Secretarial knowledge > Emergency plan

Fire emergency plan


1. purpose

Control the occurrence and spread of fires to ensure the safety of employees' personal and property.

2. range

Applicable to the emergency management and control of the headquarters of the company, the manufacturing site/project department.

3. Duties

3.1 The Administration Department is responsible for the overall planning, organization and implementation of the company-wide contingency plan.

3.2 The volunteers of the company's headquarters, manufacturing department and project department are the main executors of the contingency plan.

3.3 All departments and on-site construction and installation departments of the company shall implement and implement various emergency plans in accordance with the requirements of the company.

4. Program content requirements

4.1 Fire contingency plan

4.1.1 The company's production and manufacturing department project department and other departments should set the "deletion" according to the configured fire equipment.

Distribution of anti-facility and fire-fighting equipment is posted and noticed.

4. 1.2 In the event of fire hazard, fire emergency response team personnel enter their respective positions and organize fire alarms, fire fighting, evacuation personnel, and rescue of materials.

4.1.3 After the fire is extinguished, personnel should be guarded to prevent re-ignition of the after-fire.

4.1.4 If the fire risk cannot be extinguished by its own strength, the Fire Protection Regulations shall be implemented to request the foreign aid force.

4.1.5 After the fire is extinguished, the situation should be reported in writing.

4.2 Anti-typhoon program

4.2.1 To ensure the personal safety of the goods, equipment and personnel of the company's office, manufacturing and construction sites, the spirit of the program is to adhere to normal production and operation and to prepare for the prevention of typhoon.

4.2.2 Preparations for the prevention of various departments and construction sites:

4.2.2.1 Listen to the meteorological forecast of the meteorological observatory on time, master the typhoon information, and prepare the anti-Taiwan anti-Taiwan at any time.

4.2.2.2 The storage situation of the reservoir should be considered, including the variety of goods, the quantity and the owner of the goods, and the list should be submitted to the anti-Taiwan headquarters to mobilize and organize the materials and materials, especially the wet goods should be immediately taken.

4.2.2.3 Do a good job in the safety transfer plan of the mobile machinery, and do the work preparation and manpower for the reinforcement, packing and disassembly of the motor parts of the construction site and other fixed machinery and lifting towers.

4.2.2.4 Supervise the electric house and comprehensively inspect the overhead and underground transmission lines of the site,

If there is any unsafe condition, it should be properly disposed of immediately to prevent electric leakage and injury.

4.2.2.5 Ensure that the generator set is in good condition, and the mechanical and electrical personnel will be on duty. Once the power is cut off, it can still be supplied normally.

4.2.2.6 Strengthen telephone listening, communication tools are strictly prohibited to shut down, to ensure smooth, timely and accurate communication.

4.2.2.7 All units should ensure the logistical supply during the typhoon prevention. Such as food, non-staple food, spare pool should have a certain amount of reserves.

4.2.2.8 For each construction site and warehouse, it is necessary to carry out the work of preventing the waterproofing and sealing of the platform, whether the roof, doors and windows and drainage are normal. If there is any leak, it should be filled or repaired immediately.

4.2.2.9 All personnel of the company must adhere to their posts, obey orders, go all out to rescue and rescue disasters, and reduce losses to a minimum.

4.3 Anti-smashing, rainproof and wet

4.3.1 The materials under the jurisdiction of the company's various departments shall be protected from losses during the flood season and the rainy season.

4.3.2 Before the rainy season and the rainy season, all units should conduct a serious and thorough inspection of the drainage system within the jurisdiction. If defects are found, they should be repaired and replaced immediately to ensure smooth and unimpeded systems during the flood season and rainy season.

4.3.3 Before the onset of the rainy season, the tarpaulins and ropes covered by the open-air stacking materials shall be inspected in a comprehensive manner, repaired in time, and the number of defects shall be reported in time for purchase.

