The contractor can replace the materials on behalf of the transfer: ________________________________________________

The place of arrival does not match the list: ______________________________________________________

The quantity supplied does not match the list: ______________________________________________________

The arrival time does not match the list: ______________________________________________________

27.6 Settlement method for the equipment supply equipment of the contractor: ______________________________________________

28. Contractor purchases materials and equipment

28.1 Contractor's agreement to purchase materials and equipment: __________________________________________________

Eight, engineering changes

IX. Completion acceptance and settlement 32, completion acceptance

32.1 Contractor's agreement to provide the as-built drawings: ____________________________________________________

32.6 Scope and completion time of the intermediate construction project: ______________________________________________

X. Defaults, claims and disputes

35, default

35.1 The specific responsibilities of this contract regarding the default of the contractor are as follows:

Article 24 of the General Terms and Conditions of this Agreement stipulates that the contractor shall be liable for breach of contract: ____________________________

Clause 26.4 of the General Terms and Conditions of this Contract stipulates that the contractor shall be liable for breach of contract: __________________________

Article 33.3 of the General Terms and Conditions of this Contract stipulates that the contractor shall be liable for breach of contract: __________________________

Other breach of contract obligations of the contractor agreed by both parties: __________________________________________________

35.2 The specific responsibilities of this contract regarding the contractor’s breach of contract are as follows:

Clause 14.2 of the General Terms of this Agreement stipulates the contractor’s liability for breach of contract: ____________________________

Clause 15.1 of the General Terms of this Agreement stipulates the contractor’s liability for breach of contract: __________________________

Other contractual obligations of the contractor agreed by both parties: __________________________________________________

37. Disputes

37.1 The parties agree that in the event of a dispute arising from the performance of the contract:

Please ___________________________________________________________________ mediation;

The first way is to resolve it, and the Arbitration Commission is invited to bring the case to arbitration or file a lawsuit in the people's court.

XI, other 38, engineering subcontracting

38.1 The contractor of the project agrees to the contractor’s subcontracting project: __________________________________________

The subcontracting construction unit is: ________________________________________________________________

39, force majeure

39.1 Agreement between the two parties on force majeure: ____________________________________________________

40, insurance

40.6 The parties agree that the insurance coverage is as follows:

The insured person's insurance content: ____________________________________________________________

Insurance matters entrusted by the contractor to the contractor: ________________________________________________

The contractor insured the content: ___________________________________________________________

41. Guarantee

41.3 The parties agree on the guarantees as follows: ________________________________________________

The contractor provides the contractor with a performance guarantee. The guarantee is as follows: the guarantee contract is attached to the contract.

The contractor provides the performance bond to the contractor in the form of a guarantee contract as an auxiliary file of the contract.

Other guarantees agreed by both parties: ____________________________________________________

46, the number of contracts

46.1 The number of copies of the contract agreed by the parties: ______________________________________________________

47, supplementary terms

Subsidiary File 1: Contractor Contracting Project List

Subsidiary File 2: List of Equipment for Supply of Contractors

Subsidiary File 3: Engineering Quality Warranty