Construction Engineering Design Contract (2)
Construction engineering design contract
project name:
Project construction site:
Contract number:
Principal:
Undertaking party:
Date of signing:
Principal:
Undertaking party:
Party A entrusts Party B to undertake the engineering design, and the contract is signed by both parties.
Article 1 This contract is signed in accordance with the following files:
1.1 The Economic Contract Law of the People's Republic of China and the Regulations on Construction Engineering Survey and Design Contracts.
1.2 National and local engineering design management regulations and rules.
1.3 Construction project approval file.
Article 2 The name, stage, scale, investment, design content and standards of this contract design project:
┌───┬──────┬───┬──────┬────────────┐
│ No. │ Project Name │ Stage │ Scale Investment │ Design Content and Standard │
├───┼──────┼───┼──────┼────────────┤
│ ││ │││
├───┼──────┼───┼──────┼────────────┤
│ ││ │││
├───┼──────┼───┼──────┼────────────┤
│ ││ │││
├───┼──────┼───┼──────┼────────────┤
│ ││ │││
└───┴──────┴───┴──────┴────────────┘
Engineering features and notes:
Article 3 The relevant information and files submitted by Party A to Party B:
┌───┬───────┬───┬─────┬────────────┐
│ No. │ Data and file name │ Number of copies │ Content requirements │Submission time │
├───┼───────┼───┼─────┼────────────┤
│ │ │ │ │ 一年月日日│
├───┼───────┼───┼─────┼────────────┤
│ │ │ │ │ 一年月日日│
├───┼───────┼───┼─────┼────────────┤
│ │ │ │ │ 一年月日日│
├───┼───────┼───┼─────┼────────────┤
│ │ │ │ │ 一年月日日│
├───┼───────┼───┼─────┼────────────┤
│ │ │ │ │ 一年月日日│
├───┼───────┼───┼─────┼────────────┤
│ │ │ │ │ 一年月日日│
├───┼───────┼───┼─────┼────────────┤
│ │ │ │ │ 一年月日日│
├───┼───────┼───┼─────┼────────────┤
│ │ │ │ │ 一年月日日│
├───┼───────┼───┼─────┼────────────┤
│ │ │ │ │ 一年月日日│
├───┼───────┼───┼─────┼────────────┤
│ │ │ │ │ 一年月日日│
├───┼───────┼───┼─────┼────────────┤
│ │ │ │ │ 一年月日日│
├───┼───────┼───┼─────┼────────────┤
│ │ │ │ │ 一年月日日│
├───┼───────┼───┼─────┼────────────┤
│ │ │ │ │ 一年月日日│
├───┼───────┼───┼─────┼────────────┤
│ │ │ │ │ 一年月日日│
├───┼───────┼───┼─────┼────────────┤
│ │ │ │ │ 一年月日日│
├───┼───────┼───┼─────┼────────────┤
│ │ │ │ │ 一年月日日│
├───┼───────┼───┼─────┼────────────┤
│ │ │ │ │ 一年月日日│
└───┴───────┴───┴─────┴────────────┘
Article 4 The design files delivered by Party B to Party A:
┌───┬───────┬───┬─────┬────────────┐
│ No. │ Data and file name │ Number of copies │ Content requirements │Submission time │
├───┼───────┼───┼─────┼────────────┤
│ │ │ │ │ 一年月日日│
├───┼───────┼───┼─────┼────────────┤
│ │ │ │ │ 一年月日日│
├───┼───────┼───┼─────┼────────────┤
│ │ │ │ │ 一年月日日│
├───┼───────┼───┼─────┼────────────┤
│ │ │ │ │ 一年月日日│
├───┼───────┼───┼─────┼────────────┤
│ │ │ │ │ 一年月日日│
├───┼───────┼───┼─────┼────────────┤
│ │ │ │ │ 一年月日日│
├───┼───────┼───┼─────┼────────────┤
│ │ │ │ │ 一年月日日│
├───┼───────┼───┼─────┼────────────┤
│ │ │ │ │ 一年月日日│
├───┼───────┼───┼─────┼────────────┤
│ │ │ │ │ 一年月日日│
├───┼───────┼───┼─────┼────────────┤
│ │ │ │ │ 一年月日日│
├───┼───────┼───┼─────┼────────────┤
│ │ │ │ │ 一年月日日│
├───┼───────┼───┼─────┼────────────┤
│ │ │ │ │ 一年月日日│
├───┼───────┼───┼─────┼────────────┤
│ │ │ │ │ 一年月日日│
├───┼───────┼───┼─────┼────────────┤
│ │ │ │ │ 一年月日日│
├───┼───────┼───┼─────┼────────────┤
│ │ │ │ │ 一年月日日│
├───┼───────┼───┼─────┼────────────┤
│ │ │ │ │ 一年月日日│
├───┼───────┼───┼─────┼────────────┤
│ │ │ │ │ 一年月日日│
├───┼───────┼───┼─────┼────────────┤
│ │ │ │ │ 一年月日日│
├───┼───────┼───┼─────┼────────────┤
│ │ │ │ │ 一年月日日│
└───┴───────┴───┴─────┴────────────┘
Article 5 Party A shall pay the design fee of the contract item as yuan.