4.3.4 During the flood season and rainy season, it is necessary to strengthen the inspection of open-air materials and take effective measures to ensure that the piled materials are safe and sound. If they are immersed and wet, they should be reported step by step. The figures should be accurate and detailed, and should not be falsely reported or concealed.

4.3.5 After the flood season and the end of the rainy season, all grassroots units must carefully write a summary and report to the company.

4.3.6 Managers should stick to their posts and do their job well. If losses are caused by dereliction of duty, they will be punished according to the seriousness of the circumstances.

4.4 Emergency plan for leakage of toxic substances

4.4.1. When the chemical solvents such as oil, paint, and water that are harmful to the human body are in danger of jeopardizing the life safety of the human body, the responsible department shall take effective measures to ensure that the damage is minimized.

4.4.2 At the construction site or production site where leakage occurs, the person in charge of construction or the head of the department shall immediately take partial or complete shutdown according to the scope of the leakage.

4.4.3 The person in charge of construction or the head of the department shall organize personnel to take measures to block the source of leakage.

4.4.4 Immediately perform evacuation, isolation and rescue work.

4.4.5 If the leak is not controlled, immediately notify the local fire and environmental protection department to come to the rescue.

4.4.6 If there are symptoms of poisoning on the spot, the local hospital should be notified immediately and the rescue should be organized.

4.4.7 After properly solving the leakage problem, the responsible person of the relevant department should write an experience report, propose improvement and preventive measures, and prevent the same accident from happening again.

4.5 Emergency plan for production and construction injury accidents

4.5.1 All departments of the company shall take measures to avoid the occurrence of various injuries to the human body such as mechanical damage, object striking, collapse of buildings, falling of high places, etc. during the manufacturing process, and protect the personal safety of employees.

4.5.2 This plan shall take effect immediately in the event of a serious production and construction injury. The on-site team leader or arranger will notify the administrative department and call the emergency center's telephone number 120 or local medical institution to apply for assistance from outside government agencies.

4.5.3 At the same time, the team leader should take first-aid measures: such as hemostasis and respiratory arrest, artificial resuscitation activities such as artificial respiration and extrathoracic heart massage should be performed. If mechanical injury should stop mechanical operation immediately, other injury accidents should also stop the construction of the injury source. Activity activity.

4.5.4 The team leader organizes personnel to transfer the injured to a safe place when the ambulance personnel have not arrived. When transferring, prevent bumps and smooth transportation to ensure the safety of the wounded.

4.5.5 If an accident such as a collapse of a building may continue to cause more casualties, the site personnel shall be organized immediately.

Evacuation reduces the risk of casualties to a minimum.

4.5.6 After the accident has been effectively controlled, the administrative department shall immediately organize personnel to handle the aftermath and accident investigation and analysis.

Lessons learned.

4.5.7 The administrative department shall immediately report to the government administrative supervision department according to the severity of the accident at the time of the accident.

4.6 Emergency plan for food poisoning

4.6.1 In the event of an emergency of food poisoning, the company will immediately start this plan.

4.6.2 When symptoms of poisoning occur, organize personnel to call 120 first aid and local hospital calls.

4.6.3 The administrative department should immediately cooperate with the department head of the poisoning department to find out the relevant situation of the poisoned personnel, such as the number of people, the type of work, the source of poisoning, the location of the poisoning, the time, etc., in order to provide reliable information for the accurate diagnosis of medical personnel.

4.6.4 The Administration Department shall send personnel to assist the employees of the poisoning department to take necessary measures to isolate toxic foods and prevent misuse.

4.6.5 If there are many poisoning personnel, the construction schedule should be adjusted reasonably so as not to affect the construction period and project quality.

4.6.6 Exclusion of poisoning caused by other causes other than poisoning, the poisoning department should sum up the lessons and strengthen protective measures for weak links.

4.7 Electric shock emergency plan

4.7.1 The company's functional departments or personnel should immediately start this program in the event of an electric shock.

