Construction engineering design contract
Construction unit:____________________________
Address: ____________ Postal Code ____________ Phone____________
Legal representative: ____________ Position ____________
Design unit: ____________________________
Address: ____________ Postal Code ____________ Phone____________
Legal representative: ____________ Position ____________
In order to clarify the responsibilities, work together and work together to complete the design task of the construction project, according to the plan task book approved by ________, the contract is signed by the two parties for full compliance.
First
Party A entrusts Party B to undertake the design project of ____________ project, the construction and installation area is ________ square meters, the total investment approved is ________ million, and the construction site is ________.
Article 2 Party A’s obligations
1. Party A shall submit to Party B the design task book approved by the superior, the site selection report, and the agreement on raw materials, fuel, water, electricity and transportation before ____________________ Archives and survey data that meet the preliminary design requirements and technical data obtained through scientific research. Party A shall provide approved preliminary design files and survey data that meet the design requirements of the construction drawings, construction conditions, and technical information about the equipment before the construction of the construction drawings.
Party A must guarantee the quality of the above information and must not change it at will.
2. Promptly handle the design file approval work at each design stage.
3. Before the commencement of the project, Party A shall organize the relevant construction unit, and Party B shall carry out the design and technical disclosure; after the completion of the project, Party A shall notify Party B to participate in the completion acceptance.
4. When the designer enters the construction site for work, Party A shall provide the necessary working conditions and facilitate it in life. During the design and construction process, the trial production test shall be carried out due to technical special needs. Party A shall be responsible for the travel expenses of Party A to the field.
5. Party A must maintain Party B's design files and may not modify them without authorization. Party A shall not copy, reuse or expand the scope of construction without the consent of Party B. Party A is obliged to protect Party B's design copyright and may not transfer it to a third party for reuse.
Article 3 Obligation of Party B
1. Party B must deliver the preliminary design file to Party A before ____________________________________________________________________________________________________________________________________________________________________________________ The construction drawing design file will be delivered to Party A before the ____________________________ Among them, the preliminary design file is ____ copies, the technical design text is __ copies, and the construction drawing design file is ____ points. If Party A needs to add additional files and models, it will be charged separately.
Before ____________________________, Party B must submit all design files to Party A.
.
2. Party B must submit the survey technical requirements and design according to the approved design task book or the approval file of the previous stage design, as well as the relevant design technology agreement files, design standards, technical specifications, procedures, quotas, etc., and submit the quality-compliant design files. .
3. After the preliminary design has been reviewed by the higher authorities, Party B shall be responsible for the necessary modifications within the scope of the original mission statement.
4. The design unit shall cooperate with the construction project to undertake the design task, carry out the technical pre-construction technical disclosure, solve the relevant design problems in the construction, be responsible for design change and revision budget, participate in concealed project acceptance and project completion acceptance.
Article 4 Modification and suspension of design
1. Party A requires the modification of the design of the project for any reason. With the consent of Party B, Party A shall, in addition to the delivery time of the design file, be revised according to the actual rework date of Party B, and increase the design fee by ________ yuan per working day.
2. If the original task book is reworked or modified if there is a major change, it must have a submission from the design approval authority or the design task approval authority. The payment of the design cost that has already been carried out is calculated according to the preceding article.
3. If Party A requests to stop design in the middle of the reason, Party B shall promptly notify Party B in writing that the designed design fee has not been refunded, and the design fee is increased and paid according to the actual labor day at that stage, and the contractual relationship is terminated.
Article 5 Number of Design Fees and Delivery Method
Within ____ days after the design contract is effective, Party A shall deliver a deposit equivalent to 20% of the design fee to Party B. After the design contract is fulfilled, the deposit shall be used as the design fee; Party B shall submit the preliminary design plan to Party A. Within a day, Party A shall pay Party B a design fee of ____%; Party B shall, within ____ days after Party A submits the construction drawing file, Party A shall settle all design fees to Party B.
Article 6 Reward and Breach of Contract
1. Within the reasonable project investment control number, since Party B uses advanced technology or reasonable advice to save engineering investment, ____% of the investment should be drawn from Party B.
2. Since Party A cannot provide relevant design information on time and accurately, Party B cannot design or cause design rework. In addition to the date of delivery of the design file, Party B shall also be subject to Party B’s actual loss of working days. ________ yuan calculates the incremental design fee.
3. Party A shall not pay the deposit and design fee to Party B in accordance with the time stipulated in the contract, and shall pay Party B the liquidated damages according to the bank's provisions on deferred payment.
4. Due to Party B's reasons, delay in the delivery of the design file, Party B shall pay Party A a penalty of ____% of the design fee for every ____ days of delay.
5. Due to the poor quality of the design of Party B, it is necessary for Party B to continue to improve the design tasks, and to reduce the amount of waste caused by the loss or the design fee. For those who have caused major quality accidents due to design errors of Party B, Party B shall not only pay the design fee for the loss part, but also pay compensation equal to the design fee directly affected by the loss.
Article 7 Other Agreements
_____________________________________________________________
This contract shall become effective after the signature of both parties on ________________________________________________________________________________________________________________________ If there are any unfinished matters in this contract, it is necessary to make additional provisions through mutual consultation. The Supplementary Agreement shall have the same effect as this Agreement, but shall not be inconsistent with the contents of this Agreement.
In the event of a dispute arising from the execution of the contract, both parties shall resolve it in a timely manner. When the negotiation fails, the two parties belong to the same department, and the higher authorities shall mediate; if the mediation fails, they may choose to apply to the arbitration institution for arbitration and directly file a lawsuit with the people's court.
The original of this contract is in duplicate, each party holds one copy; one copy of the contract is ____ copies, and one unit of ____, ____, ____, etc. is kept.
Construction unit:________________________
Representative: ________________________________
____year month day
Design unit: ________________________
Representative: ________________________________
____year month day
recommended article
- Construction engineering technical consulting contract
- Construction project demolition house contract
- Qingdao Construction Project Construction Contract
- Shanghai housing rental (commercial housing pre-leasing)
- Urban residential area owner management committee charter
- Construction Engineering Design Contract (3)
- Shanghai Participatory Housing Agreement
- Demonstration text of commercial housing contract
- Engineering construction supervision commission
- Shanghai Housing Sublease Contract Sample
- Room decoration commission
- Demonstration text of construction project contract (2)
popular articles
- MacArthur's famous sayings
- Ministry of Construction, State Administration for Industry and Commerce
- Common English sentences
- Construction project demolition house contract (official model
- Sad sentence
- 2014 encourages the words of a lost person
- Save your boyfriend's words
- Construction project construction contract (general)
- Lincoln's famous sayings
- Team construction contract (construction team)
- a famous saying that overcomes setbacks
- Construction project entrusted supervision contract (Chinese and English)
- Qingdao Construction Project Construction Contract
- Contract conditions for construction of water conservancy and hydropower civil engineering
- English inspirational maxim
- The latest topic of chatting with girls
- Temporary wall construction agreement
- Putin's famous sayings
- Funny quotes
- Boasting words 2019
- a good sentence for the motherland
- Blessing Dad’s words
- Mandela’s famous words
- Real estate mortgage loan contract
- Trusted quotes
- Philosophical words 2019
- Say goodbye
- Missing childhood sentences
- Dedicated good words
- Construction engineering survey contract