Construction Engineering Design Contract (1)
Construction engineering design contract
Enter into the contract:
Construction unit: ____, hereinafter referred to as Party A;
Design unit: ____, hereinafter referred to as Party B.
In order to clarify the responsibilities, work together and work together to complete the design tasks of the national construction project, according to the provisions of the “Construction Engineering Design Contract Regulations” and the __ approved project task book, the contract is signed by the two parties for full compliance. .
The first project name, scale, investment amount, construction site
Party A entrusts Party B to undertake the design project of ____ project. The construction and installation area is ____ square meters, the total investment approved is ____ million yuan, and the construction site is ____.
Article 2 Party A’s obligations
1. Party A shall submit to Party B the design task book approved by the escalation report, the project site selection report, and the agreement documents of raw materials, fuel, water, electricity, transportation, etc., before the __year __月__ day, and shall meet the preliminary design requirements. Survey data, technical data that needs to be obtained through scientific research. Party A shall provide approved preliminary design files and survey data that meet the construction drawing design requirements, construction conditions, and technical information about the equipment before the construction drawing of the __Year__月__日.
Party A must guarantee the quality of the above information and must not change it at will.
2. Promptly handle the design file approval work at each design stage.
3. Before the commencement of the project, Party A shall organize the relevant construction unit, and Party B shall carry out the design and technical disclosure; after the completion of the project, Party A shall notify Party B to participate in the completion acceptance.
4. When the designer enters the construction site to carry out the work, Party A shall provide the necessary working conditions and facilitate it in life. During the design and construction process, the test shall be carried out due to technical special needs, all expenses required and coordination with Party A. Party A is responsible for travel expenses to other places.
5. Party A must maintain Party B's design files and may not modify them without authorization. Party A shall not copy, reuse or arbitrarily expand the scope of construction without the consent of Party B. Party A is obliged to protect Party B's design copyright and may not transfer it to a third party for reuse.
Article 3 Obligation of Party B
1. Party B must deliver the preliminary design file to Party A before __Year__月__日; deliver the technical design file to Party A before __年__月__日; deliver the construction to Party A before __年__月__日Graphic design file. Among them, the preliminary design file is __ share, the technical design file is __ share, the construction drawing design file is __ share, and the other party needs to add the number of files and the model fee, and the fee will be charged separately. Before __year__month__ day, Party B must submit all design files to Party A.
. )
2. Party B must submit the survey technical requirements and design according to the approved design task book or the approval file of the previous stage design, as well as the design technical and economic agreement files, design standards, technical specifications, procedures, quotas, etc., and submit the quality-compliant design files.
3. After the preliminary design has been reviewed by the higher authorities, Party B shall be responsible for the necessary modifications within the scope of the original mission statement.
4. The design unit shall cooperate with the construction project to undertake the design task, carry out the technical pre-construction technical disclosure, solve the relevant design problems in the construction, be responsible for design change and revision budget, participate in concealed project acceptance and project completion acceptance.
Article 4 Modification and suspension of design
1. Party A shall request the modification of the design of the project for any reason. With the consent of Party B, Party A shall, in addition to the delivery time of the design file, be revised according to the actual rework date of Party B, and increase the design fee by __ yuan per working day, or according to the design stage. The percentage of work in rework is calculated.
2. If the original task book is reworked or modified if there is a major change, it must have a submission from the design approval authority or the design task approval authority. The payment of the design cost that has already been carried out is calculated according to the preceding article.
3. If Party A requests to stop design in the middle of the reason, Party B shall promptly notify Party B in writing that the design fee has not been refunded, and the design fee shall be increased and paid according to the actual labor hours at that stage, and the contractual relationship shall be terminated.
Article 5 Number of Design Fees and Delivery Method
Within __ days after the design contract is effective, Party A shall deliver a deposit equal to 20% of the design fee to Party B. After the design contract is fulfilled, the deposit shall be used as the design fee; B shall submit the preliminary design plan to Party A within __ days. Party shall pay Party B a design fee of __%; Party B shall settle all design fees to Party B within __ days after Party A submits the construction drawing file.
Article 6 Reward and Breach of Contract
1. Within the reasonable project investment control number, because Party B uses advanced technology or reasonable advice to save engineering investment, it can withdraw __% from Party B to save the investment amount.
2. Since Party A cannot provide the relevant design information on time and accurately, which may result in Party B's inability to design or cause design rework, Party B shall, in addition to the date of delivery of the design file, be subject to Party A's actual loss of working days, with daily __yuan Calculate the incremental design fee.
3. Party A shall not pay the deposit and design fee to Party B in accordance with the time stipulated in the contract, and shall pay Party B the liquidated damages according to the bank's provisions on deferred payment.
