Chongqing residential decoration project contract (Chongqing Building Decoration Association trial version)
Employer: ________________
Attorney: ______________
unit:__________________________________
Address: _________________________________
contact number:______________________________
Contractor:________________
company name:______________________________
Bank of deposit: ______________________________
Business License No:____________________________
Bank account:______________________________
Attorney: ______________
contact number:______________________________
The designer of this project: __________________________
contact number:______________________________
Construction manager: ____________________________
contact number:______________________________
Signing time:______________________________
According to the "Contract Law of the People's Republic of China" and other relevant laws and regulations, combined with the characteristics of the decoration and decoration of the city's residence, Party A and Party B agree on the basis of equality and voluntariness, and regarding the contracting and decoration project of Party B's contractor. Matters, the following agreement was reached:
The first project overview
1.1 Project location:
1.2 The contracting method of the project, the two parties agreed to adopt the following _____ type of contracting method.
Party B shall contract and cover all materials;
Party B shall contract labor and pack some materials, and Party A shall provide some materials;
Party B shall provide labor and Party A shall provide all materials.
1.3 Project Duration _____ days
Start date _____ year _____ month _____ day
Completion date _____ year _____ month _____ day
1.4 Contract price: The construction cost of this contract is _____ yuan. Amount of capital:_____.
Second engineering design
See Chongqing residential decoration design contract
Article 3 Party A's work
3.1·Delegate _____ as the representative of Party A, responsible for the performance of the contract and contact with Party B, supervise and inspect the quality and progress of the project, handle all kinds of application approvals, project acceptance, change registration procedures and other matters involved in the construction. All other members of Party A's opinions on the project must be contacted by Party A and Party B;
3.2 Before _____ days before the commencement of construction, Party B shall provide Party B with the construction drawings or instructions to be confirmed by the property management department, and submit the on-site disclosure to Party B to create conditions for Party B's admission. Including: moving out indoor furniture, furnishings, or stacking and covering furniture that is difficult to move indoors, so as not to affect construction;
3.3 Responsible for providing water and power for Party B;
3.4 Responsible for coordinating the relationship between the decoration company and the neighbors; assisting Party B to do on-site security, fire protection, garbage disposal, etc., and bear the corresponding expenses.
3.5 If the original building or equipment pipeline is required, it is responsible for going through the approval procedures for the relevant departments to handle the reverberation and bear the relevant expenses;
3.6 During the construction period, Party A still needs to use part of the living room, and is responsible for the security and fire protection work at the construction site.
Article 4 Party B's work
4.1 Appointment _____ is the representative of Party A, responsible for the performance of the contract, organizes the construction as required, completes the construction tasks on time and in good quality and quantity, and resolves all matters that Party B is responsible for.
4.2 Strictly implement construction regulations, safe operating procedures, fire prevention, safety and environmental protection regulations. Do a good job in construction site management, and the construction site should be equipped with dry powder fire extinguishers.
4.3 Protect the furniture and furnishings in the original living room, ensure the smooth flow of the upper and lower water pipes in the living room, and deal with the disturbances caused by the construction and the relationship with the surrounding units.
4.4 Ensure the cleaning of the construction site and do the construction site security and garbage disposal.
4.5 Before the completion of the project, Party A shall be responsible for the protection of all facilities and finished products on site.
Article 5 Engineering Changes
If the project and practices need to be changed, the two parties shall agree by consensus. Party A and Party B shall sign a written change order, pay for the increase and decrease of the project, and then adjust the relevant expenses and construction period. Party A shall be responsible for all the consequences caused by Party A's private agreement with Party B's workers to change the construction contents; Party A shall compensate Party B for any losses.
Article 6 Material Supply
6.1 According to the contract, the materials and equipment provided by Party A shall be qualified products that meet the design requirements, and shall be supplied to the site on time. The two parties shall jointly accept and handle the handover procedures; the materials and equipment supplied by Party A shall be of quality. The loss of the problem shall be borne by Party A.
6.2 According to the contract, the materials and equipment provided by Party B shall be jointly accepted by both parties; if there is any difference in quality requirements or specifications, it shall be prohibited. If it has been used, Party B shall be responsible for the losses caused to the project.
Article 7 Construction period
7.1 The extension of the construction period due to the following reasons shall be postponed by Party A and the construction period shall be postponed accordingly:
Engineering quantity change or design change;
force majeure;
Party A agrees with other circumstances in which the construction period is postponed.
7.2 If Party A requests to complete the work earlier than the contractual contract, Party B shall obtain the consent of Party B, pay Party B's work-off fee and sign the change agreement.
7.3 If Party A fails to complete the work for which it is responsible according to the contract and affects the construction period, the construction period will be postponed. Since Party A did not pay the project price on time, the contract period was postponed accordingly.
