Water Affairs Bureau 2019 year-end summary and 2019 work plan


In XX, under the correct leadership of the county party committee and the county government, and under the strong support of the higher authorities, the Water Affairs Bureau closely focused on the overall situation of the county's economic development, emancipated the mind, changed the style of work, sought truth and pragmatism, worked hard, and worked hard. Functional role. In the aspects of salty and light mixing, dangerous bridge reconstruction, human drinking safety, and promotion of water saving technology, it has achieved relatively obvious results.
I. Completion of several major tasks in XX
1. The next big force to do a good job in project construction, and actively strive for higher-level fund support projects is the main driving force for water conservancy construction. The key to the development of water conservancy construction is in the project. Since the beginning of this year, we have seized the favorable opportunity of the state to support the "three rural issues" and vigorously grasped the project running. The bureau set up a leading group running the project with the director as the leader, organized the staff to take separate actions, and used all available factors and relationships to run the city bureau and the provincial department, and actively strive for the support of the superior. After unremitting efforts, we have won the salty and light mixed water saving project, the dangerous bridge reconstruction project, the water saving irrigation demonstration project and the human drinking safety project, etc., and strived for more than 8.7 million yuan in project funds. The implementation of the project has laid a good foundation for the development of the “xxx” water conservancy project and the construction of new countryside in our county.
2. Vigorously implement the construction of salty mixed mixing and dangerous bridge reconstruction projects, benefiting the people of the county to implement the salty mixed mixing and dangerous bridge reconstruction projects. It is the two practical things for the county party committee and the county government to do for the people. Key work. The salty and light mixing project is a "people's heart project" that saves fresh water resources and solves the problem of people pouring water. In order to ensure the quality of the salty and light mixed water-saving project and make it energy-saving and efficient, we carefully summarize the experience of the previous two years, carefully design, meticulously construct, strictly manage, and sign the responsibility with the relevant villages and construction units. Ensure that every well is built with excellent engineering. At present, the county has completed 380 salt-blown mixed well groups, and by the end of November, it can complete the construction tasks of 400 well groups throughout the year. According to estimates, the brackish mixed-mixing project constructed this year will save farmers more than 4 million land costs. yuan.
The renovation of dangerous bridges is a long-awaited event for the masses. In order to do a good job in the renovation of dangerous bridges, the director personally led the team, organized engineering and technical personnel, conducted on-the-spot investigations on the dangerous bridges in the county, and proposed renovation proposals to ensure the quality of the projects. The water conservancy engineering company has developed the technical strength and carefully constructed each bridge. Up to now, it has repaired 3 seats and added 5 new ones. On October 16 this year, the city held a conference on water-saving irrigation and rural water conservancy construction held in our county. Comrade Xingtang, member of the Standing Committee of the County Party Committee and secretary of the Agricultural Work Committee, made a typical speech at the meeting. The provincial water conservancy department, the municipal party committee, the municipal government, the municipal people's congress, the leaders of the CPPCC, and the responsible comrades of the relevant departments of the counties, cities and municipalities and the municipal government directly visited and inspected the county's brackish mixing and dangerous bridge reconstruction projects, and gave high praise.
3. Seriously do a good job in water-saving demonstration project construction and promote the rational use of water resources. The “08 Water-saving Irrigation Demonstration Project” with a total investment of 874,100 yuan has been settled in Guangchuan Town of our county with a total investment of 874,100 yuan. The demonstration area covers an area of ​​3,600 mu. It involves three villages. After the project was completed, 1,850 people benefited. Our bureau organizes intensive strength, prepares plans, conducts on-site surveys, and through the provincial unified bidding, all the required materials are sent to the field, and organizes engineering and technical personnel to go to the site to guide the construction, and conscientiously do a good job in engineering support and access installation. Completed at the end of November, the implementation of the project played a positive role in promoting high-standard water-saving technology in the county.
Since the beginning of this year, the county has newly opened farmland irrigation and renewed 42 wells, newly laid underground anti-seepage path of 52,000 meters, and newly added water-saving area of ​​18,000 mu, which basically realized the whole process of farmland irrigation.
4. Actively do a good job in the construction of human drinking safety projects to ensure the health of the people.
In XX, the safety project for people in our county was mainly to change water and reduce fluoride and concentrate water supply projects. According to the actual situation of each township, we completed the two centralized water supply plants with an investment of 2.72 million yuan with Wangqiansi Town and Liangji Township as pilots. And 8 village people drink safety projects. At present, Liangji Water Supply Plant has completed the construction of office buildings, clean water tanks, pressurized pump rooms, and fences. Equipment installation has been basically completed; Wangqian Water Supply Plant is under construction; 8 people drinking safe village has completed 7 The drilling project of a village and the installation of fluorine-reducing equipment.
5. Fully grasp the preparations for flood control and ensure the safe crossing of the county. In order to do a good job of flood control this year, we began to carefully check the county river channel, the bridge gate engineering facilities and the South Canal dike in May. In the name of the problem, we blamed the relevant village deadlines in the name of the county flood control headquarters to ensure the safety of the flood season. With the reform of the county and township institutions, we timely adjusted the county and township two-level flood control headquarters, implemented the Baodi, Baohe, Baotou and Baozhou regional responsibility systems, and promulgated the "2008XX Flood Control Plan." At the same time, the inspection and maintenance and opening and closing tests were carried out on the 26 temperate gates in the county. The anti-mite radio and telephone are on duty 24 hours a day and night, and are supervised by a director. The reserve and management of flood-fighting and emergency materials were all implemented in departments and personnel, and the labeling was established. The entire flood prevention work was well prepared and well-arranged, and was repeatedly affirmed by relevant provincial and municipal leaders.