The payment method for the design fee is:
5.1 Within days after the commencement of this contract, Party A shall pay 20% of the total design fee, which shall be regarded as a deposit;
5.2 Within the day after Party B submits the design file, Party A shall pay the % of the total design fee, counting.
5.3 Within the day after Party B submits all the design files, Party A shall pay the remaining design fees and calculate the yuan.
Article 6: Liability of both parties
6.1 Party A's responsibilities:
6.1.1 Party A shall submit the materials and files to Party B within the prescribed time and in accordance with the provisions of Article 3 of this contract, and shall be responsible for its completeness, correctness and time limit.
Party A shall submit the above-mentioned materials and files within 15 days of the specified time limit, and Party B shall post the time for delivery of the design files in accordance with Article 4 of this contract; Party B shall have the right to re-determine the time for submitting the design files when the specified period exceeds 15 days.
6.1.2 If Party A changes the entrusted design project, scale, conditions or the information submitted is incorrect, or the proposed information is greatly modified, resulting in the design of Party B to be reworked, the two parties need to negotiate a supplementary contract and re-clarify In addition to the relevant provisions, Party A shall pay Party B the rework fee according to the workload of Party B;
6.1.3 During the performance of the contract, Party A requests to terminate or cancel the contract. If Party B has not started the design work, Party B will not refund the deposit paid by Party A; if the design work has begun, Party A shall perform the actual work that Party B has already carried out. When the quantity is less than half, half of the design fee for the stage is paid; if more than half, the total payment of the design fee for the stage is paid;
6.1.4 Party A shall pay the design fee to Party B according to the amount and time specified in Article 5 of this contract. For each day overdue, Party A shall bear the overdue liquidated damages of two-thousandths of the amount payable. If the time limit exceeds 30 days, Party B has the right to suspend the next stage of work and notify Party A in writing. Party A's superiors shall not approve the design files or the contract project shall be suspended. Party A shall pay the design fee payable;
6.1.5 Party A shall require Party A to pay the rushing fee when Party B requests Party B to submit the design file earlier than the time specified in the contract;
6.1.6 Party A shall provide convenient work and living and transportation facilities for the staff stationed at Party B.
Piece
6.1.7 Party A shall protect the design copyright of Party B. Without the consent of Party B, Party A's design files delivered to Party B shall not be copied or transferred to third parties or used for projects outside this contract. If any of the above occurs, Party B has Claim for rights.
6.2 Party B's responsibilities:
6.2.1 Party B shall deliver the design document to Party A in accordance with the content, time and number of copies specified in Article 4 of this contract.
