Civil construction project tender
Civil construction project tender 1
Note: 1 This tender is prepared by the International Federation of Consulting Engineers in conjunction with the International Federation of Building and Public Civil Engineering.
To: ____
Gentlemen:
After studying the drawings, contract conditions, specifications and construction works list of the above designated construction, we as the signatory are willing to follow the above drawings, contract conditions, instructions and construction project list, according to the amount of ____, or any of the above conditions Other amounts, undertake the construction, construction and maintenance of the above-mentioned entire project.
2. We guarantee that if our bid is accepted, the construction will begin within ____ days after receiving the engineer's start order, and will be completed and delivered within ____ days from the last day of the project start-up period. The entire project specified in this contract.
3. If our bid is accepted, we will obtain a guarantee from an insurance company or bank or provide two suitable and honest guarantors if necessary. We will be jointly and severally liable with us, and we will not exceed the above specified amount. 10% of the amount, according to the conditions of the guarantee that you are required to approve, the guarantee is performed according to the contract.
4. We agree to abide by this tender within ____ days from the date of receipt of the required bid, and this tender will always be binding on us and will be accepted at any time prior to the expiration of this period.
5. Until a formal agreement is drawn up and signed, this tender, together with your written acceptance of it, will become a binding contract between us.
6. We understand that you are not obligated to accept the lowest price or any other bid you have received.
____ year ____ month ____ day sign
Signature ____ is officially authorized by ____ qualification and signed on behalf of ____
Witness ____ address ____
address____
Career ____
Appendix 1
The amount of the policy ____ pounds
Minimum amount of third party insurance ____ pounds
Start-up period ____ days
Completion time ____ days
The prescribed default payment ____ ____ sterling per day
Award amount ______
Maintenance period ____ days
Percentage of adjustment to direct cost amount ____ percent ____
Percentage of retention ____ percent ____
Reserve limit of ____ pounds
Mid-term certificate minimum amount ____ pound
Payment period after issuing the certificate ____ days
According to this file, we, the parties and the guarantor, are obligated to pay the above-mentioned guarantee penalty, and we, our heirs, the executor, the administrator, and the successor are jointly and severally liable; however, In the case where the guarantor is a number of companies, as joint guarantors, these guarantors are “respectively” and “respectively” responsible for the above-mentioned fines, only to allow for joint prosecution or prosecution of any or all of us. For all other purposes, each guarantor is jointly and severally liable with the party for the penalty for the inclusion of the guarantor in the name of the guarantor. However, if the limitation of liability is not specified, the limit of liability shall be the entire amount of the fine. . The condition of this obligation is that, in view of the parties’ signing of the contract specified above;
Perform and complete all commitments, agreed matters, terms and conditions specified in the above contract during the period of validity of the contract, and any extension period that the government may agree to and during the period of validity of any guarantee required under the contract. And the agreement, and also fulfills and completes all commitments, agreed matters, terms, conditions and agreements as may be specified in any and all officially approved amendments that may be made in the foregoing contract, and the guarantor wishes to waive this Revised notices and rights; and
The government shall pay the entire amount of the government-defined tax levied, deducted or withheld from the wages paid by the parties in the construction contract for which the guarantee is provided by the guarantee: the above-mentioned obligation shall be invalid.
The parties and the guarantor have signed and sealed this certificate on the above date to prove it.
Note: 1 Appendix is an integral part of the bid. Bidders should fill in all the blanks in this proposal and the appendix.
2 Fill in the name of the borrower here__ It may not be appropriate to refer to the borrower as the government.
Note: 1 This tender is prepared by the International Federation of Consulting Engineers in conjunction with the International Federation of Building and Public Civil Engineering.
To: ____
Gentlemen:
After studying the drawings, contract conditions, specifications and construction works list of the above designated construction, we as the signatory are willing to follow the above drawings, contract conditions, instructions and construction project list, according to the amount of ____, or any of the above conditions Other amounts, undertake the construction, construction and maintenance of the above-mentioned entire project.
2. We guarantee that if our bid is accepted, the construction will begin within ____ days after receiving the engineer's start order, and will be completed and delivered within ____ days from the last day of the project start-up period. The entire project specified in this contract.
