Urban Construction Bureau Urban Flood Control Work Plan in 2019
This year is the xx anniversary of the National Day. It is of great significance to do a good job in urban flood prevention. According to the forecast of the meteorological department, the total trend of precipitation in the province this summer is slightly less than that of normal years, but the uneven regional precipitation may cause floods and droughts at the same time. The Liaohe and Weihe rivers may have general magnitude floods, and some tributaries may occur in larger quantities. Level flood. At the same time, the city's urban drainage official website has a long process, and the construction projects have more precipitation, which increases the load on the existing urban drainage pipes in the city. The flood drainage pressure in the city is relatively high. This year's flood control situation is not optimistic. In order to protect the urban operation and the safety of people's lives and property during the flood season, this plan is formulated in conjunction with the current situation of flood control and drainage facilities in our city and the actual situation of urban flood control.
First, the guiding ideology conscientiously implements the spirit of the provincial and municipal flood control conferences, and adheres to the principle of “safety first, always standing unprepared, prevention-oriented, and full-fledged rescue”, based on “anti-big squad, anti-catastrophe and catastrophe”, according to The principle of “unified command, hierarchical management, comprehensive defense, and emphasis on strengthening” focuses on eliminating urban street water accumulation, ensuring urban safety as a goal, and fully combating possible flood disasters to ensure the normal operation of urban infrastructure. The Weihe River dam is not broken, and there is no disaster in the urban area. The city's water supply, power supply, gas supply, communication, and traffic are not interrupted, and there are no casualties in the collapse of houses. When floods occur, we must fully rescue and resist disasters, and strive to minimize losses.
Second, the working time limit According to the actual situation of the city, the city flood control is divided into three periods: the flood season, the main flood season and the emergency flood control period.
Period: June 1st to September 20th, xx.
Main period: July 20th to August 20th, xx.
Emergency flood control period: during the flood disaster period during flood disasters.
III. Work and Drainage Facilities The Municipal Water Affairs Group and the urban management bureaus of all districts should complete the cleaning and dredging of the drainage pipes in the city by June 10, especially the drainage pipes that are easy to block and the low-lying areas in the urban-rural integration area should be repeated. Cleaning and dredging. Drainage maintenance personnel should do “to rain, and rain to the post”, and timely remove the water-blocking material from the rainwater well. When the rainfall is large, the drainage manhole cover can be opened to accelerate the discharge of stagnant water. At the same time, special personnel should be sent to look after the wellhead and manhole cover. Cover the water immediately after it has been removed.
Each pump station should pump up the emptying pipe before heavy rain falls. The urban overpass pumping station should be equipped with temporary machine pumps, generator sets and oil materials to eliminate accumulated water under the overpass. During the main flood season, all pumping stations in the city should maintain low water level operation. When the water level of the Weihe River rises and the urban drainage is supported by the top, the industrial and agricultural pumping station must be started, and if necessary, the standby pump should be set up for strong discharge.
river
1, Luohe. Guaranteed flow on the right bank of the flood control embankment of the urban section: Jinjiatun to the Jiajiapu Gate is 6260 cubic meters per second. In the flood season, the rescue work of the flood control dam of the Weihe urban section was carried out by the Flood Control Headquarters of the ###市浑河城段 belonging to the Municipal Water Resources Bureau. The flood control headquarters of each district implemented the inspection according to the clearly defined flood control section. Protection work, and undertake flood-fighting and rescue missions in flood season. The flood control headquarters of each district shall strengthen the protection and defense of key points such as crossings and weak embankments on the flood control dams, organize the rescue teams of the berms, and prepare flood prevention and rescue equipment such as flood control equipment, grass bags and earth materials. Property owners who have crossed the dam structure should conduct safety inspections beforehand, and find that problems should be taken early to strengthen the safety hazards of flood control.
2. Newly opened river. The rescue mission of the Xinkaihecheng section is divided into administrative areas, and is managed by the Dongling District, Dadong District, Shenhe District, Huanggu District and Yuhong District. The flood control headquarters of each district should do a good job in flood control, implement protective measures, effectively arrange the dangers, dangers and rescue work of units and residents along the river, and actively defend against the newly opened river water invading the urban area, especially the emperor located in the lower reaches of the Xinkai River. Gu District and Yuhong District should focus on fortification.
