In 2008, under the correct leadership of the county party committee and the county government, and under the strong support of the higher authorities, the Water Affairs Bureau closely focused on the overall situation of the county's economic development, emancipating the mind, transforming the style of work, seeking truth and being pragmatic, working hard and working hard. Functional role. In the aspects of salty and light mixing, dangerous bridge reconstruction, human drinking safety, and promotion of water saving technology, it has achieved relatively obvious results.

I. Completion of several major tasks in 2008

1. Under the great force, we must do a good job in project construction and actively strive for higher-level financial support.

The project is the main driving force for water conservancy construction, and the key to the development of water conservancy construction is the project. Since the beginning of this year, we have seized the favorable opportunity of the state to support the "three rural issues" and vigorously grasped the project running. The bureau set up a leading group running the project with the director as the leader, organized the staff to take separate actions, and used all available factors and relationships to run the city bureau and the provincial department, and actively strive for the support of the superior. After unremitting efforts, we have won the salty and light mixed water saving project, the dangerous bridge reconstruction project, the water saving irrigation demonstration project and the human drinking safety project, etc., and strived for more than 8.7 million yuan in project funds. The implementation of the project has laid a good foundation for the development of the “Eleventh Five-Year” water conservancy project and the construction of new countryside.

2. Vigorously implement the construction of salty mixed mixing and dangerous bridge reconstruction projects to benefit the people of the county

The implementation of the salty mixed mixing and dangerous bridge reconstruction project is two practical things for the county party committee and the county government for the people, and it is also the two key tasks of the county government this year. The salty and light mixing project is a "people's heart project" that saves fresh water resources and solves the problem of people pouring water. In order to ensure the quality of the salty and light mixed water-saving project and make it energy-saving and efficient, we carefully summarize the experience of the previous two years, carefully design, meticulously construct, strictly manage, and sign the responsibility with the relevant villages and construction units. Ensure that every well is built with excellent engineering. At present, the county has completed 380 salt-blown mixed well groups, and by the end of November, it can complete the construction tasks of 400 well groups throughout the year. According to estimates, this year's construction of the brackish mixed-mixing project will save farmers more than 4 million land costs. yuan.

The renovation of dangerous bridges is a long-awaited event for the masses. In order to do a good job in the renovation of dangerous bridges, the director personally led the team, organized engineering and technical personnel, conducted on-the-spot investigations on the dangerous bridges in the county, and proposed renovation proposals to ensure the quality of the projects. The water conservancy engineering company has drawn up the technical strength and carefully constructed each bridge. Up to now, it has repaired 3 buildings and built 5 new ones. On October 16 this year, the city held a conference on water-saving irrigation and rural water conservancy construction held in our county. Comrade Xingtang, member of the Standing Committee of the County Party Committee and secretary of the Agricultural Work Committee, made a typical speech at the meeting. The provincial water conservancy department, the municipal party committee, the municipal government, the municipal people's congress, the leaders of the CPPCC, and the responsible comrades of the relevant departments of the counties, cities and municipalities and the municipal government directly visited and inspected the county's brackish mixing and dangerous bridge reconstruction projects, and gave high praise.

3. Seriously improve the construction of water-saving demonstration projects and promote the rational use of water resources

Through the active efforts of the bureau, the “08 water-saving irrigation demonstration project” with a total investment of 874,100 yuan was settled in Guangchuan Town of our county. The demonstration area covers an area of ​​3,600 mu, involving three villages. After the project was completed, 1,850 people benefited. Our bureau organizes intensive strength, prepares plans, conducts on-site surveys, and through the provincial unified bidding, all the required materials are sent to the field, and organizes engineering and technical personnel to go to the site to guide the construction, and conscientiously do the engineering support and pipeline installation work. Completed at the end of November, the implementation of the project played a positive role in promoting high-standard water-saving technology in the county.

Since the beginning of this year, the county has newly opened farmland irrigation and renewed 42 wells, newly laid underground anti-seepage pipelines of 52,000 meters, and newly added water-saving area of ​​18,000 mu, which basically realized the whole process of farmland irrigation.

4. Actively do a good job in the construction of human drinking safety projects to ensure the health of the people.

In 2008, the people's drinking safety project in our county was mainly to change water and reduce fluoride and centralized water supply projects. According to the actual situation of each township, we completed the two centralized water supply plants with an investment of 2.72 million yuan with Wangqiansi Town and Liangji Township as pilots. And 8 village people drink safety projects. At present, Liangji Water Supply Plant has completed the construction of office buildings, clean water pools, pressurized pump rooms, and fences. Equipment installation has been basically completed; Wangqian Water Supply Plant is under construction; 8 people drinking safe village has been completed 7 well drilling projects in the village, and began to install fluorine reduction equipment.