3. If our bid is accepted, we will obtain a guarantee from an insurance company or bank or provide two suitable and honest guarantors if necessary. We will be jointly and severally liable with us, and we will not exceed the above specified amount. 10% of the amount, according to the conditions of the guarantee that you are required to approve, the guarantee is performed according to the contract.
4. We agree to abide by this tender within ____ days from the date of receipt of the required bid, and this tender will always be binding on us and will be accepted at any time prior to the expiration of this period.
5. Until a formal agreement is drawn up and signed, this tender, together with your written acceptance of it, will become a binding contract between us.
6. We understand that you are not obligated to accept the lowest price or any other bid you have received.
____ year ____ month ____ day sign
Signature ____ is officially authorized by ____ qualification and signed on behalf of ____
Witness ____ address ____
address____
Career ____
Appendix 1
The amount of the policy ____ pounds
Minimum amount of third party insurance ____ pounds
Start-up period ____ days
Completion time ____ days
The prescribed default payment ____ ____ sterling per day
Award amount ______
Maintenance period ____ days
Percentage of adjustment to direct cost amount ____ percent ____
Percentage of retention ____ percent ____
Reserve limit of ____ pounds
Mid-term certificate minimum amount ____ pound
Payment period after issuing the certificate ____ days
According to this file, we, the parties and the guarantor, are obligated to pay the above-mentioned guarantee penalty, and we, our heirs, the executor, the administrator, and the successor are jointly and severally liable; however, In the case where the guarantor is a number of companies, as joint guarantors, these guarantors are “respectively” and “respectively” responsible for the above-mentioned fines, only to allow for joint prosecution or prosecution of any or all of us. For all other purposes, each guarantor is jointly and severally liable with the party for the penalty for the inclusion of the guarantor in the name of the guarantor. However, if the limitation of liability is not specified, the limit of liability shall be the entire amount of the fine. . The condition of this obligation is that, in view of the parties’ signing of the contract specified above;
Perform and complete all commitments, agreed matters, terms and conditions specified in the above contract during the period of validity of the contract, and any extension period that the government may agree to and during the period of validity of any guarantee required under the contract. And the agreement, and also fulfills and completes all commitments, agreed matters, terms, conditions and agreements as may be specified in any and all officially approved amendments that may be made in the foregoing contract, and the guarantor wishes to waive this Revised notices and rights; and
The government shall pay the entire amount of the government-defined tax levied, deducted or withheld from the wages paid by the parties in the construction contract for which the guarantee is provided by the guarantee: the above-mentioned obligation shall be invalid.
The parties and the guarantor have signed and sealed this certificate on the above date to prove it.
Note: 1 Appendix is an integral part of the bid. Bidders should fill in all the blanks in this proposal and the appendix.
2 Fill in the name of the borrower here__ It may not be appropriate to refer to the borrower as the government.
recommended article
- Demonstration text of construction project contract (2)
- Qingdao Construction Project Construction Contract
- Shanghai Participatory Housing Agreement
- Urban residential area owner management committee charter
- Construction Engineering Design Contract (3)
- Demonstration text of commercial housing contract
- Shanghai housing rental (commercial housing pre-leasing)
- Room decoration commission
- Construction project demolition house contract
- Engineering construction supervision commission
- Shanghai Housing Sublease Contract Sample
- Construction engineering technical consulting contract
popular articles
- Space mood phrase
- Encourage words 2019
- 2014 motivational phrase
- Blessing phrase
- Distressed sentence 2019
- Grateful mother's words
- Spring Festival blessing
- Weibo's famous sayings
- What I said to my father 2019
- Contract conditions for construction of water conservancy and hydropower civil engineering
- Construction project entrusted supervision contract (Chinese and English)
- Relieved words
- Construction engineering survey contract
- Life motto
- Construction project demolition house contract (official model
- Temporary wall construction agreement
- Motivate employees
- Respect the teacher's famous words
- Ministry of Construction, State Administration for Industry and Commerce
- Construction project construction contract (general)
- Hyun dance family impression sentence
- Real estate mortgage loan contract
- Not afraid of failure
- Team construction contract (construction team)
- Legal maxim
- Good sentence excerpt 2019
- Non-mainstream sentence 2019
- Parental love
- Philosophical words 2019
- Qingdao Construction Project Construction Contract