Construction project contract agreement
Party A: _______
Party B: _______
In accordance with the principles of the "Contract Law of the People's Republic of China", in conjunction with the specific circumstances of the project, the two sides reached the following agreement.
The first project overview
1.1 Project Name:
construction place:
Engineering Content:
Contracting scope:
1.2 Start date:
Completion date:
Total calendar date:
1.3 quality level:
1.4 Contract price:
The second contract file and the order of interpretation.
Article 3 The language, standards and applicable laws used in the contract file.
3.1 Contract Language:
3.2 Applicable laws and regulations:
3.3 Applicable standards and specifications:
The fourth drawing.
4.1 Drawing date provided:
4.2 Drawings provide sets:
4.3 Drawing special confidentiality requirements and fees:
Article 5 Party A's representative at the construction site.
5.1 List of Party A Resident Representatives and Delegates:
5.2 The name of the chief engineer who exercises social supervision and the scope of his authorization:
Article 6 Party B's representative at the construction site.
Article 7 Party A's work.
7.1 The construction site has the requirements for start-up conditions and completion time:
7.2 Time, place and supply requirements for construction pipelines such as water, electricity and telecommunications entering the construction site:
7.3 Opening hours and starting and ending locations of main traffic trunks and their public roads in the construction site:
7.4 Engineering geology and underground pipe network line information provided:
7.5 Handling documents, the name of the approval document and the completion time:
7.6 Level and coordinate control point location provision and inspection requirements:
7.7 The time for reviewing the drawings and design:
7.8 Protection requirements for buildings and underground pipelines around the construction site:
Article 8 Party B's work
8.1 Construction drawing and supporting design name, completion time and requirements:
8.2 Provide the name, time and number of copies of the plan, report:
8.3 Requirements for construction protection work:
8.4 Requirements for providing office and living facilities to Party A representatives:
8.5 Requirements for traffic and noise at the construction site:
8.6 Requirements for finished product protection:
8.7 Protection requirements for buildings and underground pipelines around the construction site:
8.8 Requirements for the hygiene of the construction site:
Article 9 Progress Plan
9.1 Party B provides the time for construction organization design and progress plan:
9.2 The time approved by Party A's representative:
Article 10 is postponed.
Article 11 Suspension of construction.
Article 12 Delay in construction period.
Article 13 The construction period is advanced.
Article 14 Inspection and rework.
Article 15 Project quality level.
15.1 Economic Expenditure Requirements for Engineering Quality Level:
15.2 Quality Assessment Arbitration Department Name:
Article 16 Concealed works, intermediate acceptance.
16.1 Intermediate acceptance site and time:
Article 17 Test drive.
Article 18 Acceptance and re-inspection.
Article 19 The contract price and adjustment.
19.1 Conditions for adjustment:
19.2 Ways of adjustment:
Article 20 Project advance payment.
20.1 Total amount of prepaid work:
20.2 Prepaid time and ratio:
20.3 Deduction time and ratio:
20.4 Party A shall not be liable for breach of contract on time:
Article 21 The verification of the quantity of the project shall be confirmed.
21.1 Time and requirements for Party B to submit the engineering quantity report:
Article 22 Payment of construction funds.
22.1 Payment method of project payment:
22.2 Payment amount and time of project payment:
22.3 Party A's liability for breach of contract:
Article 23 Party A supplies materials and equipment.
23.1 Party A's requirements for materials and equipment:
Article 24 Party B purchases materials and equipment.
Article 25 Design Changes
Article 26 determines the price of the change.
Article 27 Completion acceptance.
27.1 When Party B submits the completion data and acceptance report:
27.2 Time and number of copies submitted by Party B to the as-built drawings:
Article 28 Completion settlement.
28.1 Settlement method:
28.2 When Party B submits the settlement report:
28.3 When Party A approves the settlement report:
28.4 When Party A sends the notice of the grant to the handling bank:
28.5 Party A's liability for breach of contract:
Article 29 Warranty.
29.1 Warranty content and scope:
29.2 Warranty period:
29.3 Warranty amount and payment method:
29.4 Warranty Interest Rate:
Article 30. Disputes.
30.1 Dispute Resolution Program:
30.2 Dispute Resolution:
Article 31.
31.1 Treatment of default:
31.2 The amount of liquidated damages:
31.3 Calculation method of loss:
31.4 Interest rate of Party A not paying on time:
Article 32. Claims.
Article 33. Safe construction.
Article 34: Patent technology, special techniques and rationalization proposals.
Article 35 Underground obstacles and cultural relics.
Article 36 Engineering subcontracting.
36.1 Subcontracting unit and subcontracted project content:
36.2 Settlement method for subcontracted project price:
Article 37 Force majeure.
37.1 Standards for determining natural disasters that are force majeure:
Article 38 Insurance.
Article 39 The project shall be suspended or slowed down.
Article 40 The contract shall enter into force and terminate.
40.1 Contract entry and termination:
Article 41: Number of shares:
41.1 Copies of the contract:
41.2 Responsibilities for the distribution of the contract:
41.3 Contract Book Development Fee:
Contract conclusion time: ____ years __ month __ day
Contractor: Contractor:
Address: ________ Address: _______
Legal representative: _____ Legal representative: _______
Attorney: _____ Attorney: _______
Phone: ________ Phone: __________
Fax: ________ Fax: __________
Bank of deposit: ______ Bank of deposit: ________
Account number: ________ Account number: __________
Postal code: ______ Postal code: ________
recommended article
- Urban residential area owner management committee charter
- Construction engineering technical consulting contract
- Shanghai Housing Sublease Contract Sample
- Demonstration text of commercial housing contract
- Construction project demolition house contract
- Engineering construction supervision commission
- Construction Engineering Design Contract (3)
- Shanghai Participatory Housing Agreement
- Shanghai housing rental (commercial housing pre-leasing)
- Room decoration commission
- Qingdao Construction Project Construction Contract
- Demonstration text of construction project contract (2)
popular articles
- Temporary wall construction agreement
- Bing Xin’s famous words
- Construction project construction contract (general)
- Construction project entrusted supervision contract (Chinese and English)
- Deaf people jingle 2019
- Sad love sentence 2019
- Qq space mood phrase
- Ministry of Construction, State Administration for Industry and Commerce
- Teacher's famous saying
- Strong words
- Construction engineering survey contract
- Du Yuexi's famous sayings
- Qingdao Construction Project Construction Contract
- Contract conditions for construction of water conservancy and hydropower civil engineering
- Injured sentence
- College entrance examination inspirational quotes
- Team construction contract (construction team)
- Classical life motto
- Real estate mortgage loan contract
- English famous words
- Korean swear words
- I want to say something to the teacher.
- Construction project demolition house contract (official model
- a good saying that loves labor
- Tao Xingzhi's famous sayings
- Describe the fast time sentence 2019
- The latest high school inspirational maxim
- Taizai’s famous sayings
- Thanks to the friend's words 2019
- 2014 is very touching words