Fan Wen Daquan > Contract Model > Construction Engineering Contract Model

Construction project contract (model)


Construction project contract

Party A: Full name)

Party B:

In accordance with the "Contract Law of the People's Republic of China" and other relevant laws and regulations, in order to ensure the high quality of the project and the completion of the project, both parties will reach an agreement on the construction of the project through voluntary and equal consultations in accordance with the principle of good faith, and Party B has paid sufficient attention to it. Understand the terms of the various terms and conditions of this contract and voluntarily perform all the obligations arising therefrom.

1. Project Overview

1.1 Project Name:

1.2 Project location:

2. Contract scope

2.1 Main contract content

The specific construction drawings shall prevail.

2.2 Main construction procedures

,

,

,

And everything else that I have done to complete this contract.

2.3 Main engineering quantities

Serial number

project

unit

Quantity

Remarks

2.4 Contract duration

2.4.1 Date of commencement, date of completion, date of completion. The node control period is shown in the following table:

Node duration requirement

Serial number

project name

Date of completion

Remarks

Serial number

project name

Date of completion

Remarks

2.4.2 Delay in construction period

If the node duration of the critical line is delayed due to one of the following situations, after the confirmation by Party A, the construction period is postponed:

a. Major design changes;

b. Force majeure;

c. Due to the owner's reasons, it is required to stop working;

d. Party A agrees in writing to the other circumstances in which the construction period is postponed.

2.4.3 Party B shall report to the Party A in writing within 7 days after the occurrence of the delay in the construction period, and the Party shall submit a report to the Owner in time for the relevant matters. If Party B fails to submit or submits it late, it shall be deemed that Party B waives the right to extend the construction period and compensation. If Party B submits the above written report as agreed, but if the owner disagrees or does not fully agree, Party B shall accept Party A's disagreement or disapproval of the handling opinion.

2.4.4 Due to the delay of the construction period due to Party B, the construction period will not be postponed, and Party B shall bear all economic losses and labor costs incurred as a result.

2.4.5 When the owner and Party A need to complete the construction period in advance, the relevant matters shall be resolved by mutual agreement.

3. Contracting method

According to the construction content and main construction procedures of this contract, Party B agrees to contract according to the method. This contract is not adjusted during the execution of the contract, regardless of whether the quantity of the project changes or not.

If the price of other raw materials such as fuel costs rises due to the issuance of new laws and regulations by the state after the signing of the contract, and the main contract has relevant compensation clauses, the two parties can negotiate and adjust the unit price of the affected items during the execution of the contract. Or the total price; otherwise the contract price will not be adjusted. Due to the increase in the price of other raw materials such as fuel costs that are not affected by the above reasons, the unit price or total price of the contract may not be adjusted.

4, the contract price

4.1 Total contract price

Total contract price: uppercase yuan, lowercase: , fixed total price / tentative total price.

4.2 Contract unit price

The unit price of the contract can be found in the attached file B "Engineering Volume Pricing List". The unit price of the contract includes labor, material and machinery costs for the completion of the construction project, including transportation of various materials required for construction and labor costs; including personnel and machinery entry and exit fees, safe and civilized construction fees, comprehensive management fees, and reasonable profits. All expenses such as % tax, etc. may occur; including construction stagnation costs due to factors such as climate season and process coordination; Party B shall fully consider the risks of construction of the project, and the risk costs are included in the unit price of the contract, and Party A will no longer bear The cost due to any risk.

4.3 Taxation commitment

Party B shall bear the business tax, urban maintenance and construction tax and education surcharge, and the tax shall be paid by Party A. Party A shall be liable for withholding and paying, and shall be deducted from Party B’s monthly progress payment. Other taxes and fees are included in the contract price and are paid by Party B.

5. Rights and obligations of both parties

5.1 Party A's rights and obligations

5.1.1 Party A is responsible for the planning, organization and coordination of the overall project schedule during the construction period, as well as the management, supervision and inspection of the project quality, schedule, safety, environmental protection and civilized construction.

5.1.2 Party A is responsible for providing construction drawings, relevant construction files, and providing construction sites.

5.1.3 Party A is responsible for organizing the technical, quality, safety and environmental protection of the relevant construction drawings.

5.1.4 Party A is responsible for organizing on-site dispatch meetings and coordinating on-site construction.

5.1.5 Party A is responsible for all kinds of work contacts with the owner, supervision engineer and design unit.

5.1.6 Party A shall be responsible for issuing a written notice of commencement to Party B, and shall submit to Party B the overall progress plan of the contracted project, the monthly project progress plan and the weekly progress plan.

