In order to continuously promote the basic management of the Songyuan Gas Production Plant, improve the management level of the grassroots construction, and ensure the completion of the annual oil and gas production and various production and operation indicators, the research and decision of the plant will be carried out to carry out the inspection of the basic management of the basic management in the third quarter. The relevant matters are hereby notified as follows:

First, the theme

On the basis of summarizing the experience and deficiencies of the second-quarter inspections, through comprehensive inspection of the grassroots construction work, especially the inspection and guidance of key posts and key links, exposing problems, solving problems, and paying close attention to winter safety production, further Consolidate the basic infrastructure construction, implement the standardized and finely controlled management mode within the whole plant, complete the striving target set by the Songyuan Gas Production Plant 2019 Grassroots Construction Implementation Plan, and comprehensively create a new situation for the grassroots foundation work of our factory.

Second, the content

1. Construction of grassroots teams and party branches

2. Staff team building

3. Grassroots cultural construction

4. Reservoir basic management

5, oil management basic management

6, material management

7, asset equipment management

8. Grassroots financial accounting management

9, safe production management

10. Ground production system management

11, security management

12, information management

13. Comprehensive management of grassroots construction

14. Letters and visits stability management

Third, time

October 11th - October 16th

Fourth, the scope

All grassroots teams and all team positions.

Five ways

1. On-site inspection and on-site scoring.

The inspectors of the inspection department of the organ shall, in accordance with the scoring standards of the "Assessment Rules", conduct on-site scoring to determine the rectification time.

2. Combination of centralized inspection and decentralized inspection.

Under the organization of the Party and Community Work Division, the agency inspection department is responsible for the centralized inspection of the safety production site, development materials, and integrated management of the team and affiliated teams; for the inspection of the first-line team, it is organized by itself within the prescribed completion time. an examination.

Sixth, the organization

In order to successfully complete this basic management inspection, an inspection leadership team was established.

Team leader: Song Qiu Guo Jingxin

Deputy Team Leader: Liu Zhendong Yao Zhi Ge Li Guo Yonggong

Qin Mingzhe Zhang Mingxin Zhang Yanfeng Zhang Wenjin

Member: Li Shujun, Zhu Rubin, Han Shangzhi, Li Xiahui, Jing Hua, Xu Jingwei, Qi Haizhong, Guosheng, Yuan Gang, Wang Aili, Zou Feng, Li Kexin, Jiang Zhian, Zhang Houjun, Li Tiezhen, Liu Hanjie, Jiang Tao, Xiang Baojun

Coordination: Xiang Baojun Cai Yunpeng

According to the team department, team, and site, three inspection teams will be formed. The contents are detailed in the attached table.

Seven, the key inspection content

1. Production site

Equipment, safety, technology, production, infrastructure and so on. Implementation of safety and environmental protection work and measures of various units, investigation and treatment of hidden dangers, fire prevention, explosion prevention, anti-poisoning, traffic safety production management; implementation of winter defense insulation work and measures, operation of power system, preparation and review of emergency plans The construction and commissioning of key construction projects; the safety management of pumping units, boilers, pumps and other equipment and the implementation standards and regulations of safety protection devices and the standby equipment are in good condition. Process management and collection management.

2, the basic information

The completion of development indicators; the management of abnormal wells; the completion of the report data, no false information; the data acquisition device is intact; the preparation and implementation of data admission standards; the information acquisition regulations; information management.

Eight, requirements

1. All the departments involved in the "Six Good" and "Five-type" teams must participate in the completion of all inspections, and no missing units are allowed.

2. The inspection department shall strictly follow the inspection and assessment rules and conduct inspections one by one, and have the on-site signature confirmation of the inspectors and the inspected personnel. All department inspection summary forms and summary report materials must be signed by the relevant responsible leaders of the factory.

3. The inspection department should carefully organize and arrange for personnel with high quality, excellent style and strong sense of responsibility to participate in the inspection work. The head of the factory is required to lead the team personally, and the heads of various departments participate in the inspection, especially the key station teams and key key positions must be present in person.

4, the inspectors should seek truth from facts, put an end to the phenomenon of human sentiment and falsification. It is necessary to point out specific problems and effectively help grassroots units to solve problems.

5. The leaders of the grassroots station team should check the relationship with the normal production operation to avoid the phenomenon that the production is affected by the inspection.

6. The grassroots station team should organize self-inspection and self-inspection work, and pass the self-inspection summary materials to the Party and Community Work Division before October 11. The self-inspection summary should include the following contents: self-inspection and self-inspection of the unit; problems that need to be solved by the higher authorities; good management experience of the unit; and ideas for strengthening the basic management of the grassroots in the future. Emphasis will be placed on the construction of the five-type team, the management methods of the advanced team, and the next steps in the team construction.

7. The summary materials of the inspection department should be concise and concise, and pay attention to summarizing the following main situations: first, the basic situation of the inspection and overall evaluation; second, good typical units and good practices; third, the main problems and causes, especially The project status of the key inspection; the fourth is the opinion or suggestion for improving the basic management work; the fifth is to clearly put forward the concept of strengthening the basic management of the grassroots in the next step of the system. The electronic version of the summary materials will be transmitted to the Party and Community Work Section before October 20.

Nine, assessment

1. Assessment of grassroots station teams and teams:

Based on the "Inspection Rules of the Company's "Six Good Stations"" and "Inspection Rules for the "Five Type Teams" of Songyuan Gas Production Plant", the assessment rules in the "2019 Grassroots Construction Implementation Plan of Songyuan Gas Production Plant" are based on the assessment rules.

For the station teams and teams that disrupt the normal production order because of the inspection, the station or team should be deducted 100-500 yuan according to the circumstances.

Did not submit self-inspection self-examination materials as required, deducted the station team 500 yuan.

2. Assessment of the inspection department:

A unit that was inspected was omitted, and the deduction department was 500 yuan.

There is no check-by-point inspection on a point-by-point basis, and there is no signing by the inspectors and the inspectors, and each deduction department is 100 yuan. If there is no factory responsible for the signature of the leadership, the deduction department will be 1,000 yuan.

Once the inspectors were found to have falsification and human sentiment, the inspectors were deducted 100-500 yuan according to the circumstances.

If the inspection summary materials are not completed as required, the deduction department shall be 1,000 yuan.