Construction and installation engineering survey contract model


[Legal Education Network]

Construction unit:

Contract number:

project name:

construction place:

Confidentiality:

20________ years _____ month ______ day order

Construction and installation engineering survey contract

Enter into the contract:

Construction unit: ___________________, hereinafter referred to as Party A;

Survey unit: _____________________ Survey Institute, hereinafter referred to as Party B.

In order to clarify the economic responsibilities of the construction unit and the survey unit, work together, promote each other, and quickly and cost-effectively complete the survey tasks of the national construction project. According to the construction project project that has been formally approved, the contract is concluded through full consultation between the two parties. So that both parties can abide by.

I. Project location and construction nature

_____________________________________________________________________________________________.

Second, Party A’s obligations

1. When signing the contract, Party A must submit a copy of the plan assignment document approved by the infrastructure program to Party B, and submit a copy of the land approval file and red line drawing for the engineering geological survey.

2. When signing the contract, Party A must submit to Party B a topographic map and a layout plan of the survey scope proposed by the design unit and approved by the construction unit, and submit the survey technical requirements entrusted by the construction unit and completed by the design unit. The figure.

3. Party A must do the water and electricity supply for site survey work, level the road, clean the site, and prepare materials before _______ _______ days.

4. Party A must complete the compensation procedures for land acquisition, demolition, tree cutting, and mining of young crops before entering the site on the _______________________________________________________________________________________________________________________________________________________

5. Party A must be responsible for resolving the conditions of food, accommodation, office and other conditions of Party B's prospectors. Party B's food and shelter expenses shall be borne by Party B. If Party A arranges to live in a guest house or restaurant, the expenses shall be borne by Party A. The collective welfare facilities of Party A’s personnel shall provide convenience for Party B’s personnel. The migrant workers, fuel materials and equipment for heating in winter and coal and wood are required to be supplied by Party A; the maintenance of the production site and the maintenance of the equipment are handled by Party A and bear the expenses.

6. The transportation expenses and labor costs of Party B's surveyors and surveying equipment entering the project site shall be borne by Party A.

Third, Party B’s obligations

Party B shall enter the site survey on the _______ month _______ day of _____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ Engineering geological report type __________ copies. If Party B affects the on-site construction for more than three days due to climate or Party A, the construction period can be postponed.

4. Deposit and survey fees and methods of payment

1. The survey fee is charged according to the “Measures for Engineering Survey Fees” issued by the State Construction Committee. The total price is estimated to be ________________ yuan. Within ____________________ days after the commencement of this survey contract, Party A shall pay Party B a deposit equivalent to 30% of the survey fee; after the commencement of the survey work, Party A shall pay Party B 30% of the survey fee; after the completion of all survey projects, Party B shall submit the investigation report and drawings to Party A according to the contract, and carry out the project settlement. Within ________________ days after Party A takes the information, the investigation fee shall be paid according to the actual survey workload. The payment of survey expenses shall be handled by the Construction Bank for collection and commitment.

2. For the special project charging method, in principle, 20-40% of the survey fee will be charged according to the survey engineering total technology.

V. Party A’s liability for breach of contract

1. If Party A changes the plan, or the information provided is inaccurate, or fails to provide the necessary information or working conditions for survey and design, and causes rework, design, work, or modification of design, Party A shall The actual amount of work consumed by Party B shall be increased, and the construction period shall be postponed; due to the responsibility of Party A, significant rework or redesign of the design shall be made, and additional construction fees shall be made, and the construction period shall be postponed.

2. If Party A delivers the survey fee or deposit beyond the time specified in the contract, Party B shall pay Party B the liquidated damages in accordance with the bank's delay in payment.

6. Party B’s liability for breach of contract

1. If Party B reworks or causes engineering losses due to poor quality of survey, it shall continue to improve the survey and bear economic and technical responsibilities according to the losses caused. Party A may reduce the amount of damage caused by the damage, and reduce or not pay the survey and design fees. If Party B causes major quality accidents in the project due to investigation errors, in addition to exempting the survey and design fees from the lost part, it shall also pay compensation equal to the part of the survey and design fee directly affected by the loss.

2. Since Party B's liability delays the provision of information for a period of ________________ days or more, each time a delay is made, Party A shall pay Party A a penalty equal to the total price of the engineering survey fee _________________.

Seven, the handling of disputes

In the event of a dispute arising from the execution of this contract, both parties shall promptly resolve the dispute. If the two parties belong to the same department when the negotiation fails, the mediation by the superior competent department; if the mediation fails or does not belong to the same department, it may apply to the contract management authority prescribed by the state for mediation or arbitration, or directly to the people's court.

Eight, other

_________________________________________________________________________________________.

This contract shall become effective after the signature of both parties on the date of _____________________________________________________________________________________________________________________________________________________________________________ If there are any outstanding matters in this contract, it is necessary to make a supplementary agreement through mutual consultation. The Supplementary Agreement is equally valid as this Agreement.

The original of this contract is in duplicate, each party holds a copy; the copy of the contract is __________ copies, and is sent to the Planning Commission, the Construction Committee, and the CCB.

Construction unit_________________________

Representative: ___________________

Contact: _____________________

Communications Service:____________________

Telephone or telegram: _____________________________

Bank of deposit: _____________________

account number:_______________________

Survey unit: ______________

Representative: _______________________

Contact: ____________________

Communications Service:__________________

Telephone or telegram: ____________________________________

Bank of deposit: ______________________________

account number:________________________

20________ years ______ month ______ day order

Attached:

1. Measurement tasks and quality requirements tables;

2. Engineering geological tasks and quality requirements.

Schedule 1:

Measurement tasks and quality requirements

Engineering name Engineering location Design unit Work content Workload and technical requirements Remarks

Schedule 2:

Engineering geological tasks and quality requirements

Project Location: Design Unit: Design Manager: Survey Stage: Building Name or Structure Type Layer and Total Height Foundation Masonry Depth and Elevation Foundation Type Total Load Unit Area I, Topographic Map 2 of the Site, General Plane Layout.
Third, the fine survey technology requirements 4, there are survey data near the site