5.1.7 Party A has the right to send professional and technical personnel to guide and supervise Party B.

5.1.8 Party A shall, at any time, issue an order to Party B regarding the relevant work within the scope of the contracted project, and Party B shall execute all the instructions issued by Party A in accordance with this contract and Party A's project management rules and regulations. Party B refuses to execute the order, Party A has the right to take corresponding measures or directly entrust other construction units to complete the order, and the expenses incurred shall be borne by Party B, and Party B shall agree to deduct the amount from the project settlement.

5.1.9 Party A is responsible for paying the project payment in accordance with the contract.

5.1.10 Party A shall be responsible for reviewing and calculating the amount of work completed by Party B, and paying the project payment according to the availability of the owner's funds.

5.1.11 Party A has the right to request Party B to remove management and construction personnel who are not qualified for their duties.

5.1.12 Party A has the right to inspect and supervise Party B's engineering quality grade, concealed works and intermediate acceptance, maintenance, initial inspection, inspection and rework, and final inspection.

5.1.13 Party A has the right to supervise and inspect the potential safety hazards in Party B's construction work surface and urge Party B to take corrective measures.

5.1.14 The parties agree on other powers and obligations of Party A:

5.2 Party B's rights and obligations

5.2.1 Within the day after the signing of this contract, Party B shall organize personnel to accept the technical, quality, safety and environmental protection of Party A.

5.2.2 Party B is responsible for organizing personnel to study and familiar with the construction drawings, in accordance with the general layout requirements of the construction, and to do all kinds of construction preparation work.

5.2.3 Party B shall be responsible for submitting the completed monthly work volume statistical report to Party A on a monthly basis as required.

5.2.4 Party B must organize the construction according to the progress plan requested by Party A, and accept Party A's inspection, supervision and management of the progress of the project. When the actual progress of the project does not meet the requirements of the project schedule, Party B shall submit the corrective measures and plans to Party A, and shall be executed after approval by Party A; however, the delay of the construction period due to Party B and all losses borne by Party B shall not be exempted.

5.2.5 Party B must obey the construction schedule of Party A and the instructions of the owner or supervising engineer forwarded by Party A and the contracted project. Without the permission of Party A, Party B shall not directly write to the owner or supervising engineer, and may not directly collect the project payment from the owner.

5.2.6 Party B must abide by the laws and regulations concerning safety production and environmental protection of the State and local governments and relevant regulations and systems of Party A. Party B must strictly manage quality, occupational health and safety, environmental protection, etc., and provide relevant witness information in a timely manner. Record, responsible for the employees and their personal and property losses due to their fault.

5.2.7 Party B shall strictly follow the relevant regulations of the State for the certification of employment, and ensure that its personnel are certified to work as required. Technical posts and special types of workers shall hold qualification certificates for passing the unified examination or assessment by the state or relevant departments. When signing this contract, the personnel holding the certificate and a copy of the relevant documents shall be submitted to Party A for the record.

5.2.8 In order to ensure the performance of the contract, Party B must arrange the personnel to enter the venue according to the requirements of Article 14.1 of this contract before the date of the year; and report to Party A in writing to facilitate Party A to organize on-site inspection.

5.2.9 In order to ensure the performance of the contract, Party B must arrange the equipment for entry in accordance with Article 14.2 of this contract before the date of the year, and ensure that the access rate of the incoming equipment reaches more than %. Within the day after the equipment enters the market and within the day before the departure, Party B shall submit the equipment to Party A in writing, so that Party A can organize on-site inspection and acceptance.

5.2.10 Party B shall complete the construction according to the main contract between Party A and the owner, the relevant standards and specifications prescribed by the State and the drawings provided by Party A to ensure that the quality, schedule and safety of the project meet the contract requirements; The management regulations shall meet the requirements of Party A before the handover, and bear the losses and fines caused by their own reasons.

5.2.11 Party B shall be responsible for the safety work of the nursing, security and unfinished works at the construction site, and hand over the project to Party A on time. If damage occurs during the protection period, Party B shall repair it at its own expense.

5.2.12 Party B shall guarantee the defects of the contracted project during the warranty period. If Party B fails to repair within the time notified by Party A, Party A has the right to separately designate the third party to repair. All expenses incurred by Party A shall be directly deducted from Party B's warranty, and the insufficient portion shall be paid by Party B separately.

recommended article

popular articles