The opening and closing of the Yushutun Flood Control Gate, the Yushuyu Floodgate, the Sancha Gate in the lower reaches of the Xinkai River and the Weigong River Intake Gate in the upper reaches of the Xinkai River are respectively the drainage management office of the Municipal Water Group and the Weibei Irrigation Canal to which the Municipal Water Resources Bureau belongs. The management office is responsible for repairing the gates before the squatting, ensuring that the gates are flexible, safe and reliable. During the flood season, people are assigned to watch the duty on duty, and the gates are properly opened and closed for flood control and flood discharge.
3. South Canal and Weigong River. The operation and opening and closing of the sluice gate of Nanhu Park Lake along the South Canal is under the responsibility of Nanhu Park. The gate of Longwangmiao is maintained and operated by the Heping District Urban Management Bureau. The gate of the culvert overflow is controlled by the Drainage Management Office of the Municipal Water Group. Maintenance management and operation opening and closing, to complete the gate maintenance and adjustment before June 10, to ensure that the gate is flexible, safe and reliable, and before June 10, the emergency plan for the safe operation of the flood gate will be reported to the municipal flood control headquarters for the record. In the flood season, the water level of the South Canal and each park lake should be lowered, and the water depth of the river and the lake should be controlled below 1 m. The Drainage Management Office of the Municipal Water Group is responsible for inspecting the water level of the two rivers and feeding back the water level information to the Municipal Flood Control Headquarters at any time. The flood discharge flow of the South Canal entrance gate and the Weigong River intake gate is dispatched by the municipal flood control headquarters. The opening and closing of the gate is operated by the Weibei Irrigation Canal Management Office of the Municipal Water Conservancy Bureau.
4, Xihe. The rescue work of the Xihe River is under the responsibility of the flood control headquarters of the district. The river section above the railway bridge is responsible for the Tiexi District; the river section below the railway bridge is responsible for the flood zone. The flood control headquarters of the district should organize the units and residents along the river to prepare for flood control, strengthen the weak river embankment, and avoid the river water harming the urban area. Before the flood control channel gates in the lower reaches of the Xihe River are not inspected, the Municipal Construction Committee is responsible for organizing the construction units to do the daily maintenance management and opening and closing of the gates to ensure timely, safe and reliable opening and closing. Before June 10, the name, unit, and contact number of the person responsible for opening and closing the gate shall be reported to the Municipal Flood Control Headquarters for the record.
The Mingshan Grey Mountain Open Channel and the Qi 24th Open Channel are managed by the Municipal Water Affairs Group. Before the flood control, the water blocking parts such as the culverts of the canal section shall be dredged and dredged, and the gates on the canal sections shall be repaired to ensure the safe operation and flexible opening and closing of the gates. Ensure the safety of flood control and flood discharge of the Gushan Reservoir.
Reservoir
1. Gray Mountain Reservoir. The Municipal Flood Control Headquarters is responsible for the operation and dispatch of the reservoir, and the Municipal Water Affairs Group is responsible for the daily maintenance and supervision of the reservoir. The Municipal Water Affairs Group shall establish a reservoir safety degree responsibility system with the main administrative leader as the management responsible person, the chief engineer as the technically responsible person, and the competent leader as the rescue responsibility person. It is necessary to inspect the inspection of the reservoir area and the condition of the reservoir facilities at any time, and utilize the existing reservoir. Propaganda board walls and other facilities to promote the importance of the reservoir to local villagers, improve the villagers' awareness of flood prevention and the protection of reservoir facilities, find problems in a timely manner, and promptly report back to the city's urban flood control headquarters. It is necessary to strengthen the water-slope and back-slope slopes of the reservoir, level the rain-drainage ditch, clean up the residual soil of the dam and clear the spillway. In the flood season, the water level of the Gushan Reservoir was controlled below 68 meters, and the main storage period of the Gushan Reservoir was empty. The Municipal Water Affairs Group shall formulate an emergency plan for the Gushan Reservoir before June 10 and report it to the Municipal Flood Control Headquarters for the record.
2. Zhueryu Reservoir. The Dadong District Flood Control Headquarters is responsible for the operation and dispatch of the Zhuerzhen Reservoir. It is necessary to put the management, technology and rescue personnel responsible for the reservoir in place. Overhaul and maintain the reservoir water supply tunnels, gates, dams and other facilities, pay close attention to changes in water level and water conditions to ensure fullness. Before June 10, the emergency plan for the reservoir will be worked out and reported to the municipal city flood control headquarters for the record.
