Enterprise flood prevention emergency plan
In order to ensure the normal production, work order and safety of life and property, the company's various facilities are safe in the summer.
First, the flood prevention leading group:
Team leader: xx
Deputy leader: xx
Member: xx
Rescue team: All personnel of the company have the responsibility to participate in flood fighting and rescue and protect the company's property safety.
Second, the anti-mite organization program
When the danger occurs, the company office is responsible for on-site command, and the heads of various departments and Chinese and Western medicine workshops actively deploy the personnel of the department to cooperate with the rescue. Dangerous situation
When they are born at night or on a rest day, the duty officer is temporarily responsible for the command and promptly informs other members of the flood prevention team to rush to the scene.
Third, the flood prevention measures of the Ministry of Engineering
1. Anti-mite equipment is placed on the gate, and anti-mite equipment is placed, mainly including woven bags, sand, iron shovel, etc.;
2. The company's key parts: the door of all the company's factories.
3. Dangerous situation: the company's doorway is not flowing inward. The drainage pipe is blocked and the water level in the plant rises.
4. Before the arrival of the flood season, office personnel should carefully inspect the key parts of the whole plant.
Whether the drainage channel on the roof of the building is unobstructed, and the garbage on the roof is cleaned and cleaned;
Check the sewage wells and drain pipes for any deposits and remove them to ensure smooth drainage;
Check the important equipment room such as the power distribution room for leaks. If it happens, it should be dealt with in time.
Fourth, the danger handler
1. If there is a danger in the factory, it is necessary to quickly block the door of the key parts with sandbags to protect the company's property.
2. After the dangerous situation occurs, it is necessary to carry out a comprehensive inspection, to calculate the losses caused by the public opinion and the consumption of materials, and to timely supplement the anti-mite materials and prepare for the next flood prevention;
3. The event processing process should be recorded in detail, and the office will report to the company's leaders and higher authorities.
recommended article
- 2019 exam for safety test
- Travel agency security accident emergency plan
- Emergency plan for handling mass incidents
- Flood control and emergency prevention and rescue plan
- Emergency plan for sudden problems at the entrance of the National Primary School
- Secondary school emergency evacuation drill plan
- Emergency plan for electrical fire accidents in power supply stations
- Enterprise flood prevention emergency plan
- Emergency plan for the 2019 earthquake
- Middle school stairs entry and exit evacuation plan
- Emergency plan for construction safety accidents
- School emergency evacuation drill plan
popular articles
- Bing Xin’s famous words
- Street Community Flood Control Emergency Plan in 2019
- Taizai’s famous sayings
- Injured sentence
- School flood prevention emergency plan
- Du Yuexi's famous sayings
- Fire emergency plan
- Thanks to the friend's words 2019
- Tao Xingzhi's famous sayings
- College entrance examination inspirational quotes
- Korean swear words
- Qq space mood phrase
- I want to say something to the teacher.
- The latest high school inspirational maxim
- 2014 is very touching words
- Emergency plan for small infectious diseases in experimental countries
- English famous words
- Strong words
- National Small Prevention Flood Prevention Emergency Plan
- Radiation accident emergency treatment plan
- Describe the fast time sentence 2019
- Sad love sentence 2019
- Kindergarten fire emergency plan
- Kindergarten fire safety emergency evacuation drill plan
- Deaf people jingle 2019
- National Small Security Evacuation Program
- a good saying that loves labor
- Teacher's famous saying
- Classical life motto
- Kindergarten earthquake emergency plan