 A clear quotation is required for additional purchased items and the responsibilities are strictly adhered to in accordance with the terms of the written file.
6.7.4 The commercial information of Party A shall be kept unconditionally confidential, and no more than Party A may undertake various types of business from Party A's customers.
7. Subcontracting and subcontracting
If Party B is outside the scope of business license, the qualifications are not up to standard, and the funds are temporarily unavailable, the business may not be transferred to other units without the approval of Party A.
8. Payment method and claim
Payment: After the formal contract takes effect, Party A will receive the electronic and written quotation from Party B:
8.1 If the total price of the quotation is within $____________, Party A shall pay Party B once a month.
8.2 If the total price of the quotation is within $_______-_______, Party A shall pay the deposit within _______% of the total price of Party B, and pay the balance within 15 days after acceptance.
8.3 The total price of the quotation shall be within $_______-_______, Party A shall prepay the advance payment within _______% of the total price of Party B, and the balance shall be settled before the end of the project.
8.4 If the total price of the quotation is above $_______, a separate project contract shall be formulated after negotiation.
8.5 If it is not immediately acceptable at the time, after paying the above deposit, _______% of the balance may be temporarily deducted as a guarantee. If the acceptance is passed before the end of the project, Party A shall pay all the balances of Party B, and there shall be any objection at the time of acceptance. , can be written and then processed.
Claim: Party B shall be responsible for the non-conformity of the contract, and Party A shall file a claim within the validity period of the project. Party B shall resolve the claim in accordance with one or more of the following methods agreed by Party A.
8.6 Party B agrees that Party A has reason to refuse the goods and terminate the work of a project. Party B shall bear all the losses and expenses incurred, including storage, handling charges, freight charges, and other additional expenses.
8.7 According to the poor quality of the goods and the degree of damage to Party A, the price reduction of the goods shall be carried out with the consent of both parties.
8.8 Replace and correct the defective goods, correct the construction errors caused by the technical defects of Party B, in order to meet the requirements of the formal contract, and Party B shall bear all costs and risks.
8.9 Party B delays Party A's work period, and if there is a clear proof, Party B shall bear _____% of Party A's compensation.
8.10 If Party B fails to operate on time according to the time specified in the formal contract, Party A shall pay Party A the liquidated damages: 1%/day of the price of the quotation. If there is no change within 20 days, Party A has the right to default on Party B. The contract is terminated, and Party B is still obliged to pay the various liquidated damages and compensations mentioned above.
9. Contract file
The officially signed contract file consists of the following files:
9.1 This Agreement
9.2 Official contract
9.3 Quotation for each project
9.4 Relevant forms required for performance of the contract: list of management personnel of each department of Party A and Party B, Party's service item list, delivery list, manpower attendance form, consultation format, acceptance form, payment form, receipt form, prepayment request form , claim, contract termination
9.5 Letters before and after the official contract signing
This letter of intent also needs to be negotiated, revised, supplemented by both parties, and the signature and seal will take effect after the formal contract is re-established. The original is in duplicate, each party holds one copy, ___ share, Party A ___ share, Party B ___ share.
Party A (seal): ______________ Party B (seal): ______________
A method is to sign the representative: _______ B method to sign the representative: _______
Date: _____________________ Date: ________________________
recommended article
- Construction Engineering Design Contract (3)
- Construction engineering technical consulting contract
- Shanghai Participatory Housing Agreement
- Urban residential area owner management committee charter
- Engineering construction supervision commission
- Room decoration commission
- Qingdao Construction Project Construction Contract
- Demonstration text of construction project contract (2)
- Demonstration text of commercial housing contract
- Construction project demolition house contract
- Shanghai housing rental (commercial housing pre-leasing)
- Shanghai Housing Sublease Contract Sample
popular articles
- Describe the fast time sentence 2019
- Teacher's famous saying
- Sad love sentence 2019
- Taizai’s famous sayings
- The latest high school inspirational maxim
- Qq space mood phrase
- Real estate mortgage loan contract
- Temporary wall construction agreement
- 2014 is very touching words
- Construction engineering survey contract
- College entrance examination inspirational quotes
- Contract conditions for construction of water conservancy and hydropower civil engineering
- Construction project demolition house contract (official model
- English famous words
- Injured sentence
- Bing Xin’s famous words
- Construction project construction contract (general)
- Construction project entrusted supervision contract (Chinese and English)
- Team construction contract (construction team)
- Strong words
- Deaf people jingle 2019
- Tao Xingzhi's famous sayings
- Korean swear words
- Thanks to the friend's words 2019
- a good saying that loves labor
- Du Yuexi's famous sayings
- Qingdao Construction Project Construction Contract
- I want to say something to the teacher.
- Ministry of Construction, State Administration for Industry and Commerce
- Classical life motto