Railing Substation 2012 Spring Safety Production Self-examination Report
Self-inspection report of the safety production of the railing substation in spring 2004
Transformer area:
In order to conscientiously implement the spirit of the "Notice of the State Electric Power Corporation to carry out the Spring Safety Production Inspection" and complete the work objectives of the 2004 safety production work, the Baling Ping Substation decided to organize a spring safety production in the station from March 1, 2004. Self-examination activities, in the self-examination process, mainly have the following problems:
First, the data:
On-site records are not standardized.
The data is not organized.
The drawings, materials and account management of the maintenance and security control devices are not complete.
Second, the equipment:
The locking device is incomplete.
No. 1 main change has a slight oil leakage.
There is no anti-small animal measure in the high pressure room.
The outdoor cable casing is not blocked.
Outdoor cable trench cover does not meet the requirements.
Emergency accident lighting has no light bulbs.
Various warning signs are not fully set.
The DC system in the station is not on the background.
The busbar main circuit wire joint is hot.
1# Busbar T-shaped clamp is severely corroded.
A discharge phenomenon occurs in the T-shaped clamp.
Third, the greening of the station in the civil construction needs to be gradually improved.
The above-mentioned spring safety inspectors inspected various problems in the inspection of the Baling Substation, and looked at the work area in time.
Report on this
Railing Substation March 5, 2004
Transformer area:
In order to conscientiously implement the spirit of the "Notice of the State Electric Power Corporation to carry out the Spring Safety Production Inspection" and complete the work objectives of the 2004 safety production work, the Baling Ping Substation decided to organize a spring safety production in the station from March 1, 2004. Self-examination activities, in the self-examination process, mainly have the following problems:
First, the data:
On-site records are not standardized.
The data is not organized.
The drawings, materials and account management of the maintenance and security control devices are not complete.
Second, the equipment:
The locking device is incomplete.
No. 1 main change has a slight oil leakage.
There is no anti-small animal measure in the high pressure room.
The outdoor cable casing is not blocked.
Outdoor cable trench cover does not meet the requirements.
Emergency accident lighting has no light bulbs.
Various warning signs are not fully set.
The DC system in the station is not on the background.
The busbar main circuit wire joint is hot.
1# Busbar T-shaped clamp is severely corroded.
A discharge phenomenon occurs in the T-shaped clamp.
Third, the greening of the station in the civil construction needs to be gradually improved.
The above-mentioned spring safety inspectors inspected various problems in the inspection of the Baling Substation, and looked at the work area in time.
Report on this
Railing Substation March 5, 2004
recommended article
- Create a self-check report of “Green School” in Yiwu City
- Preventing juvenile crimes in Chongqing in 2019
- Zhuhai Qizhong Modern Educational Technology Experimental School
- Dalian No. 39 Middle School “Double Gaopu Jiu”
- Ma'anshan No. 1 Middle School Moral Education Self-examination Report
- Self-examination report of Yuntai Middle School Democratic Management School
- Ningbo Trade Promotion Association certificate production certification self-examination report
- Self-examination report of trade union work in 2019
- Self-examination report of undergraduate teaching work of the Environmental College
- Linyi No. 1 Middle School, Hunan Province, China
- Self-inspection report on student safety work in Akamatsu School
- Moral education self-examination report
popular articles
- 2019 on the implementation of school routine management activities
- Ji Yulin's famous sayings
- Thank the teacher for the words
- School goal management of Sandu Center National Primary School in 2019
- Consolation of a bad mood
- Admit mistakes
- Joe Gillard's famous saying
- The Effectiveness Construction of the Bureau of Education Bureau of Ganyu County in 2019
- Hyun dance family impression sentence
- Poems
- Time maxim
- Written to the son 2019
- Sentences depicting autumn scenery
- Praise the sentence of the motherland
- Singing the famous sayings of the motherland
- Sad sentence 2019
- 2012-2013 municipal civilized school created self-examination
- Dujiangyan Forestry Bureau on 2019 work
- Have to say
- Describe the sentence of sweet-scented osmanthus
- ×The Judicial Bureau’s 2019 annual confidential work self-check report
- Franklin's famous words
- Non-mainstream aesthetic sentimental sentence
- Self-examination report of trade union work in 2019
- Love and happiness sentence 2019
- The sentence at the time of completion
- Learning aphorism
- County 2019 annual administrative law enforcement responsibility system
- Self-checking report on social comprehensive management work in 2019
- Self-examination report on poverty alleviation and development work in 2019