4. Due to Party B's reasons, delay in the delivery of the design file, Party B shall pay Party A a penalty of __% of the design fee for each delay of __ days.
5. Due to the poor quality of the design of Party B, it is necessary for Party B to continue to improve the design tasks, and to reduce the amount of waste caused by the loss or the design fee. For those who have caused major quality accidents due to design errors of Party B, Party B shall not only pay the design fee for the loss part, but also pay compensation equal to the design fee directly affected by the loss.
Article 7 Other
_________________________________.
This contract shall become effective after the signature of both parties on __Year__月__日, and shall expire after all design tasks are completed. If there are any unfinished matters in this contract, it is necessary to make additional provisions through mutual consultation. The Supplementary Agreement shall have the same effect as this Agreement, but shall not be inconsistent with the contents of this Agreement.
In the event of a dispute arising from the execution of the contract, both parties shall resolve it in a timely manner. If the two parties belong to the same department and the mediation is not completed by the competent authorities at the higher level, or if they do not belong to the same department, they may apply to the contract management agency prescribed by the state for arbitration, or they may directly file a lawsuit with the people's court.
The original of this contract is in duplicate, one for each of Party A and Party B; one copy of the contract is __ copies, and one for each unit such as the Commission, Construction Committee, and CCB.
Construction unit: Design unit:
Representative: ____ Representative: ____
Contact: ____ Contact: ____
Communications Office: ____ Communications Office: ____
Telephone or telegraph: ____ Phone or telegram: ____
Bank of deposit: ____ bank of deposit: ____
Account number: ____ account number: ____
__Year __月__日订
Attached:
____ Design Project Fee Schedule:
____ Engineering Design Supplemental Agreement.
____ design project fee schedule
Subsidiary file 1
┌──┬──┬───┬──┬────┬───┬───┬────┬───┐
│Project│Project│Unit m2│Design│Unit Cost │Engineering │Investment Estimate │Design Fee │Design Fee │
│No.│Name│ │Content│ │Quantity m2 │Calculation│Rate │ │
├──┼──┼───┼──┼────┼───┼───┼────┼───┤
│││ │││ │ ││ │
├──┼──┼───┼──┼────┼───┼───┼────┼───┤
│││ │││ │ ││ │
├──┼──┼───┼──┼────┼───┼───┼────┼───┤
│││ │││ │ ││ │
├──┴──┴───┴──┴────┴───┴───┴────┴───┤
│ This project entrusts the design of the total m2 investment estimate total yuan, and estimates the total design fee. Sign │
│ When the contract is booked, Party A will pay Party B a design fee of 50%, and temporarily pay the amount according to the yuan. │
└──────────────────────────────────┘
Note: The investment estimate is proposed by Party A. The designed investment amount is subject to the approved preliminary design estimate or revised design estimate.
Construction unit: Design unit:
Infrastructure Leader: Infrastructure Leader:
Signing the fee agreement date
Subsidiary file 2
____ Engineering Design Supplementary Agreement
This Agreement is signed under the architectural design contract and is an attached file of the original contract.
The design needs to be prepared and the parties agree:
1. Party A shall submit the following basic materials for construction file design on time:
┌────────────┬────────────┬──────────┐
│No.│ File and data name│Delivery date│
├────────────┼────────────┼──────────┤
│ ││ │
├────────────┼────────────┼──────────┤
│ ││ │
├────────────┼────────────┼──────────┤
│ ││ │
└────────────┴────────────┴──────────┘
2. Party B shall deliver the following design files on time on the premise that Party A submits the above files and materials on time:
┌───┬─────────────────────┬────────┐
│No.│Design file name and content│Delivery date│
├───┼─────────────────────┼────────┤
│ │ ││
├───┼─────────────────────┼────────┤
│ │ ││
└───┴─────────────────────┴────────┘
Construction unit design unit:
Director of the design department of the infrastructure manager:
Date of signing the agreement date
Enter into the contract:
Construction unit: ____, hereinafter referred to as Party A;
Design unit: ____, hereinafter referred to as Party B.
In order to clarify the responsibilities, work together and work together to complete the design tasks of the national construction project, according to the provisions of the “Construction Engineering Design Contract Regulations” and the __ approved project task book, the contract is signed by the two parties for full compliance. .
The first project name, scale, investment amount, construction site
Party A entrusts Party B to undertake the design project of ____ project. The construction and installation area is ____ square meters, the total investment approved is ____ million yuan, and the construction site is ____.
