Water Affairs Bureau 2012 Work Summary and 2012 Work Plan
Comrades:
Today, the water affairs work conference of the whole district was held here. On this occasion, on behalf of the Party Committee of the Water Affairs Bureau, I would like to pay tribute to the cadres and workers of the waterfront of the whole district and their relatives for their early years, and to extend the congratulations and sincere greetings of the New Year. The main tasks of this meeting are: review and summarize the water work in the whole district in 2005, commend the advanced collectives and advanced individuals emerging in the water work in the past year, and deploy the water work in 2006.
I. Seriously review and summarize the water work in 2005
The year 2005 is a year of comprehensively implementing the spirit of the 16th CPC National Congress and the Third Plenary Session of the 16th CPC Central Committee, deepening reform, expanding opening up, and promoting development. Under the unified leadership of the district committee and district government, the district's water workers have served the purpose of serving, serving the "three rural issues", serving the economic and social development, pioneering and innovating, and working hard to achieve the healthy development of the water industry. .
Actively prepare for flood prevention and ensure fullness
In the flood prevention work in 2005, the district committee, the district government and the district flood control headquarters attached great importance to the flood prevention work, and arranged and arranged the flood prevention work in strict accordance with the flood control plan. The water department earnestly implemented various flood control responsibilities. At the beginning of March, the special class was organized to inspect 24 culverts of the rivers and dikes in the whole district. In accordance with the problems existing in each gate, plans were made to supervise the maintenance and signed with the defensive units. Two-way responsibility; set up a class to find termites, find termites in the main levee trunk line, find 11 nests of termites in 18.2 km of termites, and 11 pairs of ants and queens, reducing the damage of termites to dikes, for flood control Security provides protection; the organization detects the flood control communication equipment in the whole district. From May 1st, the rainfall and water level measurement and reporting points strictly implemented the 24-hour duty system, reporting the water and rain on time; doing a good job in clearing the river channel and removing the waste from the embankment, ensuring the smooth development of flood control work. . In late July last year, the water level of Tongshun River reached 25.65 meters and the warning water level was 0.35 meters. The flood control headquarters of the district started the flood control work. A total of 15 culverts along the line will be equipped with personnel to carry out 24-hour flood control and inspection work. Although the grievances of last year were not great, the high level of attention and active preparation of water workers in the district ensured the safety of our district.
Grasp the dike management and gradually realize the shift of the focus of the dike work
After the 1998 flood, the state invested nearly 400 million yuan in the construction of dikes in our district, which not only improved the ability of the Yangtze River embankment to withstand floods, but also comprehensively improved the comprehensive benefits of the Yangtze River embankment. With the end of the construction of large-scale dikes, we timely shifted the focus of dike work from dike construction to dike management. First, 61,800 protective forest trees were planted in the inner and outer dykes of Yidi and Yilin Beach, so that the amount of dyke protection forests reached 325,000, achieving the goal of “one dyke and two forests” and laying a solid foundation for the 100-kilometer tourist belt in Hannan. basis. The second is to take effective measures, planting and heavier, so that the survival rate of forest trees is above 95%; the third is to combine the construction of dikes, strengthen the key greening of the dike section of the city, and plant a large number of trees that can be seen, turn the lifeline into a landscape, and become a city resident. Recreation provides a beautiful place; the fourth is to take effective measures to improve the embankment. Raise funds of more than 1 million yuan, plasticize the embankment, plant beneficial grass, make the embankment reach the standard of “one degree and three levels”; fifth, take the prevention and control of termites as the key work of flood prevention and preservation. A special class for finding termites was set up. In the whole area, the termites were surveyed. In 18.2 km of termites, a total of 11 nests of termites were found, and 11 pairs of ant kings and queens were killed, effectively preventing the damage of termites to dikes. Strengthen the construction of flood control passages, invest 300,000 yuan, and integrate the Hanhong Line and the Yejing Line into a whole, and initially form a road network for flood control systems. Seventh is to protect the health of the people and eliminate the schistosomiasis. The river channel embankment management section organized the manpower and machinery to eradicate the reeds of the three Bunds in Pazhou, the gauze hats and the Dashu, and deepened and leveled the beaches, completing the earthwork of 20,000 square meters and covering an area of more than 200 square meters. On the premise of doing a good job in the management of the dike, it is to seize the opportunity of dike construction, develop comprehensive operations, and enhance the embankment economy, with a profit of 850,000 yuan for the whole year.