Piece
6.2.2 Party B shall be responsible for modifying or supplementing the omissions or errors in the design file. Due to the design quality error caused by Party B's design mistakes, Party B shall, in addition to being responsible for taking remedial measures, waive the design fee for the lost part and reimburse Party A for compensation according to the degree of loss. The compensation shall be equal to the amount of the design fee waived;
6.2.3 Due to Party B's own reasons, the delivery time of the design file as stipulated in Article 4 of this contract is delayed. For each day of delay, the design fee of the project shall be reduced by two-thousandths;
6.2.4 After the contract takes effect, Party B requests to terminate or cancel the contract, and Party B shall return the deposit twice;
6.2.5 After Party B delivers the design file, it shall participate in the relevant higher-level review and be responsible for the necessary adjustments and supplements within the scope of the original plan task book according to the review conclusion. Party B shall deliver the design file within the time limit specified in the contract. The project shall begin construction within one year, and shall be responsible for designing the construction site, on-site construction services, handling relevant design issues and participating in the completion acceptance. Within one year, the project has not started construction, and Party B is still responsible for the above work, and can properly collect the Yuan Consulting Service Fee from Party A according to the required workload;
6.2.6 Party B shall not diffuse or transfer technical and economic data such as product drawings submitted by Party A to third parties. In the event of the above, Party A has the right to claim.
Article 7 Other
7.1 Party A shall require Party B to send a special person to the construction site for cooperation and solve relevant problems. The two parties shall sign a technical consulting service contract separately.
7.2 The national or local standard map adopted by Party B for this contract project shall be purchased by Party A at its own expense to the relevant publishing department. Article 4 of this contract stipulates that the number of design files delivered by Party B exceeds the number of copies specified in the Engineering Design Fees Standard, and Party B shall charge the cost of the work.
7.3 In the project, when the construction materials and equipment are processed and ordered, and Party A needs the cooperation of the design personnel of Party B, the expenses shall be borne by Party A.
7.4 Party A entrusts Party B to cooperate with the design tasks of the introduced project, and shall participate in the various stages of inquiry, external negotiation, domestic and foreign technical investigation and completion of production and production, and shall take part in Party B to undertake relevant design tasks. Except for the cost of going abroad, in addition to the installation fee, other expenses shall be paid by Party A.
7.5 Party A entrusts Party B to undertake work services other than the contents of this contract and pay separately.
7.6 When the contract cannot be fulfilled due to force majeure factors, both parties shall resolve the matter in time.
7.7 The construction project design contract shall have a dispute during the performance process, and the entrusting party and the undertaker shall promptly negotiate and interpret. When the negotiation fails, both parties agree to be arbitrated by the Arbitration Commission.
7.8 In the event that the contract is not completed, the parties may sign a supplementary agreement as an auxiliary file, and the supplementary agreement shall have the same effect as this contract.
7.9 This contract is in eight copies, with each party holding four copies.
7.10 After signing the seal, both parties shall report to the review department for review by the provincial construction administrative department where the project is located within 15 days. When both parties deem it necessary, they shall go to the industrial and commercial administration department where the project is located for verification. After the parties fulfill their obligations under the contract, the contract is terminated.
Name of the client: Name of the unit of the receiver:
Legal representative: Legal representative:
Unit address: unit address:
Postal code: Postal code:
Phone: Phone:
Telex: Telex:
Fax: Fax:
Bank of deposit: Bank of deposit:
Bank account number: bank account number:
Signing a contract representative: signing a contract representative:
Date: Date:
Year, month, day, month, day
Construction administrative department administrative department for industry and commerce
Review opinion
Review number: Review number:
Date of review: date of review:
Year, month, day, month, day
project name:
Project construction site:
Contract number:
Principal:
Undertaking party:
Date of signing:
Principal:
Undertaking party:
Party A entrusts Party B to undertake the engineering design, and the contract is signed by both parties.
Article 1 This contract is signed in accordance with the following files:
1.1 The Economic Contract Law of the People's Republic of China and the Regulations on Construction Engineering Survey and Design Contracts.