The Municipal Construction Committee of the project under construction shall organize the construction units to implement the site flood control measures, strengthen the supervision and inspection of the construction site flood prevention work, and focus on the flood prevention work of key pits, slopes, tower cranes and scaffolding foundations to ensure the safety of the site. While ensuring the safety of its own construction, the MRT project must take measures to reduce the load on urban drainage facilities and strengthen inspections to ensure road safety along the MRT construction. In order to ensure that there is no water along the Golden Corridor, the Municipal Water Affairs Group shall, depending on the timely conditions of rain, propose to reduce the number of opening pumps of the various construction sites along the Golden Corridor until the precipitation is stopped, and the Municipal Construction Committee Jinlang Office shall coordinate the implementation. The Municipal Water Group shall speed up the construction progress of the Beiling Park Pumping Station and the Nanhu Park Gate Reconstruction Project to ensure that it will be completed and benefited before the main project.
The urban real estate department and the administrative law enforcement department shall conduct a comprehensive inspection of the dangerous buildings and illegal construction houses in the city. The problems found shall be rectified before the completion of the renovation. The illegal construction of the houses shall be dismantled as soon as possible, and the dangerous houses that cannot be repaired and reinforced temporarily shall be formulated. Good emergency plan, implement the hazard measures.
Fourth, the division of responsibility
1. The Municipal Urban Flood Control Headquarters Office is responsible for the daily work of urban flood control, coordinating the work of urban flood control, responsible for daily command and dispatch, supervision and inspection, and issuing early warning information in accordance with the prescribed procedures.
2. Under the unified leadership of the Municipal Flood Control Headquarters, according to the principle of territorial management, the district governments are fully responsible for the urban flood prevention work within their respective administrative regions, and they must be aware of the position, organize the implementation in place, implement the measures in place, and put the material reserves in place. . Each district in the seven districts of the city will implement 100 rescue vehicles and 10,000 straw bags, and set up a flood prevention and rescue team of no less than 1,000 people.
3. The Municipal Water Affairs Group and the urban management bureaus of each district are responsible for the cleaning and dredging of the drainage pipes, and organize the comprehensive clearing of the sediments and water-blocking materials of the drainage pipes before June 10 to ensure the smooth drainage of the drainage pipes; Points of water removal and rescue work; before July 10, comprehensively repair the pump station, gate facilities and emergency mobile equipment to ensure full and reliable operation, at any time to listen to the emergency command transfer of the city's urban flood control headquarters; The drainage departments of all districts should be fully employed. The leaders of the Water Group should take the full command of the urban flood control headquarters to speed up the pumping of rainwater, ensure the smooth drainage of the urban street, and the normal opening and closing of the gates of the sewage treatment plants; Overhaul and key parts of the fortification, implement the emergency repair team to ensure that the city's water supply is normal during the flood season.
4. The Municipal Real Estate Bureau is responsible for the overhaul and reinforcement of dangerous buildings and the rescue and escape work. Before July 20th, the house reinforcement and repair work will be completed. For the time being, it is impossible to repair and reinforce the hardship measures.
5. The City MRT Construction Headquarters is responsible for the rain protection and drainage work of the MRT construction site and the safety protection work of the construction site. Depending on the public opinion, stop or reduce the water discharge into the urban drainage pipe as much as possible, and reduce the load on the drainage facilities in the flood season. The patrol inspection at the MRT construction site shall be promptly handled and reported to the Municipal Urban Flood Control Headquarters if it is found that it may cause landslides, settlements, etc. that affect traffic safety.
6. The Municipal Meteorological Bureau is responsible for providing timely and accurate information on meteorological information to the urban flood control headquarters during the flood season.
7. The municipalities, telecommunications, gas companies and other departments and units are responsible for the maintenance of their own pipeline facilities and the fortification of key parts, and implement the rescue team to ensure that the power supply and gas supply in the flood season are normal and the communication is fault-free.