7.4 If the responsibility of Party B cannot be started on schedule or if the work period is affected without interruption, the construction period will not be postponed; if there is any problem with the quality of the project due to Party B, the rework fee will be borne by Party B and the construction period will not be postponed.
Article 8 Quality Standards
The construction quality of this project shall be implemented in accordance with the following _____ standards;
The construction drawings, the contents of the design changes and the "Chongqing City Residential Decoration Engineering Quality Acceptance Standards"
The two sides agreed:___ ___ ___ ___ ___ .
1 During the construction process, both parties have disputes over the quality of the project. The application is certified by the _____ department for the quality of the project. The cost of the certification is based on the principle of “who proposes to pay”. Upon certification, if the quality of the project does not meet the contractual standards, the cost of the certification shall be borne by the responsible party; if the quality of the project complies with the contractual standards, the cost of the certification shall be borne by Party A.
2 Wood and stone are natural items, allowing natural color difference and texture. Party B is obliged to remind Party A.
Article IX Project acceptance, project price settlement and warranty
9.1 Both Party A and Party B shall promptly handle the inspection and acceptance procedures for concealed works and intermediate works. Party A shall not participate in concealed works and intermediate works on time, and Party B may accept the goods on its own, and Party A shall acknowledge it. If Party A requests re-inspection, Party B shall go through the re-inspection as required. If the re-inspection is qualified, Party A shall bear the cost of re-inspection. If the work is stopped, the construction period shall be postponed. If the re-inspection is unqualified, the re-inspection fee shall be borne by Party B, but The construction period should be postponed.
9.2 Both parties agree to divide the project quality into the following stages during the construction process.
________________________________________________
________________________________________________
________________________________________________
Party B shall notify Party A to participate in the acceptance two days in advance, and shall complete the project acceptance form after passing the stage acceptance;
9.3 After the completion of the project, Party B shall notify Party A of the acceptance. Party A shall organize the acceptance and acceptance within three days after receiving the acceptance notice, and shall go through the formalities of acceptance and handover. If Party A fails to organize the acceptance within the specified time, Party B shall be notified in time to determine the date of acceptance, but Party A shall acknowledge the date of completion and bear the costs of Party B's care and related expenses.
9.4 After the project is completed and accepted, Party B shall submit the project settlement statement and relevant materials to Party A. Party A shall complete the review within three days after receiving the above information, and shall not submit an objection after the expiration, and shall be deemed to agree and conclude within three days. Clear tail.
9.5 The warranty period for this project is one year from the date of signing by both parties. After accepting the qualified signature and clearing the final payment, fill in the project warranty.
9.6 If the acceptance is unqualified, Party B shall be responsible for rework, and Party A shall not use it, otherwise the use of the house shall be deemed qualified.
9.7 Party B shall not be responsible for the warranty for the quality of the project due to Party A's purchase of materials that do not meet the national standards.
9.8 Party A is not responsible for the warranty due to Party A's failure to settle the project price.
Article 10 Safety Production and Fire Prevention
10.1 The construction drawings or practices provided by Party A or Party B shall comply with the Fire Control Regulations of the People's Republic of China and relevant fire protection design codes, including the smooth and qualified electrical circuits, pipelines, tap water and other line pipes.
10.2 During the construction period, Party B shall strictly abide by the “Safety Technical Specifications for Construction and Installation Workers” and the “Safety Practices for Construction and Installation Workers” and pay attention to construction safety.
10.3 Party A shall bear all economic losses arising from the occurrence of fire accidents caused by violation of relevant safety operation regulations, fire regulations and fire protection design specifications due to the drawings or practices provided by Party A.
10.4 Party B shall bear all economic losses arising from Party B's violation of relevant safety operation regulations and fire regulations during construction and production, resulting in safety or fire accidents.
Article 11 Payment method of engineering price
1. After the contract takes effect, Party A will direct Party B to pay the construction cost according to the agreement in the list:
Payment time payment time payment amount _________% of the total amount
First contract signing _________%
The second living room, restaurant ceiling, kitchen wall tiles, water pipes, conduits, wiring completed. _________%
The third carpentry and mason were all completed _________%
The fourth time the two sides passed the acceptance within five days _________%
2. Other ways: ____________________________________________________________
Article 12 Liability for breach of contract
12.1 Any party to the contract of the A contract shall be liable by the responsible party for failing to perform the contractual agreement or in violation of national laws and regulations, and being liable for a fine or for the loss of the other party.
12.2 If, for one reason, the contract cannot continue to be performed, the other party shall be notified in time to handle the contract termination agreement, and the responsible party shall compensate the other party for the economic losses caused thereby.