1.2 National and local engineering design management regulations and rules.
1.3 Construction project approval file.
Article 2 The name, stage, scale, investment, design content and standards of this contract design project:
┌───┬──────┬───┬──────┬────────────┐
│ No. │ Project Name │ Stage │ Scale Investment │ Design Content and Standard │
├───┼──────┼───┼──────┼────────────┤
│ ││ │││
├───┼──────┼───┼──────┼────────────┤
│ ││ │││
├───┼──────┼───┼──────┼────────────┤
│ ││ │││
├───┼──────┼───┼──────┼────────────┤
│ ││ │││
└───┴──────┴───┴──────┴────────────┘
Engineering features and notes:
Article 3 The relevant information and files submitted by Party A to Party B:
┌───┬───────┬───┬─────┬────────────┐
│ No. │ Data and file name │ Number of copies │ Content requirements │Submission time │
├───┼───────┼───┼─────┼────────────┤
│ │ │ │ │ 一年月日日│
├───┼───────┼───┼─────┼────────────┤
│ │ │ │ │ 一年月日日│
├───┼───────┼───┼─────┼────────────┤
│ │ │ │ │ 一年月日日│
├───┼───────┼───┼─────┼────────────┤
│ │ │ │ │ 一年月日日│
├───┼───────┼───┼─────┼────────────┤
│ │ │ │ │ 一年月日日│
├───┼───────┼───┼─────┼────────────┤
│ │ │ │ │ 一年月日日│
├───┼───────┼───┼─────┼────────────┤
│ │ │ │ │ 一年月日日│
├───┼───────┼───┼─────┼────────────┤
│ │ │ │ │ 一年月日日│
├───┼───────┼───┼─────┼────────────┤
│ │ │ │ │ 一年月日日│
├───┼───────┼───┼─────┼────────────┤
│ │ │ │ │ 一年月日日│
├───┼───────┼───┼─────┼────────────┤
│ │ │ │ │ 一年月日日│
├───┼───────┼───┼─────┼────────────┤
│ │ │ │ │ 一年月日日│
├───┼───────┼───┼─────┼────────────┤
│ │ │ │ │ 一年月日日│
├───┼───────┼───┼─────┼────────────┤
│ │ │ │ │ 一年月日日│
├───┼───────┼───┼─────┼────────────┤
│ │ │ │ │ 一年月日日│
├───┼───────┼───┼─────┼────────────┤
│ │ │ │ │ 一年月日日│
├───┼───────┼───┼─────┼────────────┤
│ │ │ │ │ 一年月日日│
└───┴───────┴───┴─────┴────────────┘
Article 4 The design files delivered by Party B to Party A:
┌───┬───────┬───┬─────┬────────────┐
│ No. │ Data and file name │ Number of copies │ Content requirements │Submission time │
├───┼───────┼───┼─────┼────────────┤
│ │ │ │ │ 一年月日日│
├───┼───────┼───┼─────┼────────────┤
│ │ │ │ │ 一年月日日│
├───┼───────┼───┼─────┼────────────┤
│ │ │ │ │ 一年月日日│
├───┼───────┼───┼─────┼────────────┤
│ │ │ │ │ 一年月日日│
├───┼───────┼───┼─────┼────────────┤
│ │ │ │ │ 一年月日日│
├───┼───────┼───┼─────┼────────────┤
│ │ │ │ │ 一年月日日│
├───┼───────┼───┼─────┼────────────┤
│ │ │ │ │ 一年月日日│
├───┼───────┼───┼─────┼────────────┤
│ │ │ │ │ 一年月日日│
├───┼───────┼───┼─────┼────────────┤
│ │ │ │ │ 一年月日日│
├───┼───────┼───┼─────┼────────────┤
│ │ │ │ │ 一年月日日│
├───┼───────┼───┼─────┼────────────┤
│ │ │ │ │ 一年月日日│
├───┼───────┼───┼─────┼────────────┤
│ │ │ │ │ 一年月日日│
├───┼───────┼───┼─────┼────────────┤
│ │ │ │ │ 一年月日日│
├───┼───────┼───┼─────┼────────────┤
│ │ │ │ │ 一年月日日│
├───┼───────┼───┼─────┼────────────┤
│ │ │ │ │ 一年月日日│
├───┼───────┼───┼─────┼────────────┤
│ │ │ │ │ 一年月日日│
├───┼───────┼───┼─────┼────────────┤
│ │ │ │ │ 一年月日日│
├───┼───────┼───┼─────┼────────────┤
│ │ │ │ │ 一年月日日│
├───┼───────┼───┼─────┼────────────┤
│ │ │ │ │ 一年月日日│
└───┴───────┴───┴─────┴────────────┘
Article 5 Party A shall pay the design fee of the contract item as yuan.