8. The Municipal Public Security Bureau is responsible for the social security order, assisting the city and district urban flood control headquarters to crack down on the lawless elements that damage the urban flood control facilities and hinder the normal operation of flood control; the city traffic police detachment is responsible for maintaining traffic order, and timely adopting traffic control on the water section. Measures to give priority to vehicles that perform flood control tasks, and to ensure that urban flood control vehicles and flood control vehicles are unimpeded.
9. The Municipal Construction Committee is responsible for the maintenance and management and coordination of the construction sites in the city and the construction projects under their construction and the unhandled drainage facilities to ensure safe operation during the flood season.
10. The Municipal Health Bureau is responsible for medical rescue work and possible epidemic situation and prevention and treatment of infectious diseases.
11. The municipal and district administrative law enforcement bureaus are responsible for coordinating with the city and district urban flood control headquarters to clean up and rectify illegal and illegal structures that affect urban flood control and drainage.
12. The Municipal Transportation Bureau is responsible for the implementation of 100 emergency rescue vehicles.
Each responsible unit shall report the implementation status and contact information to the Municipal Urban Defense Command for the record before June 10.
V. Guarantee measures
1. Strengthen the organization and lead the city to establish ###市城市防汛指挥部. The chief commander is served by Xing Kai, member of the Standing Committee of the Municipal Party Committee and deputy mayor. The deputy commander is the deputy secretary-general of the municipal government ###, the director of the Municipal Construction Committee Qin Wenjun, the director of the Municipal Urban Construction Bureau Yu Shenguang, ###警备区谋谋长###,市The chairman of the water affairs group ### served as the commander of the district heads of the district governments and the leaders of the relevant departments of the municipal government. The office under the headquarters is responsible for the daily work of urban flood control. The office is located in the Municipal Urban Construction Bureau. The director of the office is served by Zeng Qingyuan, deputy director of the Municipal Urban Construction Bureau. The member units are composed of the municipal governments, the city's MRT construction headquarters, the administrative law enforcement bureau, the urban construction bureau, the construction commission, the meteorological bureau, the public security bureau, the traffic police detachment, the transportation bureau, the health bureau, the water conservancy bureau, the civil air defense office, the real estate bureau, # ##铁路局,###警区,Electricity, telecommunications, gas, water group and other departments and units.
Each member unit shall form a corresponding anti-mite organization, and the main administrative leaders shall bear full responsibility. All enterprises, institutions, schools, military units and social organizations in the city shall, under the unified command of the flood control headquarters of the district, establish anti-mite organizations and do a good job in flood prevention. The Chinese People's Liberation Army is an important force in flood control and flood fighting, and participates in urban flood prevention and rescue work when necessary. Each member unit shall formulate a flood prevention work plan and a rescue emergency plan, and report it to the municipal flood control headquarters for record before June 10.
2. Fully implement the staff of the flood control headquarters at all levels must abide by the rules and regulations, adhere to the work position, timely understand and master the grievances and dangers, appear grievances and dangers, deal with them immediately, and report to the superior flood control headquarters in time. . All units and individuals in the urban area of the city must obey the flood control and rescue command of the city's urban flood control headquarters, and undertake the task of fighting floods and rescues. All regions and departments must establish a strict flood prevention responsibility system, so that leaders can be divided into tasks, and the responsibility should be implemented. People must strictly implement the duty and value system, and implement 24-hour duty in the flood season. The main leaders in the main flood season should bring their own classes and prevent the duty value. The staff should not be left behind, and the hand and mobile phones should be kept open for 24 hours. If problems are found, they should be resolved and reported in time.
3. Strict liability investigation The municipal and district flood control headquarters should strengthen the supervision and inspection of flood prevention work. The municipal flood control headquarters conduct regular and irregular flood control safety inspections during flood control, and focus on checking the implementation of flood prevention hazards and flood control duty. . Units and individuals that have serious consequences due to poor leadership, blocked political orders, neglect of duties, and improper disposal shall be investigated and dealt with at a minimum, and units and individuals who have made positive contributions to urban flood prevention work shall be commended.
First, the guiding ideology conscientiously implements the spirit of the provincial and municipal flood control conferences, and adheres to the principle of “safety first, always standing unprepared, prevention-oriented, and full-fledged rescue”, based on “anti-big squad, anti-catastrophe and catastrophe”, according to The principle of “unified command, hierarchical management, comprehensive defense, and emphasis on strengthening” focuses on eliminating urban street water accumulation, ensuring urban safety as a goal, and fully combating possible flood disasters to ensure the normal operation of urban infrastructure. The Weihe River dam is not broken, and there is no disaster in the urban area. The city's water supply, power supply, gas supply, communication, and traffic are not interrupted, and there are no casualties in the collapse of houses. When floods occur, we must fully rescue and resist disasters, and strive to minimize losses.