Article 2 Party A’s obligations
1. Party A shall submit to Party B the design task book approved by the escalation report, the project site selection report, and the agreement documents of raw materials, fuel, water, electricity, transportation, etc., before the __year __月__ day, and shall meet the preliminary design requirements. Survey data, technical data that needs to be obtained through scientific research. Party A shall provide approved preliminary design files and survey data that meet the construction drawing design requirements, construction conditions, and technical information about the equipment before the construction drawing of the __Year__月__日.
Party A must guarantee the quality of the above information and must not change it at will.
2. Promptly handle the design file approval work at each design stage.
3. Before the commencement of the project, Party A shall organize the relevant construction unit, and Party B shall carry out the design and technical disclosure; after the completion of the project, Party A shall notify Party B to participate in the completion acceptance.
4. When the designer enters the construction site to carry out the work, Party A shall provide the necessary working conditions and facilitate it in life. During the design and construction process, the test shall be carried out due to technical special needs, all expenses required and coordination with Party A. Party A is responsible for travel expenses to other places.
5. Party A must maintain Party B's design files and may not modify them without authorization. Party A shall not copy, reuse or arbitrarily expand the scope of construction without the consent of Party B. Party A is obliged to protect Party B's design copyright and may not transfer it to a third party for reuse.
Article 3 Obligation of Party B
1. Party B must deliver the preliminary design file to Party A before __Year__月__日; deliver the technical design file to Party A before __年__月__日; deliver the construction to Party A before __年__月__日Graphic design file. Among them, the preliminary design file is __ share, the technical design file is __ share, the construction drawing design file is __ share, and the other party needs to add the number of files and the model fee, and the fee will be charged separately. Before __year__month__ day, Party B must submit all design files to Party A.
. )
2. Party B must submit the survey technical requirements and design according to the approved design task book or the approval file of the previous stage design, as well as the design technical and economic agreement files, design standards, technical specifications, procedures, quotas, etc., and submit the quality-compliant design files.
3. After the preliminary design has been reviewed by the higher authorities, Party B shall be responsible for the necessary modifications within the scope of the original mission statement.
4. The design unit shall cooperate with the construction project to undertake the design task, carry out the technical pre-construction technical disclosure, solve the relevant design problems in the construction, be responsible for design change and revision budget, participate in concealed project acceptance and project completion acceptance.
Article 4 Modification and suspension of design
1. Party A shall request the modification of the design of the project for any reason. With the consent of Party B, Party A shall, in addition to the delivery time of the design file, be revised according to the actual rework date of Party B, and increase the design fee by __ yuan per working day, or according to the design stage. The percentage of work in rework is calculated.
2. If the original task book is reworked or modified if there is a major change, it must have a submission from the design approval authority or the design task approval authority. The payment of the design cost that has already been carried out is calculated according to the preceding article.
3. If Party A requests to stop design in the middle of the reason, Party B shall promptly notify Party B in writing that the design fee has not been refunded, and the design fee shall be increased and paid according to the actual labor hours at that stage, and the contractual relationship shall be terminated.
Article 5 Number of Design Fees and Delivery Method
Within __ days after the design contract is effective, Party A shall deliver a deposit equal to 20% of the design fee to Party B. After the design contract is fulfilled, the deposit shall be used as the design fee; B shall submit the preliminary design plan to Party A within __ days. Party shall pay Party B a design fee of __%; Party B shall settle all design fees to Party B within __ days after Party A submits the construction drawing file.
Article 6 Reward and Breach of Contract
1. Within the reasonable project investment control number, because Party B uses advanced technology or reasonable advice to save engineering investment, it can withdraw __% from Party B to save the investment amount.
2. Since Party A cannot provide the relevant design information on time and accurately, which may result in Party B's inability to design or cause design rework, Party B shall, in addition to the date of delivery of the design file, be subject to Party A's actual loss of working days, with daily __yuan Calculate the incremental design fee.
3. Party A shall not pay the deposit and design fee to Party B in accordance with the time stipulated in the contract, and shall pay Party B the liquidated damages according to the bank's provisions on deferred payment.
4. Due to Party B's reasons, delay in the delivery of the design file, Party B shall pay Party A a penalty of __% of the design fee for each delay of __ days.
5. Due to the poor quality of the design of Party B, it is necessary for Party B to continue to improve the design tasks, and to reduce the amount of waste caused by the loss or the design fee. For those who have caused major quality accidents due to design errors of Party B, Party B shall not only pay the design fee for the loss part, but also pay compensation equal to the design fee directly affected by the loss.
Article 7 Other
_________________________________.
This contract shall become effective after the signature of both parties on __Year__月__日, and shall expire after all design tasks are completed. If there are any unfinished matters in this contract, it is necessary to make additional provisions through mutual consultation. The Supplementary Agreement shall have the same effect as this Agreement, but shall not be inconsistent with the contents of this Agreement.