6. Increase the propaganda and law enforcement of water law and change people's water use concept. Since the beginning of this year, we have increased the publicity of water law, and invested nearly 30,000 yuan to organize a series of "Water Law" publicity activities. On March 22nd, In the “World Water Day” and “China Water Week” and “Water Law” publicity activities, we hired professional literature and art groups to organize a special program with the theme of “saving water and protecting water resources” and using TV stations and promotional media. Widely spread. At the same time, we have written more than 300 large-scale slogans in 16 townships and more than 20 key towns in the county and the whole county. The publicity effect is very remarkable, and it has been affirmed by the leaders of the city and county.
In order to intensify law enforcement and seriously investigate and punish illegal activities that damage water conservancy facilities, on November 1st, with the cooperation of the public security, courts and other departments, we organized a joint operation to safeguard the safety of river courses, and the safety of illegal construction of rivers and rivers. The parties carried out a serious investigation and investigation, and seized a part of the earth moving vehicle, and publicly exposed it on the county television station. Since the beginning of this year, we have investigated and dealt with 15 types of water cases, and have maintained the seriousness of the water law. At the provincial water conservancy comprehensive law enforcement seminar held in July this year, our county, as a pilot county for law enforcement in the province, introduced the implementation of water law enforcement work at the meeting and was well received by the leaders of the provincial water conservancy department.
7. Focusing on county economic development, we must do a good job in the bureau-run enterprises and enterprise restructuring work drilling companies and water conservancy engineering companies. While doing a good job of their own operations, we will focus on the construction of water conservancy projects, key projects and services in the county, and strive to do all kinds of work. In the year, the tax paid was 2 million yuan. By the end of October, the tax paid was 1.45 million yuan and the profit was 1.74 million yuan.
While maintaining the stability and development of the company, according to the opinions of the county government, we actively grasped the restructuring of the bureau-run enterprises. So far, the restructuring of the Longhua Pipe Factory and the Drought Relief Service Center has been completed. The restructuring of Anling Pipe Factory and Water Conservancy Service Company is underway. Since last year, we have raised funds according to the company's situation, and have provided pension insurance for the drought relief service center and the old comrades who have worked in the water for many years, which has relieved their worries.
Second, the existing problems Water shortage and social economic development contradicts the demand for water resources; water resources waste, destruction of river works and water pollution problems are still very serious; water conservancy facilities aging, river channel siltation is very serious; water resources management and water There is still a lack of strength in project management. There is still a lot of resistance to the collection of the South-to-North Water Transfer Fund, water resources fees and river maintenance and management fees. There are many staff in the whole system, the team is huge, the age structure and professional knowledge level are very different, and the individual enterprises The remaining problems have not been fully resolved, and the institutional and institutional obstacles to water conservancy development have not been fundamentally resolved.
Third, the guiding ideology of the work plan of XX is guided by the spirit of the party's xx spirit, guided by the scientific concept of development, adheres to the great liberation of ideas, promotes the development and rapid development of water affairs; adheres to comprehensive planning, comprehensive management, and overall consideration To ensure the rational use of water resources; adhere to the importance of construction management, earnestly do a good job in the management and utilization of existing projects, highlight the quality control of construction projects, and strive to maximize their effectiveness; adhere to reform and innovation, actively explore and rationalize the system to The sustainable use of water resources guarantees the leap-forward development of the county's economy and society.
work goals
1. Increase the running of project funds, maintain communication with higher authorities, timely grasp investment information, and focus on the operation of water-saving irrigation, dangerous bridge reconstruction, and human-use safety projects. Next year, we will strive for 3-5 key projects for national investment, and strive to achieve a new growth in special funds.
2. Continue to do a good job of water-saving projects focusing on salty and light mixed pouring, and build all the wells suitable for salty and light mixed watering in the brackish water area of ​​the county into a salty and mixed mixed well group. The XX year plans to complete the construction of 500 well groups. . The utilization rate of brackish water in the county is over 80%.
3. Seriously complete the task of dangerous bridge reconstruction planned by the county government, and strive to solve the problem of people's roads.
4. Actively do a good job in drinking people's safety. In XX, the people's drinking safety project in our county was mainly to change water and reduce fluoride and concentrate water supply projects. After completing the overall supporting construction of Liangji and Wangqian Water Works and ensuring normal operation, we plan to add two new water plants and 5 joint village water points to solve people's drinking water safety problems.
5. Focus on the development of the county economy and do a good job in the work of the bureau. Drilling companies and water conservancy engineering companies, while doing their own business, focus on the county's water conservancy project construction, key projects and services to do a good job, to achieve a global game, and strive to complete the tax paid more than 2 million yuan.
6. Increase the propaganda and implementation of water law and change people's water use concept. Combine "World Water Day" and "China Water Week" to carry out a series of publicity activities to increase water law enforcement. The focus is on river regulation and water metering installation. Through publicity and governance, a water use mechanism that is compatible with economic development is established.