Second, the working time limit According to the actual situation of the city, the city flood control is divided into three periods: the flood season, the main flood season and the emergency flood control period.
Period: June 1st to September 20th, xx.
Main period: July 20th to August 20th, xx.
Emergency flood control period: during the flood disaster period during flood disasters.
III. Work and Drainage Facilities The Municipal Water Affairs Group and the urban management bureaus of all districts should complete the cleaning and dredging of the drainage pipes in the city by June 10, especially the drainage pipes that are easy to block and the low-lying areas in the urban-rural integration area should be repeated. Cleaning and dredging. Drainage maintenance personnel should do “to rain, and rain to the post”, and timely remove the water-blocking material from the rainwater well. When the rainfall is large, the drainage manhole cover can be opened to accelerate the discharge of stagnant water. At the same time, special personnel should be sent to look after the wellhead and manhole cover. Cover the water immediately after it has been removed.
Each pump station should pump up the emptying pipe before heavy rain falls. The urban overpass pumping station should be equipped with temporary machine pumps, generator sets and oil materials to eliminate accumulated water under the overpass. During the main flood season, all pumping stations in the city should maintain low water level operation. When the water level of the Weihe River rises and the urban drainage is supported by the top, the industrial and agricultural pumping station must be started, and if necessary, the standby pump should be set up for strong discharge.
river
1, Luohe. Guaranteed flow on the right bank of the flood control embankment of the urban section: Jinjiatun to the Jiajiapu Gate is 6260 cubic meters per second. In the flood season, the rescue work of the flood control dam of the Weihe urban section was carried out by the Flood Control Headquarters of the ###市浑河城段 belonging to the Municipal Water Resources Bureau. The flood control headquarters of each district implemented the inspection according to the clearly defined flood control section. Protection work, and undertake flood-fighting and rescue missions in flood season. The flood control headquarters of each district shall strengthen the protection and defense of key points such as crossings and weak embankments on the flood control dams, organize the rescue teams of the berms, and prepare flood prevention and rescue equipment such as flood control equipment, grass bags and earth materials. Property owners who have crossed the dam structure should conduct safety inspections beforehand, and find that problems should be taken early to strengthen the safety hazards of flood control.
2. Newly opened river. The rescue mission of the Xinkaihecheng section is divided into administrative areas, and is managed by the Dongling District, Dadong District, Shenhe District, Huanggu District and Yuhong District. The flood control headquarters of each district should do a good job in flood control, implement protective measures, effectively arrange the dangers, dangers and rescue work of units and residents along the river, and actively defend against the newly opened river water invading the urban area, especially the emperor located in the lower reaches of the Xinkai River. Gu District and Yuhong District should focus on fortification.
The opening and closing of the Yushutun Flood Control Gate, the Yushuyu Floodgate, the Sancha Gate in the lower reaches of the Xinkai River and the Weigong River Intake Gate in the upper reaches of the Xinkai River are respectively the drainage management office of the Municipal Water Group and the Weibei Irrigation Canal to which the Municipal Water Resources Bureau belongs. The management office is responsible for repairing the gates before the squatting, ensuring that the gates are flexible, safe and reliable. During the flood season, people are assigned to watch the duty on duty, and the gates are properly opened and closed for flood control and flood discharge.
3. South Canal and Weigong River. The operation and opening and closing of the sluice gate of Nanhu Park Lake along the South Canal is under the responsibility of Nanhu Park. The gate of Longwangmiao is maintained and operated by the Heping District Urban Management Bureau. The gate of the culvert overflow is controlled by the Drainage Management Office of the Municipal Water Group. Maintenance management and operation opening and closing, to complete the gate maintenance and adjustment before June 10, to ensure that the gate is flexible, safe and reliable, and before June 10, the emergency plan for the safe operation of the flood gate will be reported to the municipal flood control headquarters for the record. In the flood season, the water level of the South Canal and each park lake should be lowered, and the water depth of the river and the lake should be controlled below 1 m. The Drainage Management Office of the Municipal Water Group is responsible for inspecting the water level of the two rivers and feeding back the water level information to the Municipal Flood Control Headquarters at any time. The flood discharge flow of the South Canal entrance gate and the Weigong River intake gate is dispatched by the municipal flood control headquarters. The opening and closing of the gate is operated by the Weibei Irrigation Canal Management Office of the Municipal Water Conservancy Bureau.