Highlight key points, pay attention to actual results, and improve the service of farmland water conservancy facilities
In response to the problems exposed during the operation of farmland water conservancy facilities in 2004 and the people's urgent desire to develop water conservancy projects, we constantly adjust our work ideas, strive for city-level investment, and improve the ability of farmland water conservancy facilities to resist natural disasters and improve me. The development of farmland water conservancy facilities and agricultural economy as the focus, focus on work effectiveness, and use municipal projects to promote the process of farmland water conservancy construction in the region. First, strive for city-level investment of 550,000, implement the first phase of the Zhoujiahe pumping station to improve the drought resistance of the farmland in the region; second, strive for the city bureau to invest 1 million yuan to complete the transformation of the low gate snail of the Dongchengtun farm flood gate At this point, the whole district has completed the transformation of 8 culverts and snails; the third is to strengthen the supervision and promotion of the pumping station, and comprehensively overhaul the 46 sets of sluice pumping stations in the district to ensure the normal operation of the drainage pumping station in the whole district; Under the strong support of the street towns and towns, pay attention to practical results, engage in sweat investment, dredge the backbone ditches in the region, and complete 700,000 cubic meters of internal farmland water conservancy soil, including 400,000 cubic meters of dredging and 100,000 cubic meters of canal and irrigation. Rice, three trench cleaning 200,000 cubic meters. Restoring the storage capacity of 400,000 cubic meters; restoring and improving the irrigated area of 5 mu, excluding the area of 120,000 mu; and transforming the low-yield field by 0.4 million mu. Through a series of measures, the overall ability of agriculture in the region to resist natural disasters has been greatly improved, providing a strong guarantee for the development of agriculture.
Drainage, water supply, safety, and smooth flow
Water supply and drainage work is one of the important indicators to measure the quality of life of the people, and it is a major event closely related to the lives of the people. To this end, we put safety and service in the first place, pay attention to the daily management and maintenance of drainage facilities, and facilitate the travel of urban residents; pay attention to the monitoring and management of drinking water in the whole district, and improve the quality of drinking water for the people in the district. First, organize manpower and machinery to fully dredge the 64-kilometer drainage network in the urban area to ensure smooth discharge; secondly, strengthen the management of drainage facilities, and 697 inspection wells and 573 gullies on 31 main roads in the city. The management responsibility is to the team and the person; the third is to combine the daily inspection, regular inspection and supervision registration system to form an effective supervision mechanism; the fourth is to formulate the water service 110, the police system, and strictly implement the drainage. The emergency treatment mechanism and accountability system of the well has effectively curbed the occurrence of safety accidents in the well. The fifth is to coordinate the construction of the water supply pipe network and lay a water supply pipe network with a length of 1.9 km and 400 mm to the development zone on schedule to make the smooth operation of the enterprise. The preparatory work in the early stage will create a good investment environment. The seventh is to conduct in-depth investigation and research, and formulate and improve the Rural Water Supply Plan, which has created conditions for rural scale water improvement and comprehensive improvement of drinking water quality.