5. Do your best to prepare for flood control and ensure the safety of the county.

In order to do a good job of flood control this year, we started to conduct a serious inspection of the county's river channel, bridge gate engineering facilities and the South Canal dike from the beginning of May. We are in charge of the problems identified by the county flood control headquarters. The relevant villages will be settled within a time limit to ensure safety during the flood season. With the reform of the county and township institutions, we timely adjusted the county and township two-level flood control headquarters, implemented the Baodi, Baohe, Baotou and Baozhou regional responsibility systems, and issued the "2008 2008 Flood Control Plan." At the same time, the inspection and maintenance and opening and closing tests were carried out on the 26 temperate gates in the county. The anti-mite radio and telephone are on duty 24 hours a day and night, and are supervised by a director. The reserve and management of flood-fighting and emergency materials were all implemented in departments and personnel, and the labeling was established. The entire flood prevention work was well prepared and well-arranged, and was repeatedly affirmed by relevant provincial and municipal leaders.

6. Increase water law propaganda and law enforcement, and change people's water use concept

Since the beginning of this year, we have increased the publicity of water law, invested nearly 30,000 yuan to organize a series of "Water Law" publicity activities, and on March 22, "World Water Day" and "China Water Week" "Water Law" propaganda During the event, we hired a professional literary and art group to hold a special program on the theme of “saving water and protecting water resources” and using television stations and publicity media to spread it widely. At the same time, we have written more than 300 large-scale slogans in 16 townships and more than 20 key towns in the county and the whole county. The publicity effect is very remarkable, and it has been affirmed by the leaders of the city and county.

7. Focusing on county economic development, do a good job in bureau-based enterprises and enterprise restructuring

Drilling companies and water conservancy engineering companies, while doing their own business, focus on the construction of water conservancy projects, key projects and services in the county, and strive to complete the annual tax payment of 2 million yuan. By the end of October, the tax paid was 1.45 million yuan and the profit was 1.74 million yuan.

While maintaining the stability and development of the company, according to the opinions of the county government, we actively grasped the restructuring of the bureau-run enterprises. So far, the restructuring of the Longhua Pipe Factory and the Drought Relief Service Center has been completed. The restructuring of Anling Pipe Factory and Water Conservancy Service Company is underway. Since last year, we have raised funds according to the company's situation, and have provided pension insurance for the drought relief service center and the old comrades who have worked in the water for many years, which has relieved their worries.

Second, the existing problems

Water resources shortage and social and economic development have contradictions on water resources demand; water resources waste, river channel engineering and water pollution are still very serious; water conservancy facilities are aging, river channel siltation is very serious; water resources management and water project management are still lacking There is still a lot of resistance to the collection of the South-to-North Water Transfer Fund, water resources fees and river maintenance and management fees; there are many staff in the whole system, the team is huge, the age structure and professional knowledge level are very different, and the remaining problems of individual enterprises are not all obtained. To solve the problem, the institutional and institutional obstacles to water conservancy development have not been fundamentally resolved.

Third, the 2019 work plan

guiding ideology

Guided by the spirit of the 17th Party Congress, guided by the scientific outlook on development, adhere to the great liberation of ideas, promote the development and rapid development of water affairs; adhere to comprehensive planning, comprehensive management, and overall consideration to ensure the rational use of water resources; Pay equal attention to construction management, earnestly do a good job in the management and protection of existing projects, highlight the quality control of construction projects, and strive to maximize their effectiveness; adhere to reform and innovation, actively explore, rationalize the system, and ensure the sustainable use of water resources. The leap-forward development of the county's economy and society

exhibition.

work goals

1. Increase the running of project funds, maintain communication with higher authorities, timely grasp investment information, and focus on the operation of water-saving irrigation, dangerous bridge reconstruction, and human-use safety projects. Next year, 3-5 key projects for national investment will be strived for, and efforts will be made to achieve a new growth in special funds.

2. Continue to do a good job of water-saving projects focusing on salty and light mixed pouring, and build all the wells suitable for salty and light mixing in the brackish water area of ​​the county into a salty and mixed mixed well group. In 2019, the project plans to complete the construction of 500 well groups. . The utilization rate of brackish water in the county is over 80%.

3. Seriously complete the task of dangerous bridge reconstruction planned by the county government, and strive to solve the problem of people's roads.

4. Actively do a good job in drinking people's safety. In 2019, the people's drinking safety project in our county was mainly to change water and reduce fluoride and concentrate water supply projects. After completing the overall supporting construction of Liangji and Wangqiansi waterworks and ensuring normal operation, we plan to build two new water plants and 5 A joint village water supply point to solve people's drinking water safety problems.

5. Focus on the development of the county economy and do a good job in the work of the bureau. Drilling companies and water conservancy engineering companies, while doing their own business, focus on the county's water conservancy project construction, key projects and services to do a good job, to achieve a global game, and strive to complete the tax paid more than 2 million yuan.

6. Increase the propaganda and implementation of water law and change people's water use concept. Combine "World Water Day" and "China Water Week" to carry out a series of publicity activities to increase water law enforcement. The focus is on river regulation and water metering installation. Through publicity and governance, a water use mechanism that is compatible with economic development is established.