4, Xihe. The rescue work of the Xihe River is under the responsibility of the flood control headquarters of the district. The river section above the railway bridge is responsible for the Tiexi District; the river section below the railway bridge is responsible for the flood zone. The flood control headquarters of the district should organize the units and residents along the river to prepare for flood control, strengthen the weak river embankment, and avoid the river water harming the urban area. Before the flood control channel gates in the lower reaches of the Xihe River are not inspected, the Municipal Construction Committee is responsible for organizing the construction units to do the daily maintenance management and opening and closing of the gates to ensure timely, safe and reliable opening and closing. Before June 10, the name, unit, and contact number of the person responsible for opening and closing the gate shall be reported to the Municipal Flood Control Headquarters for the record.
The Mingshan Grey Mountain Open Channel and the Qi 24th Open Channel are managed by the Municipal Water Affairs Group. Before the flood control, the water blocking parts such as the culverts of the canal section shall be dredged and dredged, and the gates on the canal sections shall be repaired to ensure the safe operation and flexible opening and closing of the gates. Ensure the safety of flood control and flood discharge of the Gushan Reservoir.
Reservoir
1. Gray Mountain Reservoir. The Municipal Flood Control Headquarters is responsible for the operation and dispatch of the reservoir, and the Municipal Water Affairs Group is responsible for the daily maintenance and supervision of the reservoir. The Municipal Water Affairs Group shall establish a reservoir safety degree responsibility system with the main administrative leader as the management responsible person, the chief engineer as the technically responsible person, and the competent leader as the rescue responsibility person. It is necessary to inspect the inspection of the reservoir area and the condition of the reservoir facilities at any time, and utilize the existing reservoir. Propaganda board walls and other facilities to promote the importance of the reservoir to local villagers, improve the villagers' awareness of flood prevention and the protection of reservoir facilities, find problems in a timely manner, and promptly report back to the city's urban flood control headquarters. It is necessary to strengthen the water-slope and back-slope slopes of the reservoir, level the rain-drainage ditch, clean up the residual soil of the dam and clear the spillway. In the flood season, the water level of the Gushan Reservoir was controlled below 68 meters, and the main storage period of the Gushan Reservoir was empty. The Municipal Water Affairs Group shall formulate an emergency plan for the Gushan Reservoir before June 10 and report it to the Municipal Flood Control Headquarters for the record.
2. Zhueryu Reservoir. The Dadong District Flood Control Headquarters is responsible for the operation and dispatch of the Zhuerzhen Reservoir. It is necessary to put the management, technology and rescue personnel responsible for the reservoir in place. Overhaul and maintain the reservoir water supply tunnels, gates, dams and other facilities, pay close attention to changes in water level and water conditions to ensure fullness. Before June 10, the emergency plan for the reservoir will be worked out and reported to the municipal city flood control headquarters for the record.
The Municipal Construction Committee of the project under construction shall organize the construction units to implement the site flood control measures, strengthen the supervision and inspection of the construction site flood prevention work, and focus on the flood prevention work of key pits, slopes, tower cranes and scaffolding foundations to ensure the safety of the site. While ensuring the safety of its own construction, the MRT project must take measures to reduce the load on urban drainage facilities and strengthen inspections to ensure road safety along the MRT construction. In order to ensure that there is no water along the Golden Corridor, the Municipal Water Affairs Group shall, depending on the timely conditions of rain, propose to reduce the number of opening pumps of the various construction sites along the Golden Corridor until the precipitation is stopped, and the Municipal Construction Committee Jinlang Office shall coordinate the implementation. The Municipal Water Group shall speed up the construction progress of the Beiling Park Pumping Station and the Nanhu Park Gate Reconstruction Project to ensure that it will be completed and benefited before the main project.