The payment method for the design fee is:
5.1 Within days after the commencement of this contract, Party A shall pay 20% of the total design fee, which shall be regarded as a deposit;
5.2 Within the day after Party B submits the design file, Party A shall pay the % of the total design fee, counting.
5.3 Within the day after Party B submits all the design files, Party A shall pay the remaining design fees and calculate the yuan.
Article 6: Liability of both parties
6.1 Party A's responsibilities:
6.1.1 Party A shall submit the materials and files to Party B within the prescribed time and in accordance with the provisions of Article 3 of this contract, and shall be responsible for its completeness, correctness and time limit.
Party A shall submit the above-mentioned materials and files within 15 days of the specified time limit, and Party B shall post the time for delivery of the design files in accordance with Article 4 of this contract; Party B shall have the right to re-determine the time for submitting the design files when the specified period exceeds 15 days.
6.1.2 If Party A changes the entrusted design project, scale, conditions or the information submitted is incorrect, or the proposed information is greatly modified, resulting in the design of Party B to be reworked, the two parties need to negotiate a supplementary contract and re-clarify In addition to the relevant provisions, Party A shall pay Party B the rework fee according to the workload of Party B;
6.1.3 During the performance of the contract, Party A requests to terminate or cancel the contract. If Party B has not started the design work, Party B will not refund the deposit paid by Party A; if the design work has begun, Party A shall perform the actual work that Party B has already carried out. When the quantity is less than half, half of the design fee for the stage is paid; if more than half, the total payment of the design fee for the stage is paid;
6.1.4 Party A shall pay the design fee to Party B according to the amount and time specified in Article 5 of this contract. For each day overdue, Party A shall bear the overdue liquidated damages of two-thousandths of the amount payable. If the time limit exceeds 30 days, Party B has the right to suspend the next stage of work and notify Party A in writing. Party A's superiors shall not approve the design files or the contract project shall be suspended. Party A shall pay the design fee payable;
6.1.5 Party A shall require Party A to pay the rushing fee when Party B requests Party B to submit the design file earlier than the time specified in the contract;
6.1.6 Party A shall provide convenient work and living and transportation facilities for the staff stationed at Party B.
Piece
6.1.7 Party A shall protect the design copyright of Party B. Without the consent of Party B, Party A's design files delivered to Party B shall not be copied or transferred to third parties or used for projects outside this contract. If any of the above occurs, Party B has Claim for rights.
6.2 Party B's responsibilities:
6.2.1 Party B shall deliver the design document to Party A in accordance with the content, time and number of copies specified in Article 4 of this contract.
Piece
6.2.2 Party B shall be responsible for modifying or supplementing the omissions or errors in the design file. Due to the design quality error caused by Party B's design mistakes, Party B shall, in addition to being responsible for taking remedial measures, waive the design fee for the lost part and reimburse Party A for compensation according to the degree of loss. The compensation shall be equal to the amount of the design fee waived;
6.2.3 Due to Party B's own reasons, the delivery time of the design file as stipulated in Article 4 of this contract is delayed. For each day of delay, the design fee of the project shall be reduced by two-thousandths;
6.2.4 After the contract takes effect, Party B requests to terminate or cancel the contract, and Party B shall return the deposit twice;
6.2.5 After Party B delivers the design file, it shall participate in the relevant higher-level review and be responsible for the necessary adjustments and supplements within the scope of the original plan task book according to the review conclusion. Party B shall deliver the design file within the time limit specified in the contract. The project shall begin construction within one year, and shall be responsible for designing the construction site, on-site construction services, handling relevant design issues and participating in the completion acceptance. Within one year, the project has not started construction, and Party B is still responsible for the above work, and can properly collect the Yuan Consulting Service Fee from Party A according to the required workload;
6.2.6 Party B shall not diffuse or transfer technical and economic data such as product drawings submitted by Party A to third parties. In the event of the above, Party A has the right to claim.
