Work Plan > Logistics Work Plan

2019 logistics work plan


The logistical work of the school this semester will focus on the overall deployment of the school. Under the leadership of the Party branch and the principal's office, we will conscientiously strengthen the management of school production and canteens in accordance with the requirements of China's small logistics general affairs, and purify and beautify the campus environment. Establish a sense of serving the teachers and students wholeheartedly, conscientiously do all kinds of routine work, ensure the normal development of the school's work, and lay a solid foundation for the rapid development of the school.
Specific work arrangements:
September:
1. General Logistics staff meeting.
2. Do a good job in the relocation and resettlement of new offices and classrooms.
3. Add necessary office supplies and items for distribution and collection.
4. Do a good job in the issuance of bed linen and new meal cards for the new semester.
5. Supervise the health and safety work in the canteens and small shops to ensure the normal operation of the canteen.
6, contact Ariston manufacturers, repair the check valve on the shower.
7. Do a good job in bidding and issuance registration for 26 sets of teachers' laptops.
8, custom-made canteen second floor plastic steel door partition and student dormitory south first floor plastic screens.
9. Supervise the new port to do the distribution project, the greening project around the sports ground, the road paving project and the surrounding sanitary cleaning work.
10. Add a desk in the teacher's lounge, a tea cabinet, a work cabinet, an executive chair and a sports warehouse hanging closet.
11. Do a good job in cataloging, arranging, and recruiting new books.
12. Complete the audit and payment of campus cultural corridors, campus cultural signage production, student showrooms and campus sporadic projects.
13. Implement the tendering plan for the campus music square sculpture.
14. Fill in the list of teachers participating in the health check and report to the district trade union.
15. Do a good job in the Teacher's Day activities.
16. In order to welcome the National Day, do a good job in campus environmental sanitation and the three-package greening work in front of the school.
17. Clean the basketball court from September 4th to 5th.
18. Continue to do a good job in routine management and school building.
October:
1. Music Square sculpture construction.
2. Do a good job in the issuance of teachers' laptops.
3. Prepare to create acceptance materials for green schools.
4. Do an average load distribution of the air conditioning power supply of the whole school.
5. Cooperate with the financial office to do a good job in auditing.
6. Strengthen autumn health management, focus on rectification, and do a good job in the canteen and green belt environmental sanitation work

The first model network to organize the article, the copyright belongs to the original author, the original source.


7. Do a good job in the air conditioning and electrical transformation of the second floor of the canteen, the teaching building, and the audit work of sporadic projects.
8. A list of 994,000 yuan in the 2 million special funds of the Culture and Education Bureau and the Finance Bureau
9. Do a good job in quantitative grading acceptance of canteens
10. Prepare the power supply room before powering up
11. Cooperate with the various offices to do all the relevant work of the school.
November:
1. Customized installation of the first floor of the cafeteria and the financial room security window.
2. Cooperate with the Academic Affairs Office to make arrangements for the midterm exam.
3, each classroom posted flag painting and installation and production of the classroom board.
4. The completion and acceptance of the music sculpture.
5, do a solid asset physical account.
6. Cooperate with the financial office to do the audit work.
7. Organization of payment work and information declaration.
8. Cooperate with the Academic Affairs Office to organize teachers to go to Nanjing to buy books and contact the vehicles.
On the afternoon of the 9th and 17th, all the students in the first grade were organized to the CDC for medical examination.
10. A list of 8 million yuan of special funds from the Culture and Education Bureau and the Finance Bureau.
11. Grasp the environmental sanitation work in the canteen and green belt.
12. Continue to prepare for the power distribution room before powering up.
13. Organize all faculty and staff to visit and study in Hangzhou and other places.

December:
1. Install the “three winds” stainless steel characters and audit work of the customized school.
2. Cooperate with the Moral Education Department to do a good job in the campus environment greening in the “Terrain Education Acceptance”.
3. Please fire experts to test and test the fire extinguisher in our school. Some dry powder fire extinguishers need to be changed. Prepare for fire inspection.
4. Customized security door on the fifth floor of the administrative office.
5, student work showroom wall needs to increase the glass partition and custom library tools glass bookcase.
6. Assist in the cataloging and arranging of the library to purchase 4,804 books in Nanjing. And related work on the acceptance of libraries and standardized laboratories.
7. Do a good job in logistics support for the second campus culture and art festival.
8. Continue to do a solid account of fixed assets.
9. Do a good job in creating materials for the General Affairs Office in the provincial model countries.
10. Strengthen the supervision and inspection of food hygiene in canteens and small shops.
11. Do a good job in the routine management of campus environmental sanitation.
12. Replace the pool faucet of the dormitory bathroom.
13. Continue to prepare for the power distribution room before powering up.
14, do the program, chemical laboratory renovation project.
From January to the end of the semester:
1. Complete all audit work and pay for the project.
2. Water saving renovation project for male toilets.
3. Do a good job in the final exam examination room.
4, custom labs, laboratory cabinets, road signs and other sporadic projects.
5. Strengthen electricity management.
6. Organize the work materials of the General Affairs Office for one semester.
7. Do a good job of ending the winter vacation. The cleaners are on duty every day except the first day of the year.
8. Overhaul of the water and electricity facilities in each dormitory and classroom to ensure completeness.
9, urge the canteen food hygiene work.
10. The installation and acceptance of the physical projector wiring of each laboratory.
11. Purchase and purchase of school supplies and hygiene products before the start of school.
12. The acceptance of the distribution room is over, and the temporary transformer room is removed.
13. Completion and audit of chemical laboratory engineering.
14. The General Affairs Office convened a meeting of all staff. The division of work and internal management system are perfect.
15. Add some green plants on campus.
16. Do a good job of matching the ledger with the physical account.
17. Assist the various offices in daily work.
18. The preparatory group will meet and convene a trade union committee meeting.
In short, the General Affairs Office of the school will strive to improve its ability to serve education and teaching, truly work hard, forge ahead, and provide a strong guarantee for the full implementation of our school's nine-year compulsory education.

Suzhou High-tech Zone Experimental Junior High School General Affairs Office
XX.8

recommended article

popular articles