The urban real estate department and the administrative law enforcement department shall conduct a comprehensive inspection of the dangerous buildings and illegal construction houses in the city. The problems found shall be rectified before the completion of the renovation. The illegal construction of the houses shall be dismantled as soon as possible, and the dangerous houses that cannot be repaired and reinforced temporarily shall be formulated. Good emergency plan, implement the hazard measures.
Fourth, the division of responsibility
1. The Municipal Urban Flood Control Headquarters Office is responsible for the daily work of urban flood control, coordinating the work of urban flood control, responsible for daily command and dispatch, supervision and inspection, and issuing early warning information in accordance with the prescribed procedures.
2. Under the unified leadership of the Municipal Flood Control Headquarters, according to the principle of territorial management, the district governments are fully responsible for the urban flood prevention work within their respective administrative regions, and they must be aware of the position, organize the implementation in place, implement the measures in place, and put the material reserves in place. . Each district in the seven districts of the city will implement 100 rescue vehicles and 10,000 straw bags, and set up a flood prevention and rescue team of no less than 1,000 people.
3. The Municipal Water Affairs Group and the urban management bureaus of each district are responsible for the cleaning and dredging of the drainage pipes, and organize the comprehensive clearing of the sediments and water-blocking materials of the drainage pipes before June 10 to ensure the smooth drainage of the drainage pipes; Points of water removal and rescue work; before July 10, comprehensively repair the pump station, gate facilities and emergency mobile equipment to ensure full and reliable operation, at any time to listen to the emergency command transfer of the city's urban flood control headquarters; The drainage departments of all districts should be fully employed. The leaders of the Water Group should take the full command of the urban flood control headquarters to speed up the pumping of rainwater, ensure the smooth drainage of the urban street, and the normal opening and closing of the gates of the sewage treatment plants; Overhaul and key parts of the fortification, implement the emergency repair team to ensure that the city's water supply is normal during the flood season.
4. The Municipal Real Estate Bureau is responsible for the overhaul and reinforcement of dangerous buildings and the rescue and escape work. Before July 20th, the house reinforcement and repair work will be completed. For the time being, it is impossible to repair and reinforce the hardship measures.
5. The City MRT Construction Headquarters is responsible for the rain protection and drainage work of the MRT construction site and the safety protection work of the construction site. Depending on the public opinion, stop or reduce the water discharge into the urban drainage pipe as much as possible, and reduce the load on the drainage facilities in the flood season. The patrol inspection at the MRT construction site shall be promptly handled and reported to the Municipal Urban Flood Control Headquarters if it is found that it may cause landslides, settlements, etc. that affect traffic safety.
6. The Municipal Meteorological Bureau is responsible for providing timely and accurate information on meteorological information to the urban flood control headquarters during the flood season.
7. The municipalities, telecommunications, gas companies and other departments and units are responsible for the maintenance of their own pipeline facilities and the fortification of key parts, and implement the rescue team to ensure that the power supply and gas supply in the flood season are normal and the communication is fault-free.
8. The Municipal Public Security Bureau is responsible for the social security order, assisting the city and district urban flood control headquarters to crack down on the lawless elements that damage the urban flood control facilities and hinder the normal operation of flood control; the city traffic police detachment is responsible for maintaining traffic order, and timely adopting traffic control on the water section. Measures to give priority to vehicles that perform flood control tasks, and to ensure that urban flood control vehicles and flood control vehicles are unimpeded.
9. The Municipal Construction Committee is responsible for the maintenance and management and coordination of the construction sites in the city and the construction projects under their construction and the unhandled drainage facilities to ensure safe operation during the flood season.
10. The Municipal Health Bureau is responsible for medical rescue work and possible epidemic situation and prevention and treatment of infectious diseases.
11. The municipal and district administrative law enforcement bureaus are responsible for coordinating with the city and district urban flood control headquarters to clean up and rectify illegal and illegal structures that affect urban flood control and drainage.
12. The Municipal Transportation Bureau is responsible for the implementation of 100 emergency rescue vehicles.
Each responsible unit shall report the implementation status and contact information to the Municipal Urban Defense Command for the record before June 10.