Article 7 Other
7.1 Party A shall require Party B to send a special person to the construction site for cooperation and solve relevant problems. The two parties shall sign a technical consulting service contract separately.
7.2 The national or local standard map adopted by Party B for this contract project shall be purchased by Party A at its own expense to the relevant publishing department. Article 4 of this contract stipulates that the number of design files delivered by Party B exceeds the number of copies specified in the Engineering Design Fees Standard, and Party B shall charge the cost of the work.
7.3 In the project, when the construction materials and equipment are processed and ordered, and Party A needs the cooperation of the design personnel of Party B, the expenses shall be borne by Party A.
7.4 Party A entrusts Party B to cooperate with the design tasks of the introduced project, and shall participate in the various stages of inquiry, external negotiation, domestic and foreign technical investigation and completion of production and production, and shall take part in Party B to undertake relevant design tasks. Except for the cost of going abroad, in addition to the installation fee, other expenses shall be paid by Party A.
7.5 Party A entrusts Party B to undertake work services other than the contents of this contract and pay separately.
7.6 When the contract cannot be fulfilled due to force majeure factors, both parties shall resolve the matter in time.
7.7 The construction project design contract shall have a dispute during the performance process, and the entrusting party and the undertaker shall promptly negotiate and interpret. When the negotiation fails, both parties agree to be arbitrated by the Arbitration Commission.
7.8 In the event that the contract is not completed, the parties may sign a supplementary agreement as an auxiliary file, and the supplementary agreement shall have the same effect as this contract.
7.9 This contract is in eight copies, with each party holding four copies.
7.10 After signing the seal, both parties shall report to the review department for review by the provincial construction administrative department where the project is located within 15 days. When both parties deem it necessary, they shall go to the industrial and commercial administration department where the project is located for verification. After the parties fulfill their obligations under the contract, the contract is terminated.
Name of the client: Name of the unit of the receiver:
Legal representative: Legal representative:
Unit address: unit address:
Postal code: Postal code:
Phone: Phone:
Telex: Telex:
Fax: Fax:
Bank of deposit: Bank of deposit:
Bank account number: bank account number:
Signing a contract representative: signing a contract representative:
Date: Date:
Year, month, day, month, day
Construction administrative department administrative department for industry and commerce
Review opinion
Review number: Review number:
Date of review: date of review:
Year, month, day, month, day
recommended article
- Demonstration text of construction project contract (2)
- Qingdao Construction Project Construction Contract
- Shanghai Housing Sublease Contract Sample
- Construction engineering technical consulting contract
- Construction project demolition house contract
- Room decoration commission
- Engineering construction supervision commission
- Urban residential area owner management committee charter
- Demonstration text of commercial housing contract
- Construction Engineering Design Contract (3)
- Shanghai Participatory Housing Agreement
- Shanghai housing rental (commercial housing pre-leasing)
popular articles
- Blessing phrase
- Contract conditions for construction of water conservancy and hydropower civil engineering
- Motivate employees
- Life motto
- Qingdao Construction Project Construction Contract
- Good sentence excerpt 2019
- Distressed sentence 2019
- Non-mainstream sentence 2019
- Ministry of Construction, State Administration for Industry and Commerce
- Team construction contract (construction team)
- 2014 motivational phrase
- Not afraid of failure
- Construction project entrusted supervision contract (Chinese and English)
- Hyun dance family impression sentence
- Construction engineering survey contract
- Construction project construction contract (general)
- Legal maxim
- Real estate mortgage loan contract
- Spring Festival blessing
- Construction project demolition house contract (official model
- Grateful mother's words
- Philosophical words 2019
- Space mood phrase
- What I said to my father 2019
- Encourage words 2019
- Parental love
- Relieved words
- Weibo's famous sayings
- Respect the teacher's famous words
- Temporary wall construction agreement