Software system installation and implementation contract
Party A: _________ company residence: _________
Legal representative: _________ Party B: _________ Company residence: _________
Legal representative: _________
In accordance with the relevant laws and regulations of the state, in accordance with the relevant laws and regulations of the state, in accordance with the spirit of friendship and cooperation, the two parties reached the following terms on the implementation of the "_________ monitoring system" on the production site of Party A by mutual agreement:
The first agreement on the responsibility of both parties is to improve Party A's production management methods. Party A and Party B cooperate to implement the _________ monitoring system _________ and assume the responsibilities specified in the corresponding clauses below.
1. Party A shall be responsible for providing the relevant information required for the installation and commissioning of the system and the personnel designated to cooperate with Party B, and cooperate with Party B to complete the establishment and participation of the production process information database required by the above software system within the prescribed time limit _________ System connection work.
Party A shall provide the most detailed _________ format file required for project implementation to facilitate the exchange of information on the _________ system _________.
Party A shall not provide the software or any part of it to a third party without the prior consent of Party B.
Party A is responsible for the copyright secrecy of the above software system in the use of this unit.
2. Party B's Responsibility B provides Party A with a set of “_________ Monitoring System _________” software, including the server version of the scheduling and scheduling subsystem _________; the process preparation subsystem _________; remote control data collection terminal _________ One. The remote data collector is designated as a computer in this system and is responsible for the installation and implementation of the designated work site at Party B.
Party B completes the installation and implementation of the system according to the “_________” proposed by Party A.
Party B shall be the main party, and Party A shall complete the transmission between the designated information and _________. a. Realize the input of the list of materials, product name details, parts list, order number, etc. from the _________ data file provided by Party A. b. A table file or database material information that is output by the _________ system to the part manufacturing cost information of the Party A costing system.
Party B is responsible for the training of Party A's _________-_________ users.
Party B shall be responsible for keeping the information of Party A's production process and other information confidential from the information and shall not transfer it to any third party.
The second project and the agreement of the work program are divided into two parts:
1. Installation and commissioning of the basic system Party A shall provide Party B with relevant information as listed in the Schedule within the agreed time limit.
Party B and the designated personnel of Party A shall complete the establishment of the basic software use system; the time is from _________ years _________ months _________ days to _________ years _________ months _________ days.
The basic system runs the test from: _________ years _________month _________ days to _________ years _________ months _________ days.
2. _________ System and upper module data connection Party A is responsible for providing a detailed file format for the _________ system transmission of the upper management system of the shop floor.
Party B is responsible for completing the program module for the _________ system to transmit the manufacturing cost information of the parts to the _________ module; the time is from _________ years _________ month _________ to _________ years _________ Month _________ day.
Integrated system testing. The time is from _________ years _________ months _________ to _________ years _________ months _________ days.
Article 3 Agreement on Acceptance Standards
1. The acceptance of the basic system can be determined by the normal operation of the system according to the specified products, including the process route generation, the operation plan generation and the corresponding work files.
2. The acceptance of the remote control terminal is based on the normal transmission and acceptance signals of the system.
3. The information transmission with the corresponding data file of _________ is based on the normal transmission of information and the accuracy of the data.
Article 4 Agreement of Payment Method Party A shall pay Party B a total of _________ yuan for the software system service fee, and the payment shall be set to four periods:
1. The date of signing the contract between the two parties shall be _________ yuan;
2. The basic system is debugged normally and can be used for production and use. After acceptance, it will be paid _________ yuan within _________ working days;
3. The remote control data collection end and the main system are configured and debugged. After the experience is received, _________ yuan is paid within _________ working days;
4. According to the terms of this Agreement _________ system and _________ system to achieve data transmission, after the system adjusts the test, pay _________ yuan within _________ business days.
Article 5 Agreement on After-sales Service Party B shall provide system maintenance services to Party A within _________ years after the implementation of the system, and provide _________ times of free version upgrade service. After _________ years, the technical services for the above systems are based on RMB ______ yuan per person, and the working day is charged.
Article 6 Other Agreements
1. After the system has successfully implemented the first workshop of the company, Party B will present a basic system of Party A in the spirit of promotion and friendly cooperation, and Party B will implement another mold workshop in the enterprise.
2. Both Party A and Party B will continue to carry out project development cooperation based on the previous work in the spirit of friendly cooperation.
Article 7 Conditions for Entry into Force This Agreement shall enter into force on the date on which the legal representatives of the parties or their authorized agents sign and affix their official seals.
This Agreement is a _________ share with the same legal effect. The parties shall each hold _________ copies, and the other shall be used to perform relevant legal procedures.
person A person B:_______________
Legal representative: _________ Legal representative: ______
_________Year ____________________________________________
recommended article
- Office furniture order contract
- Television purchase and sale agreement
- Dynamic shopping system usage agreement
- Water supply contract
- Foreign equity transfer agreement
- Training institution cooperation agreement
- Water conservancy project construction supervision contract
- Construction land contract model
- Decoration project contract
- Network service agent contract
- Personal partnership contract (model document)
- Supporting inheritance agreement
popular articles
- Encourage words 2019
- Philosophical words 2019
- Legal maxim
- Power of attorney (trademark agency)
- Distressed sentence 2019
- Respect the teacher's famous words
- Brand authorization agreement
- Exhibition cooperation agreement
- Hotel room reservation agreement
- E-commerce company business joining contract template
- 2014 motivational phrase
- What I said to my father 2019
- Warehousing contract
- Blessing phrase
- Non-exclusive agency sales agreement
- Hyun dance family impression sentence
- Good sentence excerpt 2019
- Motivate employees
- Sales Tripartite Agreement Template
- Medical device registration agency contract
- Weibo's famous sayings
- Space mood phrase
- Spring Festival blessing
- Brand Authorization Agreement Template
- Grateful mother's words
- Relieved words
- Life motto
- Non-mainstream sentence 2019
- Parental love
- Not afraid of failure