V. Guarantee measures
1. Strengthen the organization and lead the city to establish ###市城市防汛指挥部. The chief commander is served by Xing Kai, member of the Standing Committee of the Municipal Party Committee and deputy mayor. The deputy commander is the deputy secretary-general of the municipal government ###, the director of the Municipal Construction Committee Qin Wenjun, the director of the Municipal Urban Construction Bureau Yu Shenguang, ###警备区谋谋长###,市The chairman of the water affairs group ### served as the commander of the district heads of the district governments and the leaders of the relevant departments of the municipal government. The office under the headquarters is responsible for the daily work of urban flood control. The office is located in the Municipal Urban Construction Bureau. The director of the office is served by Zeng Qingyuan, deputy director of the Municipal Urban Construction Bureau. The member units are composed of the municipal governments, the city's MRT construction headquarters, the administrative law enforcement bureau, the urban construction bureau, the construction commission, the meteorological bureau, the public security bureau, the traffic police detachment, the transportation bureau, the health bureau, the water conservancy bureau, the civil air defense office, the real estate bureau, # ##铁路局,###警区,Electricity, telecommunications, gas, water group and other departments and units.
Each member unit shall form a corresponding anti-mite organization, and the main administrative leaders shall bear full responsibility. All enterprises, institutions, schools, military units and social organizations in the city shall, under the unified command of the flood control headquarters of the district, establish anti-mite organizations and do a good job in flood prevention. The Chinese People's Liberation Army is an important force in flood control and flood fighting, and participates in urban flood prevention and rescue work when necessary. Each member unit shall formulate a flood prevention work plan and a rescue emergency plan, and report it to the municipal flood control headquarters for record before June 10.
2. Fully implement the staff of the flood control headquarters at all levels must abide by the rules and regulations, adhere to the work position, timely understand and master the grievances and dangers, appear grievances and dangers, deal with them immediately, and report to the superior flood control headquarters in time. . All units and individuals in the urban area of the city must obey the flood control and rescue command of the city's urban flood control headquarters, and undertake the task of fighting floods and rescues. All regions and departments must establish a strict flood prevention responsibility system, so that leaders can be divided into tasks, and the responsibility should be implemented. People must strictly implement the duty and value system, and implement 24-hour duty in the flood season. The main leaders in the main flood season should bring their own classes and prevent the duty value. The staff should not be left behind, and the hand and mobile phones should be kept open for 24 hours. If problems are found, they should be resolved and reported in time.
3. Strict liability investigation The municipal and district flood control headquarters should strengthen the supervision and inspection of flood prevention work. The municipal flood control headquarters conduct regular and irregular flood control safety inspections during flood control, and focus on checking the implementation of flood prevention hazards and flood control duty. . Units and individuals that have serious consequences due to poor leadership, blocked political orders, neglect of duties, and improper disposal shall be investigated and dealt with at a minimum, and units and individuals who have made positive contributions to urban flood prevention work shall be commended.
recommended article
- Pastoral area promotes new rural medical cooperation work program
- County continues to emancipate the mind and discuss interactive activities
- County Administration for Industry and Commerce
- The Communist Youth League organized "two creations, two competitions and one construction"
- Wenhua College Campus Dance Competition Event Planning Book
- College student cocktail program
- 2019 National Art Festival Work Program
- School and surrounding public security comprehensive work plan
- Internal management assessment work plan
- "Promoting the spirit of the May Fourth Movement and building a harmonious campus"
- The research topic of "Grateful Education for Primary and Secondary School Students"
- "Speaking righteously, building a new style" theme education activities
popular articles
- 2019 technical guidance into the village work program
- Leading group rectification plan
- Strong words
- Summer Teacher Training Program
- Qq space mood phrase
- Deaf people jingle 2019
- Youth Talent Competition Event Planning Program
- Thanks to the friend's words 2019
- 2014 is very touching words
- College entrance examination inspirational quotes
- Sad love sentence 2019
- Injured sentence
- Classical life motto
- Korean swear words
- Underlying grassroots research work plan
- I want to say something to the teacher.
- Describe the fast time sentence 2019
- Financing cooperation meeting plan
- National Primary School Safety Emergency Plan
- a good saying that loves labor
- Tao Xingzhi's famous sayings
- Implementation of hospital administrative efficiency monitoring in 2019
- Taizai’s famous sayings
- Du Yuexi's famous sayings
- Teacher's famous saying
- Bing Xin’s famous words
- English famous words
- The latest high school inspirational maxim
- Intangible Cultural Heritage Protection Program
- Civilized units create work plans