12.3 After the contract comes into effect, Party A and Party B shall strictly perform the provisions stipulated in the contract, and may not change or cancel the contract without authorization. Otherwise, the defaulting party will pay 10% of the penalty for the other party's project price and bear the economic losses caused thereby.
Party A’s responsibility
1. Without any formalities, Party B has the right to refuse to renovate the original building structure and equipment pipelines. Party A forcibly requests Party B to renovate the original building structure and equipment pipelines. Party A shall be responsible for and bear the losses caused by the losses or accidents.
2. Failure to provide raw materials, equipment, sites, funds, technical materials and other reasons caused by Party A in accordance with the time and requirements stipulated in the contract, in addition to the extension of the construction period, shall also pay the actual losses caused by Party B resulting in work stoppages and lost work. Party A shall pay Party B ____________ yuan for each day of work or lost work.
3. The project has not been accepted by the project, and Party A has used it in advance, and there is a quality problem. Party A is responsible.
4. Party A did not pay on time or did not pay the contractually agreed amount on time, overdue one day, paid liquidated damages according to _____% of the unpaid amount or paid liquidated damages to Party B _____ yuan.
Party B’s responsibility
1. The equipment provided by Party A and the furniture, furnishings and other items piled up on site shall be properly protected. In case of damage, compensation shall be made according to the price.
2. Without the consent of Party A, Party B shall arbitrarily reconstruct the original building structure and equipment pipelines, and Party B shall be responsible for and bear the losses caused by the losses or accidents.
3. Due to the reasons of Party B, the quality of the project does not meet the agreed quality standards, and Party B is responsible for rework, and the construction period cannot be postponed.
4. Due to the delay of the construction period due to Party B, the company will pay a penalty of _____ yuan per day.
Article 13 Dispute Resolution
When the dispute between the two parties is resolved, the following _____ methods shall be resolved:
1. Apply to the __________ Arbitration Commission for arbitration.
2. Prosecuted in the __________ People's Court.
Article 14 Several specific provisions
14.1 The garbage generated by the project shall be transported by the Party B to the construction site and shall be immediately transported to the designated ___________ location. Party A shall be responsible for paying the garbage clearance fee by _____ yuan.
14.2 During the construction period, Party A shall hand over the key to the door _____ to the representative of Party B _____ for custody. After the project is completed and accepted, Party A is responsible for providing the new lock _____, and Party B is responsible for the installation and delivery.
14.3 Party B shall construct according to the contractual agreement and specifications. If Party A has special requirements, Party B shall notify Party B in writing before the construction, and Party B shall not handle it afterwards.
Article 15 Supplementary Provisions
15.1 This contract shall become effective after being signed and sealed by the representatives of Party A and Party B.
15.2 The project may not be subcontracted after the signing of this contract.
15.3 If Party A and Party B sign the contract directly, the contract shall be in duplicate, and each party shall hold one copy.
Contract attached file
Schedule I
Schedule 2
Schedule 3
Schedule IV
Schedule 5
Schedule 6
Schedule 7
Schedule VIII
Article 16 Other agreed terms __________________________________
representative of A:________________
Party B representative: ________________
recommended article
- Demonstration text of commercial housing contract
- Shanghai Housing Sublease Contract Sample
- Engineering construction supervision commission
- Urban residential area owner management committee charter
- Room decoration commission
- Shanghai housing rental (commercial housing pre-leasing)
- Construction engineering technical consulting contract
- Construction Engineering Design Contract (3)
- Construction project demolition house contract
- Demonstration text of construction project contract (2)
- Shanghai Participatory Housing Agreement
- Qingdao Construction Project Construction Contract
popular articles
- Thanks to the friend's words 2019
- I want to say something to the teacher.
- Construction project construction contract (general)
- Ministry of Construction, State Administration for Industry and Commerce
- Qingdao Construction Project Construction Contract
- a good saying that loves labor
- Bing Xin’s famous words
- English famous words
- Construction project demolition house contract (official model
- The latest high school inspirational maxim
- Deaf people jingle 2019
- Construction engineering survey contract
- Real estate mortgage loan contract
- Temporary wall construction agreement
- Describe the fast time sentence 2019
- College entrance examination inspirational quotes
- Taizai’s famous sayings
- Contract conditions for construction of water conservancy and hydropower civil engineering
- Korean swear words
- 2014 is very touching words
- Teacher's famous saying
- Tao Xingzhi's famous sayings
- Classical life motto
- Injured sentence
- Strong words
- Qq space mood phrase
- Team construction contract (construction team)
- Du Yuexi's famous sayings
- Sad love sentence 2019
- Construction project entrusted supervision contract (Chinese and English)