Water Resources Bureau 2019 year-end work summary and 2019 work plan


In accordance with the key work requirements determined by the county government work report and the overall requirements of the provincial and municipal water work conferences, our department has comprehensively established and implemented the scientific development concept, and carried out work actively and effectively. Now the work in XX is completed and problems exist. The key work plan for XX is reported as follows:
I. Completion of the main work completion situation
1. According to the plan issued by the city, the drought-resistant and land-retaining project will have a total construction area of ​​243,600 mu in the county in XX, mainly implemented in 4 towns including * town, * town, * town and Chaoyang township. Township. Plan to fight 413 eyes of the new water-resistant wells in the field, use the original well* eye, and support the pump and sprinkler equipment* sets. The project began in mid-April and was completed by the middle and late May, and was completed in full accordance with the plan.
In the construction of drought-resistant and protected fields. Our main practice. The first is to formulate the "implementation" rules; the second is to sign a three-level agreement; the third is to introduce a new drilling policy. That is: the well is drilled 50-70 yuan per meter according to the actual depth of the well.
2. Rural drinking water safety project
In XX, there were 18 tasks for the construction of rural drinking water safety projects in the county, including 15 in XX years and three in XX years. Will solve the problem of drinking water safety for 11,700 people. The total investment of the project is 7 million yuan, of which the state investment is 3.16 million yuan and the local self-raised is 3.84 million yuan. The project has been implemented since the beginning of April, and 14 water source projects have been completed so far, and 3 pipe network constructions have been completed. It is planned to complete the task of drinking water safety engineering by the end of November.
3. Construction of small collection water storage projects
In XX, the construction of the Xinman Reservoir Haiman Slope Protection Project was completed. The project investment is 100,000 yuan. A total of XX cubic meters of earthwork, 100 cubic meters of earth and 27 cubic meters of gravel were completed.
4. The provincial-level small-scale agricultural water project will build a water-saving and efficiency-increasing project area in the township Guozhi Village this year, with an area of ​​700 mu and a total investment of 300,000 yuan, of which 300,000 yuan will be raised by the province and the local government. The project completed 3 new flood-resistant water source wells and matched 3 sets of sprinkler irrigation equipment and water pump. The project was implemented in May and is scheduled to be completed by the end of August.
5. The corn film drip irrigation project plans 133,000 mu, and the actual completion of 133,100 mu. The project began on April 11 and ended on June 30. A total of 641 large systems were built, with a control area of ​​52,900 mu; a small system of 3,981, with a controlled area of ​​80,200 mu.
The measures we have taken in combating drought in drought relief work. First, start the drought-resistant water source project to fight drought; second, increase the drought-resistant water source well.
The county government and the county government attach great importance to the flood control work. According to the requirements of the State Defense General and the provincial and municipal flood control and drought relief headquarters, the county government organized a county flood prevention work conference to comprehensively arrange the annual flood prevention work. The first is to carry out pre-mortem inspections. The county flood control headquarters has carried out a comprehensive inspection of the various responsibility systems, key projects, Yishun villages, and material reserves of all townships and towns in the county, and found problems and hidden dangers within a time limit. The second is to improve various plans and seize the focus of flood prevention work. We will pay close attention to the flood prevention work of the two major canals in the north and west of the Xingshan Mountain Area, the Bayi Reservoir and the Yi Village. The third is to do a good job in the storage of anti-mite materials and funds. The townships and towns in the county have 20,000 wooden poles for rescue, 390,000 woven bags, and 1.1 million yuan for emergency flood control. The flood prevention work has achieved safety due to the attention of the leaders, the preparation, and the lack of big grievances.
Second, the problems that exist in the county's water conservancy work. Mainly due to the slow progress of the project, such as: drinking water safety projects, in accordance with the requirements of the higher level, did not complete on time.
Third, the lower part of the work plan is a reasonable plan and arrangements to complete the XX year work tasks as soon as possible. The second is to take a general view of the overall situation and scientifically produce the work plan for XX years.
4. Projects for municipal-level financial support for agriculture in the proposed project in XX
1. Anti-drought and land-receiving projects. According to the overall requirements of the city's drought relief and land acquisition planning. In XX, the county's drought-resistant and reclamation project, with a planned area of ​​261,500 mu, plans to use 200 holes for electromechanical wells, 672 eyes for original wells, and 872 sets of water pump and sprinkler irrigation equipment. The total investment of the project is about 25 million yuan.
2. Corn film drip irrigation project. In XX, we will deploy according to the arrangements of the municipal party committee and the municipal government, and actively implement the drip irrigation area under the corn film.
Rural Drinking Water Safety Project
1. Rural drinking water safety project. The plan is to solve the safety of 35 natural cockroaches, 5,607 households, and 19,624 people, with a total investment of 16.502 million yuan, including state investment of 7.426 million yuan, provincial investment of 2.805 million yuan, and local self-raised 6.271 million yuan.
2. Rural drinking water safe centralized water supply project. The project focuses on the construction of the second phase of the Fengle Town Water Supply Project. It solved the drinking water safety of 2792 households and 11285 people. The total investment of the project was 8,848,900 yuan, of which 3,791,100 yuan was applied for the national investment, 1,510,800 yuan was invested by the provincial government, 888,700 yuan was invested by the city, and 2.486 million yuan was raised by the local government.
Water saving irrigation project
1. ** Water-saving irrigation project area. It is declared to be a national water-saving irrigation demonstration project area. The construction site is in Dage Town and Fuxing Village of Xingcheng Town. The benefit area is 5,000 mu, the total investment of the project is 2.6 million yuan, the national subsidy fund is 1.3 million yuan, and the local self-raised 1.3 million yuan.
2. *** Water-saving irrigation project area. It is planned to build a water-saving irrigation project area in Fengle Town, with an irrigation area of ​​10,000 mu, 67 wells, 24 wells, 91 sets of water pumps and 91 sets of sprinklers. The total investment of the project area is 8,392,800 yuan, and the provincial investment is 5 million yuan. The county finance and beneficiary farmers raise 3,392,800 yuan.
Small reservoir reinforcement project
* Reservoir reinforcement project. The construction content is earth dam heightening and filling, new flood sluice gate, earth dam sloping slope, total engineering volume is 51,000 m3 of earth and stone, 0.2 million m3 of sputum, estimated project investment of 4.705 million yuan, applying for national investment * 10,000 yuan, provincial investment Gold * million yuan, local self-raised * million yuan.
* Reservoir reinforcement project. The construction content is as follows: the heightening and thickening of the dam, the slope of the brick facing the water, and the asphalt pavement of the dam roof. A new underground ditch, with a main project volume of 29,500 m3, including earthen 22,000 m3, bricks of 0.35 million m3, sandstone of 0.40 million m3, and a total estimated investment of 5 million yuan, including state investment of 2.25 million yuan and provincial financial investment of 225. Ten thousand yuan, the city and county self-raised 500,000 yuan.