Increase the propaganda of water regulations, investigate and deal with illegal water activities, and improve the water environment
To raise people's awareness of water laws and regulations is the premise of people-oriented and law-based administration. In order to guide the broad masses of people to abide by water laws, we have always used propaganda water laws as a breakthrough in law-based administration, carried out various forms of water law propaganda, and investigated and publicized water. The violations are organically combined. First, during the “World Water Day” and “China Water Law Propaganda Week”, the district head of the People’s Government of the district issued a TV mobilization speech entitled “Improving the Awareness of Suffering and Realizing Water Management According to Law” on the TV station, and set off the propaganda water regulations in the whole district. The climax; we organize special classes, use propaganda vehicles to patrol the whole district; in the places where the population is relatively concentrated, lay up exhibition boards, issue leaflets; set up water law consultation desks, receive more than 600 consultations; and put important provisions in water regulations Compiled a quiz and a prize-winning event. The second is to manage according to law and administration according to law, and the effect is obvious. Supervise and urge four enterprises in the jurisdiction to install water metering facilities to install water meters; census and register into river sewage outlets; before smashing, remove 165 mu of crops planted on the outer slope of the embankment, and remove 29 electric poles that are indiscriminately planted on the embankment. More than 2,300 meters of wire were confiscated, and more than 400 square meters of shacks and duck sheds were built on the dykes of the embankment. More than 70 tons of materials were stored in the river, and four pieces of "Ecstasy" fishing gear were fully prepared for flood safety. The 24-hour duty system was implemented to strengthen the supervision of the ban on mining in the Yangtze River and effectively prevent illegal sand mining. Fourth, with the strong support of governments at all levels, the nearly 2,000 acres of reeds in the rivers and beaches were eradicated to ensure smooth floods.
Second, make persistent efforts to do all the work in 2006
2006 is a crucial year for implementing the scientific development concept, consolidating the achievements of macroeconomic regulation and control, and maintaining a sound economic and social development. It is also an important year for achieving the goals of the 10th Five-Year Plan and connecting the development of the 11th Five-Year Plan. This year's work will have an important impact on the future reform and development of the water industry. In the new year, the guiding ideology of the water work in the whole district is: under the correct leadership of the district committee and the district government, the requirements for adapting to the development of water affairs in the new period are taken as the starting point and destination of the work, establishing a scientific development concept, and continuously innovating. Deepen reform measures, further create a new situation in water affairs work, and strive to successfully complete the 2006 work goals through the joint efforts of the vast number of cadres and workers, and implement the spirit of the Party’s 16th National Congress, the 16th and 4th Plenary Sessions of the 16th CPC Central Committee, and promote the three Coordinated development of civilized construction. Focus on the following aspects:
Improve agricultural production conditions and enhance resilience. Focus on solving the problem of internal farmland water conservancy exposed in the past, and ensure the smooth completion of the farmland water conservancy construction task this winter and next spring.
1. Municipal investment projects. The first is the water conservancy and snail-killing project. The city-level investment of 3.26 million yuan will carry out the water conservancy and snail control for 36 screw points in the whole district. The second is the city-level investment of 1.2 million yuan for the expansion and reconstruction project of Wuhao Pumping Station.
2. The key projects at the district level, totaling 73,000 cubic meters of earthwork, the construction of the project is organized and implemented by the unit where the project is located, and the government appropriately subsidizes. First, the Jinnangou expansion project, a total of 35,000 cubic meters of earthwork, was completed by the Dongchengyu farm; the second is the 369 ditch expansion project, totaling 23,000 cubic meters of earthwork, completed by the yarn hat street; the third is to complete the 372 ditch expansion The excavation project, a total of 15,000 cubic meters of earthwork, was organized by Dengnan Town.
3. The key projects of the field, street and town were completed by the field, street and town. It is mainly the dredging and excavation of the Dagou Canal in the cross-village group and the maintenance of the irrigation canal, totaling 193,000 cubic meters; the annual inspection and maintenance of seven pumping stations with more than 155 kW in the whole area.
The basic construction of farmland water conservancy this spring and spring has been officially launched on November 15. We will strengthen the overall supervision of the project, taking the construction of municipal key projects as the leader, and driving the construction of farmland water conservancy projects in the whole district on schedule.
