Supervision Department Weak Electricity Project Engineering Data Reporting Materials


Dear leaders, and colleagues from all participating organizations!

First of all, I am very grateful to all the leaders and experts for coming to the xx terminal project for completion and acceptance of work guidance; the weak electricity system involved in the supervision of Northwest Civil Aviation includes building automation, computer network system, ground information system, function center and computer room monitoring system, office Automation system, security information management system, departure system, flight information display system, public address system, integrated wiring system, weak bridge and supporting engineering, security system, pos system, cable TV system, clock system, internal dispatch communication system, Geographic information system, security equipment system, Skynet system, baggage handling system, boarding bridge system, 400hz power system, aircraft bridge air conditioning system;

In order to ensure the integrity of the project data and the accuracy of the data, the Supervisory Department has synchronized the data control of the t2 terminal building with the progress of the project. In the collection process, it is strictly in accordance with the xx provincial building data file version and civil aviation professional data to ensure the engineering data. The completeness.

The following is a brief report on the information of the participating units:

Completion data of the following construction units, AVIC weak electricity, Beijing Zhonghang Hangan, Guangzhou Fudan Otto, Vanderland, Thyssen boarding bridge, itw ground service, Beijing Zhongduan Anmin, Tongfang Weishi, Beijing Civil Aviation Equipment company, Guangdong Shenling Air Conditioning Equipment Co., Ltd. and other 10 units, a total of 187 volumes of information. The supervision unit has a total of 7 volumes.

The construction unit information includes:

Construction materials, equipment, construction accessories, technical approval, technical economic visa,

Inspection batch acceptance records, concealed acceptance records, as-built drawings, construction plans, cases, scripts, in-depth design, and requirements specifications.

Supervision materials include; supervision engineer notice, supervision work contact list, supervision regular meeting minutes, special meeting minutes, supervision diary, quality acceptance assessment report, supervision plan, supervision rules, design change order, supervision monthly report,

During the construction process, the supervision department supervised the construction unit and collected the materials in strict accordance with the national laws and regulations. Before the completion and acceptance, the materials were further standardized and organized by the responsible personnel of the information office of the airport construction headquarters. Cataloging, numbering. The supervision and construction units worked side by side to complete the data work of the weak electricity project of the t2 terminal building.

After supervising the collection, sorting, inventory, and basic information, the Supervisory Department can conduct data acceptance.