In the event of a dispute arising from the execution of the contract, both parties shall resolve it in a timely manner. If the two parties belong to the same department and the mediation is not completed by the competent authorities at the higher level, or if they do not belong to the same department, they may apply to the contract management agency prescribed by the state for arbitration, or they may directly file a lawsuit with the people's court.
The original of this contract is in duplicate, one for each of Party A and Party B; one copy of the contract is __ copies, and one for each unit such as the Commission, Construction Committee, and CCB.
Construction unit: Design unit:
Representative: ____ Representative: ____
Contact: ____ Contact: ____
Communications Office: ____ Communications Office: ____
Telephone or telegraph: ____ Phone or telegram: ____
Bank of deposit: ____ bank of deposit: ____
Account number: ____ account number: ____
__Year __月__日订
Attached:
____ Design Project Fee Schedule:
____ Engineering Design Supplemental Agreement.
____ design project fee schedule
Subsidiary file 1
┌──┬──┬───┬──┬────┬───┬───┬────┬───┐
│Project│Project│Unit m2│Design│Unit Cost │Engineering │Investment Estimate │Design Fee │Design Fee │
│No.│Name│ │Content│ │Quantity m2 │Calculation│Rate │ │
├──┼──┼───┼──┼────┼───┼───┼────┼───┤
│││ │││ │ ││ │
├──┼──┼───┼──┼────┼───┼───┼────┼───┤
│││ │││ │ ││ │
├──┼──┼───┼──┼────┼───┼───┼────┼───┤
│││ │││ │ ││ │
├──┴──┴───┴──┴────┴───┴───┴────┴───┤
│ This project entrusts the design of the total m2 investment estimate total yuan, and estimates the total design fee. Sign │
│ When the contract is booked, Party A will pay Party B a design fee of 50%, and temporarily pay the amount according to the yuan. │
└──────────────────────────────────┘
Note: The investment estimate is proposed by Party A. The designed investment amount is subject to the approved preliminary design estimate or revised design estimate.
Construction unit: Design unit:
Infrastructure Leader: Infrastructure Leader:
Signing the fee agreement date
Subsidiary file 2
____ Engineering Design Supplementary Agreement
This Agreement is signed under the architectural design contract and is an attached file of the original contract.
The design needs to be prepared and the parties agree:
1. Party A shall submit the following basic materials for construction file design on time:
┌────────────┬────────────┬──────────┐
│No.│ File and data name│Delivery date│
├────────────┼────────────┼──────────┤
│ ││ │
├────────────┼────────────┼──────────┤
│ ││ │
├────────────┼────────────┼──────────┤
│ ││ │
└────────────┴────────────┴──────────┘
2. Party B shall deliver the following design files on time on the premise that Party A submits the above files and materials on time:
┌───┬─────────────────────┬────────┐
│No.│Design file name and content│Delivery date│
├───┼─────────────────────┼────────┤
│ │ ││
├───┼─────────────────────┼────────┤
│ │ ││
└───┴─────────────────────┴────────┘
Construction unit design unit:
Director of the design department of the infrastructure manager:
Date of signing the agreement date
recommended article
- Construction engineering technical consulting contract
- Room decoration commission
- Qingdao Construction Project Construction Contract
- Engineering construction supervision commission
- Construction project demolition house contract
- Shanghai Participatory Housing Agreement
- Construction Engineering Design Contract (3)
- Shanghai housing rental (commercial housing pre-leasing)
- Demonstration text of construction project contract (2)
- Demonstration text of commercial housing contract
- Urban residential area owner management committee charter
- Shanghai Housing Sublease Contract Sample
popular articles
- Motivate employees
- Life motto
- Construction project construction contract (general)
- Philosophical words 2019
- Temporary wall construction agreement
- Construction project demolition house contract (official model
- 2014 motivational phrase
- Parental love
- Team construction contract (construction team)
- Non-mainstream sentence 2019
- Blessing phrase
- Weibo's famous sayings
- Relieved words
- Respect the teacher's famous words
- Ministry of Construction, State Administration for Industry and Commerce
- Grateful mother's words
- Legal maxim
- Contract conditions for construction of water conservancy and hydropower civil engineering
- Distressed sentence 2019
- Real estate mortgage loan contract
- What I said to my father 2019
- Good sentence excerpt 2019
- Space mood phrase
- Not afraid of failure
- Hyun dance family impression sentence
- Construction engineering survey contract
- Encourage words 2019
- Spring Festival blessing
- Qingdao Construction Project Construction Contract
- Construction project entrusted supervision contract (Chinese and English)