4.7.2 The site where electric shock occurs should be cut off immediately.

4.7.3 On-site dispatcher informs the contact person to call the emergency center telephone 120.

4.7.4 Before the arrival of the ambulance personnel, rescue measures will be organized on site. Immediately dispatched the staff to lift the electric shocked staff to a stable and ventilated place, and observe the casualty's breathing, heartbeat, etc., and take artificial respiration immediately.

4.8 Emergency plan for electrical failure

4.8.1 All production and on-site construction and installation departments of the company should properly handle the emergency handling of safety accidents. In the event of a sudden electrical failure, emergency work can be carried out in an efficient and orderly manner to minimize accidents.

4.8.2 Establish an electrical fault emergency response command team and a structure for troubleshooting and rescue personnel. The project production department and the on-site construction site project manager are the command team leader. The team members include safety personnel and on-site construction workers. The troubleshooting personnel are composed of electricians and mechanics. The rescue personnel are composed of compulsory fire brigade and medical staff.

4.8.3 Relevant technical training and exercises for emergency handling of corresponding personnel for electrical faults to ensure correct, efficient and rapid electrical troubleshooting and emergency rescue.

4.8.4 Eliminate electrical faults, emergency rescue

4.8.5 Take effective measures quickly to eliminate electrical faults, organize rescue, and prevent accidents from expanding. When a major electrical accident occurs and the emergency is out of control, it should immediately report it to the construction department and the emergency treatment command leading group office of the municipal bureau, and call the “120” and other emergency numbers.

4.8.6 Under the leadership of the command team, the volunteer firefighters are responsible for evacuating unrelated personnel and eliminating road faults.

Fire off the scene and prevent accidents such as falling of equipment and collapse of objects.

4.8.7 Strictly protect the scene of the accident, and make signs or photographs and detailed records.

4.8.8 After-the-fact work on related matters

4.8.9 Write an incident report within 24 hours.

4.8.10 Analyze and summarize the causes of electrical faults, carefully learn lessons, and timely rectify and prevent the recurrence of similar accidents.

4.8.11 Continuously improve and enrich the plan to achieve correctness and applicability in the implementation process

4.9 Gas leakage emergency plan

4.9.1 In the manufacturing and production halls, the kitchen staff should always pay attention to the rust and damage of the valves, welding joints, etc. of the gas tanks for production or meals, and prevent leakage.

4.9.2 Leakage treatment: When the valve fails, the first witness should quickly close the gas tank, open the door and window, first block the leak with wet towel, soap, yellow mud, etc., then transfer the cylinder to the outdoor , vent the remaining gas, remember to put an end to all sources of fire.

4.9.3 No ignition of nearby combustibles: The first witness should quickly close the gas tank, open the doors and windows, and quickly cover the cylinder guardrail with soaked towels, rags, etc. to prevent hand burns and close the angle valve.

4.9.4 Ignite nearby combustibles: While saving the surrounding flame, extinguish the cylinder fire, cut off the gas source, and simultaneously cool the cylinder with water and transfer it to a safe place.

4.9.5 Note: When the cylinder is standing and burning, there is generally no explosion and it can be quickly saved. If the cylinder is poured on the ground or the pressure relief valve is burning towards the ground, do not blindly approach it. The cover can be used to cool the cylinder to prevent explosion and wait for the firefighters to come.

4.9.6 When there is an emergency or abnormal situation, the first witness must quickly report the person in charge of the scene, the person

To be the first commander in the handling of accidents, organize personnel to go all out to implement control and rescue operations, and do everything possible to prevent the situation from expanding. In the event of a fire, follow the Fire Response Plan.

4.9.7 If there is a large amount of leakage in the gas pressure vessel and pipeline, the main power source and fire source should be cut off in the first time, and the leakage source should be cut off as much as possible, and the personnel should be quickly covered with a wet towel to cover the mouth and nose and evacuate the accident site. .

5. Related files

Fire Management Regulations

6. Relevant records

"Fire Equipment and Fire Equipment Distribution Table"

"Fire propaganda materials"