Fan Wen Daquan > Contract Model > Construction Engineering Contract Model

Construction contract


1. Format construction contract

Party A: ×××
Party B: ×××

In accordance with the principles stipulated in the Economic Contract Law of the People's Republic of China and the Regulations on Contracts for Construction Contracts, both parties have reached the following agreement in light of the actual conditions of the project.

The first contracting project overview

The language, standards and applicable laws used in the second contract file

Third drawing

Article 4 Representatives of both parties to the site

Article 5 Basic work of both parties

Article 6 Project Progress Plan

Article 7 Engineering Supervision

Article 8 Personnel price and its adjustment

Article 9 Payment method and time of project advance payment and engineering price

Article 10 Project Acceptance

Article 11 Final Account

Article 12 Warranty

Article 13 Dispute Resolution

Article 14 Liability for breach of contract

Article 15 Other contents agreed by the parties

Article 16 This contract is a __ share, each party holds __ copies. This contract is effective as of the date of __year__month__. In the absence of this contract, the parties may negotiate to enter into a supplementary agreement. The Supplementary Agreement has the same effect as this Agreement.

┌────────────┬────────────┬──────────┐
│ │ ││
│ 发包方│ Contractor │ Forensic opinion │
│Unit Name: │Unit Name: ││
│Unit Address: │Unit Address: │Manager: │
│ Legal representative: │ Legal representative: │ Forensic authority │
│Authorized Agent: │Authorized Agent: │ │
│Phone: │Phone: │年月日日│
│ Telegraph registration: │ Telegraph registration: │ [Note: Unless otherwise specified by the state │
│ bank account: │ bank account: │ outside, the confirmation confirmed the line from │
│ Account: │ Account: │ Will Principles │
│Postal code: │Postal code: ││
│年月月日│年月日日││
└────────────┴────────────┴──────────┘

2. Description

The construction project contract is a contract that is based on the construction project, including the construction contract, the architectural survey contract, and the architectural design contract. Construction contracting is a very complicated contract. It involves engineering technical standards, quality supervision and inspection, construction deadlines, etc., and there are many laws and regulations involved. Therefore, the establishment of construction contracting contracts should make specific provisions according to different situations, and strive to be accurate, clear and correct to ensure the smooth progress of the project. In particular, the technical terms and meanings of different projects are often different. Therefore, it is more necessary to specify the legal and technical standards and their meanings that should be applied when entering into a contract. In general, the following three aspects of the problem should be noted:

As a contractor, we must first understand the basic conditions of the project, including the drawings provided by the contractor, the amount of work, the difficulty of the project, the requirements of the construction period, and the construction strength that needs to be achieved. If the construction strength of the contractor is not suitable for the project, it should be stated, otherwise, it should bear the corresponding responsibility.

As the contractor, the contractor’s qualification level should be reviewed and whether there is any power to contract the project. Whether or not the contractor is allowed to subcontract should be stated in the contract in advance.

The Employer shall strengthen the supervision and inspection of the quality of the project. The mode, time and project content of the supervision shall be clearly defined in the contract; appropriate arrangements shall be made for the part requiring intermediate acceptance.

recommended article