Plan for the use of electricity economic responsibility contract
First, electricity consumption indicators
______ month ____________________ The maximum load distribution of the company's electricity consumption indicator is ____________ million kilowatts. The daily load rate is assessed by _____%, and the economic constraints are calculated as _____%.
Second, load constraints
1. At peak load time ____________________ the company's electricity load shall not exceed the indicator ____________ million kilowatts. In the case of the grid, if the load exceeds _____%, the excess will be charged twice the basic electricity bill.
2. The peak time is daily: _____ points _____ points to __ points _____ points, _____ points _____ points to _____ points.
3. At peak load time ___________________________ Power Supply Bureau guarantees ____________________ company electricity consumption index ____________ million kilowatts. If the power is not supplied according to the plan indicator, the basic electricity fee for the month will be deducted by double the load of the reduced supply.
Third, the power consumption constraints this month should reach the electricity consumption = daily load × 24 × _____ × _____ = _________ million degrees.
1. If the ____________ company's monthly electricity consumption does not reach the above monthly electricity consumption electricity tariff. The less electricity consumption portion calculates the electricity tariff for the ________________ company's average electricity price last month.
2. In the case that _________________ company does not exceed the indicator ____________ million kW, due to the _______________ power supply bureau, _________________ company will use less electricity, and deduct from the actual electricity consumption, which is less Part of the _______________ company's average monthly electricity price calculated electricity tariffs, deducted from the monthly settlement of electricity charges.
Fourth, load and electricity calculation
1. Maximum demand for electricity = _______________ Company's power meter integrated hour maximum load × __________. The maximum demand for two peak hours per day for the whole month is used as the basis for settlement of electricity charges.
2. Daily peak time ________________ The company's maximum power load is assessed according to the following formula.
3. The electricity assessment shall be based on the electricity amount of the company's electricity bill settled by the power supply bureau in the month of ____________________.
5. The compensation and fines executed in this contract are settled before _______month _______, and other parts are still executed according to the normal electricity bill settlement method.
6. __________________ The company shall strengthen the management of electricity and electricity consumption for the project. When the power grid needs to be limited, the company should comply with the regional power dispatching requirements and cooperate with the power cuts without delay.
VII. _________________ The company shall provide the power supply bureau with timely and accurate settlement information of the basic monthly electricity fee. If there is any inaccuracy, the power supply bureau will submit a handling opinion.
8. The validity period of this contract: ____________ years ______month ______ days to ____________ years ______ months ______ days.
9. The handling department for the signing, execution and settlement of this contract is the _______________ power supply bureau and the ______________ power supply plant.
___________________ Person in charge of the power supply bureau: _________________
Manager: _________________
___________________company representative:_________________
Manager: _________________
_______Year _______Month _____ Day signing location: _______________
recommended article
- Supporting inheritance agreement
- Water supply contract
- Decoration project contract
- Office furniture order contract
- Network service agent contract
- Water conservancy project construction supervision contract
- Training institution cooperation agreement
- Construction land contract model
- Personal partnership contract (model document)
- Foreign equity transfer agreement
- Dynamic shopping system usage agreement
- Television purchase and sale agreement
popular articles
- Hyun dance family impression sentence
- Spring Festival blessing
- Grateful mother's words
- E-commerce company business joining contract template
- Blessing phrase
- Parental love
- Exhibition cooperation agreement
- Brand Authorization Agreement Template
- Good sentence excerpt 2019
- Relieved words
- Hotel room reservation agreement
- Brand authorization agreement
- Medical device registration agency contract
- Encourage words 2019
- Space mood phrase
- Non-exclusive agency sales agreement
- Power of attorney (trademark agency)
- Life motto
- Motivate employees
- Not afraid of failure
- 2014 motivational phrase
- Warehousing contract
- Distressed sentence 2019
- Non-mainstream sentence 2019
- Weibo's famous sayings
- Philosophical words 2019
- Legal maxim
- Sales Tripartite Agreement Template
- Respect the teacher's famous words
- What I said to my father 2019