Increase the management of dike projects and enhance the development of dikes. First, increase the management of dikes, strive for the investment of 5 million yuan from the higher level, and implement the transformation of the sluice gates for the 8 culverts of the Yangtze River. Second, we will strive to invest 1.4 million yuan to increase the pace of construction of the Dongjing River dangerous section. Increase the construction of dikes, standardize the dike type, and achieve “one degree and three levels” to improve the turf and reduce the amount of weeds.
Strive to start the Ant River comprehensive improvement project, strive for funds, carry out comprehensive dredging of the Ant River, and gradually implement the Ant River comprehensive improvement project.
Water supply and drainage work should have a new improvement. First, speed up the construction of water supply pipe network in the district, gradually transform rural water supply enterprises, improve the quality of water supply, and improve the overall quality of drinking water in the district. The second is to explore new ideas and gradually solve the urban water supply problem to meet the economic and social development requirements of our district. The third is to strengthen the management of the drainage pipe network in the yarn hat area to ensure smooth discharge. The fourth is to expand the new areas of drainage facilities maintenance and participate in community services.
Strengthen water law propaganda, create a good law enforcement environment; strengthen the training of law enforcement team legal knowledge, improve the administrative capacity of law enforcement teams as a whole; broaden the scope of fee collection and achieve the collection target.
Combine the construction of spiritual civilization with the goal of creating civilized units, organize and carry out meaningful activities; further change work style and ideological style, enhance the cohesiveness of party organizations, and further demonstrate the effectiveness of civilized creation work, improve work efficiency, and improve service levels. .
Pioneering and innovating, using the ideas of reform and development to promote the reform of the water system, develop a new type of water development mechanism, and enhance the strong water support for the development of our district.
In the new year, let us, under the leadership of the district committees and district governments, and with the support and cooperation of all relevant departments, fully implement the important thinking of the "three represents," further implement the scientific development concept, and carry forward "dedication, responsibility, "Practical" spirit of the water industry, advance with the times, unite and work together, strengthen confidence, work hard, promote sustainable development of water conservancy, and jointly write a new chapter in the water management cause in the new era, and make new contributions to building a well-off society in an all-round way.
recommended article
- Quzhou City Grain Bureau 2019 work summary and 20
- Government work summary for 2019 and work for 2019
- Summary of the work of the Municipal Price Bureau in the 2019
- Summary of the work of creating provincial-level civilized units in xx town
- Report on the implementation of the responsibility system for party style and clean government construction
- Pinglu Branch's work in the "100-day attack"
- Staged work summary
- Summary of County Agricultural and Rural Work in 2019
- It’s hard to create a good result, and it’s a brilliant show.
- Summary of the work of the secondary school in the first half of 2019
- Summary of personal work of coal mine administrative secretary
- Summary of tax work in 2019
popular articles
- Lanshan District Audit Bureau's total work in the first half of 2019
- Strong words
- Summary of the work of the Institute of Justice in 2019
- Sad love sentence 2019
- Summary of Party Building Work of the Party Branch in 2019
- Classical life motto
- The comprehensive management of social security in towns and towns in 2019
- Summary of government work in 2019 and work in 2019
- Teacher's famous saying
- English famous words
- 2014 is very touching words
- Tao Xingzhi's famous sayings
- I want to say something to the teacher.
- Taizai’s famous sayings
- Du Yuexi's famous sayings
- Thanks to the friend's words 2019
- Bing Xin’s famous words
- Describe the fast time sentence 2019
- Qq space mood phrase
- College entrance examination inspirational quotes
- Deaf people jingle 2019
- Procuratorate's work summary for 2019
- Summary of 2015 government affairs public work
- Summary of xxx company 2019 annual party committee work
- Korean swear words
- Summary of Party Work in ** Village in 2019
- Summary of the work of government affairs in 2019
- a good saying that loves labor
- The latest high school inspirational maxim
- Injured sentence