Architectural engineering contract
Enter into the contract:
Construction unit: _____, hereinafter referred to as Party A;
Design unit: _____, hereinafter referred to as Party B;
After full negotiation between Party A and Party B, this contract is signed in order to comply with it.
The first project name, scale, investment amount, construction site Party A entrusts Party B to undertake the design project of ____ project, the construction and installation area is _____ square meters, the approved total investment is ___10,000 yuan, and the construction site is at _ ___. Second Party A's Obligations 1. Party A shall submit to Party B the design task book, project site selection report, and raw materials, fuel, water, etc. approved by the superior before _________ Agreements on electricity, transportation, etc., and survey data that meet the preliminary design requirements, and technical materials that need to be obtained through scientific research. Party A shall provide approved preliminary design files and survey data that meet the design requirements of the construction drawings, construction conditions, and technical information about the equipment before the construction drawing of the ______________.
Party A is responsible for the accuracy of the above information.
2. Promptly handle the design file approval work at each design stage.
3. Before the commencement of the project, Party A shall organize the relevant construction unit, and Party B shall carry out the design and technical disclosure; after the completion of the project, Party A shall notify Party B to participate in the completion acceptance.
4. When the designer enters the construction site for work, Party A shall provide the necessary working conditions and facilitate it in life. During the design and construction process, the trial production test shall be carried out due to technical special needs. Party A shall be responsible for the travel expenses of Party A to the field.
5. Party A must maintain Party B's design files and may not modify them without authorization. Party A shall not copy, reuse or expand the scope of construction without the consent of Party B.
6. Party A has a confidentiality obligation to Party B's design results and may not transfer it to a third party for reuse without permission.
Article 3 Obligations of Party B 1. Party B shall deliver the preliminary design file to Party A before the ________ date, and deliver the technical design to Party A before ______ Archives; before the ____ __ date, the construction drawing design file is delivered to Party A. Among them, the preliminary design file is a ___ share, the technical design file is a ___ share, the construction drawing design file is a ___ share, and the other party needs to add the number of files to the model fee, and the fee is charged separately. Before ___year__month__ day, Party B must submit all design files to Party A.
.
2. Party B must submit the survey technical requirements and design according to the approved design task book or the approval file of the previous stage design, as well as the design technical economic agreement file, design standards, technical specifications, procedures, quotas, etc., and submit the quality-compliant design. file.
3. After the preliminary design has been reviewed by the higher authorities, Party B shall be responsible for the necessary modifications within the scope of the original mission statement.
4. The design unit shall cooperate with the construction project to undertake the design task, carry out the technical pre-construction technical disclosure, solve the relevant design problems in the construction, be responsible for design change and revision budget, participate in concealed project acceptance and project completion acceptance.
Article 4 Modification and cessation of design 1. Party A shall request the modification of the design of the project. With the consent of Party B, Party A shall, in addition to the delivery time of the design file, be revised according to the actual rework date of Party B, and press _ per working day. __ yuan increase in design fee, or calculated as the percentage of work rework in the design phase.
2. If the original task book is reworked or modified if there is a major change, it must have a submission from the design approval authority or the design task approval authority. The payment of the design cost that has already been carried out is calculated according to the preceding article.
recommended article
- Network service agent contract
- Water supply contract
- Decoration project contract
- Supporting inheritance agreement
- Dynamic shopping system usage agreement
- Office furniture order contract
- Foreign equity transfer agreement
- Construction land contract model
- Training institution cooperation agreement
- Personal partnership contract (model document)
- Television purchase and sale agreement
- Water conservancy project construction supervision contract
popular articles
- Power of attorney (trademark agency)
- Qq space mood phrase
- Describe the fast time sentence 2019
- Taizai’s famous sayings
- Strong words
- a good saying that loves labor
- Brand authorization agreement
- The latest high school inspirational maxim
- Brand Authorization Agreement Template
- I want to say something to the teacher.
- Thanks to the friend's words 2019
- Warehousing contract
- Bing Xin’s famous words
- Sales Tripartite Agreement Template
- Medical device registration agency contract
- College entrance examination inspirational quotes
- E-commerce company business joining contract template
- Non-exclusive agency sales agreement
- Sad love sentence 2019
- English famous words
- Deaf people jingle 2019
- Korean swear words
- Exhibition cooperation agreement
- Tao Xingzhi's famous sayings
- Hotel room reservation agreement
- Classical life motto
- Teacher's famous saying
- Injured sentence
- 2014 is very touching words
- Du Yuexi's famous sayings