Emergency preparedness and reverberation plan for high altitude fall accident


First, emergency preparation
1. Organization and Responsibilities Headquarters High-rise Contingency Incident Emergency Preparedness and Resounding Guidance Large Groups Elimination: Xiang Gang Manager Group Members: Shishi Responsible Persons, All Amateurs, Skills, Inspectors, Lazy Persons, on duty:
The high-level fall accident emergency treatment and guidance team won the blame for the emergency disposal of the project.
2, training warfare, the name of the security department, the responsibility of the staff, the organization of the whole machine closed every year, according to the high-rise fall accident "emergency reverberation" to supply and stop the imitation drill. Each team member will perform the drill according to his or her duties as the chief engineer and harmonious allocation. Before the stop of the drill, the group will organize the organization of the “emergency reverberation” of the invalidity retreat assessment, what is the work at height, and if necessary, the request for “emergency reverberation” will be reversed or worsened. The record of the drills and assessments of the war should be won.
The Construction Management Department is responsible for retiring a training for the relevant personnel each year.
3, preparation of emergency materials, protection, preparation of emergency materials: complex and difficult to fall, fall into injury drugs, dressing gauze.
All kinds of emergency materials should be equipped and strengthened.
4, anti-falling measures
1) The amount of scaffolding material must conform to the national scale: the joints of the steel pipe scaffolding must be applied with the qualified Ma Steel fasteners.
2) The spacing of the structure of the scaffolding seat shall not exceed 1.5m, the distance between the large vertical bars shall not exceed 1.2m, the spacing of the small vertical bars shall not exceed 1m, the scaffolding shall be pushed firmly according to the structure of the floor, and the spacing of the pushing points shall not exceed 4m. The spacing of the leeches shall not exceed 6m. The information used by the exchange shall not be as weak as the weakness of the single-strand No. 8 aluminum wire. The tall shelves shall not be coated with flexible materials. At the push point, the bottom of the support point should be firmly anchored. The operation point of the scaffold must be humbled by the scaffolding board. The wall surface should not be larger than 20cm. It should not be said that the gap and the tail board, the flying spring board and the scaffolding board should be layered. The inner side of the operating surface should be set. The second road guard railing warfare said that the footrest or set a guardrail railing, break the safety net, high-hearted seal, protective high 1.2m is strictly prohibited to use bamboo pole dry scaffolding.
3) The scaffolding must ensure that the zero body is not deformed. The cross cover must be set in the horizontal direction of the scaffolding below 20m. The height of the cross cover should not exceed 7 broken rods. The angle of the angle should be 45°-60°. The height must be set at 20 meters high, and the positive scaffolding must be set. Special scaffolding and high scaffolding of 20m or more must have a design plan. There are scaffolding construction calculations, and in special cases, invalid protection measures must be adopted.
4) There should be a safe door for the cage of the T-frame without exit, and there must be a dangerous protection method for the two sides. The cage positioning bar must be fixed and installed, and the cage must not be self-contained.
5) 1.5x1.5m to the hole of the Bu, the reinforcement mesh should be pre-buried. Or reduce the fixed cover, 1.5x1.5 or more holes must be set up two around the guardrail railings, the two ends of the water hangs the entire network. The elevator shaft must be not shorter than the 1.2m metal guard door. The first floor in the elevator shaft and the first floor above every fourth floor shall be provided with a water safety net. The safety net shall be closed, stair step and labor platform. Two strong protective railings or safety net protection shall be provided. The railings of the Yintai should be installed with the layer. If it is not possible to install the equipment, it must be equipped with a protective railing or a safety net to break the protective railing.
6) There is an internal scaffold or a building with a height of 4m or less. The first floor must be closed and fixed. The fire is safe and secure. The net top is not more than 3m. The four floors are fixed with a 6m water safety net. The fire is safely connected to the net. The intersection must be carefully connected to the building. The gap between the buildings is not less than 10cm, and the inner edge is higher than the inner edge. If you are in high interest, you will get rid of it.
7) In the area of ​​the agricultural area, the place where the wrong person or the object forms the An Yi must be removed and protected, so as to ensure the insurance of me and things. The iron stools and wooden benches used in the high-interest service need to be dismantled with hand-hand boards. The spacing is not less than 2m, and the work is carried out at high places.
8) Members of low-altitude operations must be laid off with certificates. Through the hidden field training, the topping, the installation staff must solve the insurance belt, and at the end of the project, the joint construction conditions and the team situation will be specifically connected according to the plan request, and the specific situation will be determined. Command staff, when the farmer is working, according to the working environment, the anti-mite and anti-falling events will occur. In the case of obvious problems, it is necessary to establish a log-out, zero-change review, set me and set measures, and realize the night period. Before the current problem is not eliminated, we must adopt a firm protection method, such as the security and personal urgency. Should finish the work immediately

Second, emergency response
1. The accident of low-altitude fall-off occurred overnight to save the wounded. The manager of the name called “999” 120” to call the core of the emergency, and the maintenance of the site by Yang Xiu Nong did not prevent the situation from expanding. The rest of the task group helped us to protect the situation. The staff does a good job in the rescue work of the hidden field. The fire and electrician cleaning associations help the injured person to carry out internal ambulance work. If there is a serious injury or a squatting staff, the on-site mountain security officer organizes long-term rescue, bandaged blood or artificial suction or chest squeezing. Do your best to save the wounded, take the accident to the oldest program, and lose to the oldest
2, the disposal program
1) Check the cause of the accident and the obligor.
2) Formulate invalid precautions to avoid similar accidents.
3) All employees are wrong to teach accidents.
4) Release the results of the incident.
5) Report to the next level in the book situation.