Fan Wen Daquan > Contract Model > Construction Engineering Contract Model

House building engineering quality warranty


Contractor: ___________________________________________________________________ Contractor: ____________________________________________________________________ The contractor and the contractor signed the ________________________________________________ according to the "Building Law of the People's Republic of China", "Regulations on the Quality Management of Construction Projects" and "Quality Assurance Measures for Building Construction Projects" by consensus The engineering quality warranty is fixed.

I. Project Quality Warranty Scope and Content The contractor shall bear the responsibility for the quality warranty of the project in accordance with the relevant laws, regulations and rules and the agreement between the parties during the quality warranty period.

The scope of quality warranty includes foundation engineering, main structural engineering, roof waterproofing, toilets with waterproof requirements, leakage prevention for rooms and exterior walls, heating and cooling systems, electrical pipelines, water supply and drainage pipelines, equipment installation and renovation works. And other items agreed by both parties. The content of the specific warranty, the two parties agreed as follows: _________________________________________________________________________. Second, the quality warranty period according to the "Construction Engineering Quality Management Regulations" and related regulations, the quality warranty period of the project is as follows:

1. Foundation-based engineering and main structural engineering are the reasonable years of use of the project as specified in the design file;

2. The roof waterproofing project, the waterproofing requirements of the toilet, the room and the exterior wall are ______________ years;

3. The renovation project is ____________ years;

4. Electrical pipelines, water supply and drainage pipelines, and equipment installation works are ________________ years;

5. The heating and cooling system is __________________ heating period and cooling period;

6. The supporting works for water supply and drainage facilities and roads in residential quarters are ________________ years;

7. The warranty period of other items is as follows:

_____________________________________________________________________________. The quality warranty period is calculated from the date of acceptance of the project completion.

Third, the quality warranty responsibility 1. Subject to the scope of the warranty, the content, the contractor should send a warranty within 7 days from the date of receipt of the warranty notice. If the contractor does not pay the warranty within the agreed time limit, the contractor may entrust others to repair it.

2. In the event of an emergency repair accident, the contractor shall arrive at the scene of the accident immediately after receiving the notice of the accident.

3. For quality problems involving structural safety, it shall immediately report to the local construction administrative department in accordance with the provisions of the “Building Construction Quality Warranty Measures” and take safety precautions; the original design unit or the design unit with the corresponding qualification level shall submit the warranty. The plan, the contractor implements the warranty.

4. After the quality warranty is completed, the contractor will organize the acceptance.

Fourth, the warranty fee Warranty costs are borne by the responsible party responsible for the quality defect.

5. Other engineering quality warranty items agreed by the other parties: __________________________________________________________________________. The quality warranty of the project shall be signed by both the contractor and the contractor of the construction contract before the completion acceptance, as the auxiliary file of the construction contract, and the validity period will expire until the warranty expires.

Contractor: Contractor:

Legal representative: Legal representative:

Year, month, day, month, day

recommended article

popular articles