Civil construction constructor year-end summary


Since joining the work, I have complied with the rules and regulations of the company and the project department, actively obeyed the work arrangements of the leaders, successfully completed the tasks, maintained the collective honor, and ideologically demanded progress, actively responded to the company's call, and conscientiously implemented the company's files and The spirit of the meeting. Work hard, work hard, earnestly study relevant experimental knowledge, and constantly improve and improve themselves.
Looking back on the work of the past year, XX is both a busy and fulfilling year. The knowledge learned in school textbooks is theoretical knowledge. Now, the practical experience accumulated in the work is my life. Enjoy endless treasures. During the year, there were difficulties and gains. As a result of earnest work, personal duties were fulfilled and their abilities were strengthened. A brief summary of the work of the year is as follows:
I. Politics and Thoughts I have a strong sense of ownership, always pay attention to the development of the electric construction company, and think about the interests of the electric construction company, the project department and the laboratory, and firmly believe that the electric construction company will continue to develop and grow. It is full of enthusiasm and expectation for the future of the company. Although I have not yet joined the Chinese Communist Party, I will strictly demand myself from the standards of party members, consciously accept the supervision and help of party members and colleagues, and persistently overcome their own shortcomings, make up for their own shortcomings, and strive for a long time in the future. In the years, I can stand the test and join the great Communist Party of China at an early date.
I started with my job and my daily work. I started from now, started from now, started from small things around me, and persisted in my work. I worked tirelessly to make achievements. I must constantly improve my position. Efforts to be proficient in the job knowledge of the job, to be the backbone of the job and the hands of the family, to do the job in a down-to-earth manner.
Second, work attitude No matter in work or life, I have always believed in a hard work, a harvest, so I have been working hard, constantly study hard, and constantly work hard. I love my own job and can take every job correctly, work hard, work on time, use my working hours effectively, and stick to my position. The construction period is tight, the number of personnel is small, the tasks are numerous, and it is possible to follow the shifts, ensure that the inspection tasks are completed on time, ensure the smooth inspection of the project, show that our testers have strong sense of responsibility, and carry forward the continuous work and hard work of our testers.
Third, the job responsibilities conscientiously implement the national standards, quality management system, product quality supervision and inspection and research and development of the principles and policies; indeed implement the relevant standards, test methods and related regulations of the engineering products responsible for supervision and testing of this post, do each There are laws to follow. Do a good job of accepting orders, project inspections, materials, feedback, etc., and do a good job of tracking accounts for future reference. Due to the large number of test and inspection projects, the project inspection time is different, and the work will be done in advance to avoid the technical personnel of the construction unit not understanding the engineering inspection requirements and technical indicators, delaying the construction period and affecting the progress. Our laboratory staff adhere to the four basic principles, implement the quality policy, implement the quality objectives, abide by the rules and regulations, and serve the construction site wholeheartedly.
IV. Specific Work The work I have been engaged in mainly tests and inspects some engineering civil engineering materials and finished products; participates in the concrete mix ratio test; conducts supervision and control on the concrete mixing in the mixing station; controls the on-site concrete and backfill Work, etc.
When I first joined the work, I first came into contact with the backfilling inspection. Although the backfilling is single and boring, most people think that it is not a little bit of soil. What do you do well, but I have been working for a while, but it is not so simple: Starting from the material requirements of the soil, the soil compaction is determined, its control index; what parts need backfilling, what parts need to be backfilled with sand or gravel or 3:7 gray soil should have technical indicators control; the selection of backfilling equipment; before backfilling Is the condition available? Whether the strength of the underground concrete foundation meets the specified requirements, the material selection of the soil, the compactness requirement, the virtual paving thickness and the compaction coefficient have been determined, and the backfilling compaction does not meet the requirements, which will cause collapse, sinking, and even bring greater Hazard. Therefore, it is not so easy to lay down what has been done in my mind before the other materials that I gradually came into contact with, and I can't be vague.
In the laboratory, we contacted more project inspections, clarified the work program, and formed a clear working idea in the specific work, able to carry out the work smoothly, and skillfully completed the job.
Control of a pair of raw materials: For each raw material entering the site, each batch shall be issued with the manufacturer's quality assurance certificate and inspection certificate. Each batch of raw materials shall be inspected according to the specified quantity. 1 For cement, when using bulk cement silos, cements of different manufacturers, different varieties and different grades are strictly prohibited to be mixed. When using bagged cement, measures should be taken to prevent moisture from agglomerating. For the use of cement stored for more than three months, the laboratory should be contacted in advance to conduct a second review of the actual label of the cement. 2 Sand and gravel shall not contain any foreign matter or coal dust. In particular, it is not possible to mix white ash. When the raw materials are found to be inconsistent or abnormal with the sample, they should be contacted with the laboratory and disposed of in time. In order not to affect the construction progress, all raw materials entering the plant must be commissioned in time. The cement test is carried out with 3d strength and 28d strength. Steel, sand and stone are issued within 24 hours after being commissioned by the laboratory. All materials to be inspected must be tested by the laboratory before they can be used. The principle of first inspection and later use, otherwise it is regarded as a non-conforming product. It is forbidden to use in engineering.
2. Control of backfill: Before the construction of backfill, the construction department should fill in the backfilling order truthfully, and the design drawings are required to be constructed according to the drawings. Not required to comply with national regulations. The soil moisture content of the backfill construction is the best. The thickness of the soil of each layer of the backfill shall be layered and compacted according to the specifications, and shall not be leaked and checked by layer. After passing the test, the next step can be carried out, otherwise the construction unit will carry out rework.
Three 1砼 project. For cockroaches and large volume cockroaches with special requirements, they should be commissioned in advance, and should be opened after opening. 2 When mixing the mixing station every time, the mixing ratio should be strictly implemented, the slumping degree and workability should be controlled, and the mixing and production control records should be done well. If the water content changes greatly, the laboratory should be notified in time for dynamic adjustment. Environmental pollution should be avoided or reduced when using fly ash. The mixing station will leave the test block, and the test room will carry out the production evaluation of the concrete according to the level, batch and time of the mixing station, so that the production level of the concrete can be controlled.
4. For welders entering the civil works at the construction site, the unit in which they are located must submit a copy of the welder's technical grade certificate and a list to the laboratory before the project starts. Before the project starts, it is necessary to assess the welder's test welding. After the test report is issued, the welder can perform formal operations.
When I first joined the work, I quickly integrated into my work, constantly asking myself and constantly urging myself to improve. As a young worker, I dare not neglect to deal with work. I ask myself to write down the mistakes and problems in my work and learn every problem to learn lessons, encounter problems or encounter difficulties in my work. Ask for advice and leadership, patiently listen to his opinions, suggestions, and improve the work. Because my department is only working in a small circle for most of the time, I can't sit still. I often get in touch with the site from time to time to understand the engineering procedures and steps to better serve the future.
V. Achievements I have learned a lot in my work and exercised myself. After unremitting efforts, the work level has been further improved, and in the first round of the 120-day campaign in the ** project, I was “recruited by the ** project department”, in addition, The other colleagues in the laboratory cooperated and worked together. The civil engineering laboratory of the ** project I was in was “recruited by the collective.”
VI. Summary Although I have achieved some small achievements in the past year, it is still far from the trust and expectations of the company and the superiors. In the future work, I will work harder to continuously improve my professional skills and better fulfill the task of leadership arrangements. Broaden our thinking, deepen and refine our work, and strive to make greater contributions to the powerful iron army of the electric construction company.