Voyage charter agreement confirmation (2000 standard format)
________year month day
Lessor ________________________________________________
With the lessee ________________________________________________
The parties agree to perform this confirmation in accordance with the following terms and conditions:
Article 1 Specifications for shipping ships:
Ship Name: _____________________ Flag State: _________________ Construction Time: _______________
Class: _____________________ Registered shipowner: ____________________________________
Gross tonnage / net ton / deadweight: ____________ / ____________ / ___________ tons Summer freeboard: __________ meters
Total length / width: _______ meters / ______ meters Bulk capacity / packaging capacity: __________ cubic meters / ___________ cubic meters
Cabin / hatch: _______ / _______ Boom: __________ second deck: ______________________
[Add items as needed]_____________________________________________________
_____________________________________________________
Article 2 Goods and Quantity: [Use √ to indicate selection or]
[ ] __________ metric tons ______ [bag or bulk] cargo ______________________, increase or decrease _____%, selected by __________ [lessor or lessee].
[ ] ___________ cubic meters of goods ______________________________________, increase or decrease _____%, selected by _________ [tenant or lessor].
Article 3 Loading period:
__________Year ________________________________________________________________________________
Article 4 Loading/unloading port: [Use √ to indicate selection or]
[ ] _______ safe ports in ________________/_________________.
[ ] _____ safe berths in the port of ________________/_______________.
Article 5 Loading/unloading rate: [Use √ to indicate selection or or]
[ ] Every sunny day _______ metric tons / ____ metric tons, except Sundays and holidays, unless already used.
[ ] Every sunny day _______ metric tons / _________ metric tons, except Sundays and holidays, even if it has been used.
[ ] In _______________________ [port of loading or unloading port] Quickly load/unload according to port customs.
Article 6 Calculation of loading and unloading time: [Use √ to indicate selection or]
[ ] Loading time and unloading time are calculated separately.
[ ] Loading time and unloading time are combined.
Article 7 Freight rate: [Use √ to indicate the choice or or or]
[ ] Dry shipping ______________, the lessor does not bear the loading, unloading, storage and flatage fees.
[ ] Every ____ [net or gross] metric _________________, the lessor does not cover loading, unloading, bulking and trimming fees.
[ ] Every ____ [net or gross] metric _________________, the lessor does not pay the loading fee, the unloading fee is based on the liner conditions.
[ ] Every ____ [net or gross] cubic meters _________________, the lessor does not bear the loading, unloading, storage and flatage fees.
Article 8 Payment of Freight: [Use √ to indicate the choice or or]
[ ] Shipping charges should be paid within _______ banking days after the end of loading.
[ ] Freight charges shall be paid within _______ bank working days after the end of loading, but at the latest before unloading.
According to the above or the freight received or to be collected, the lessor will be earned after the goods are loaded onto the ship; regardless of whether the ship/goods are lost or not, the lessee must pay, no return, no deduction.
[ ] Shipping charges should be paid within _______ banking days after the end of unloading.
Article 9 Demurrage / Dispatch Fee:
The demurrage/demobilization fee is _________________________ per day, less than one day, calculated in proportion, and settled within ___ days after the end of unloading, but the lessor’s right to retain the goods is not affected by the provisions of this article.
Article 10 Taxes / Fees / Fees:
The tax/fee/cost of the vessel/freight is borne by the lessor regardless of its calculation method. The taxes/fees/costs of the goods are borne by the lessee, regardless of the method of calculation.
Article 11 Agent: [Use √ to indicate selection or]
[ ] The port of loading and unloading is the agent of the lessor.
[ ] The port of loading is the agent of the lessor and the port of discharge is the agent of the lessee.
Article 12 Commission: [Use √ to indicate the choice or]
[ ] Commission for freight, loss and demurrage includes a total of _____% of the commission.
[ ] Freight, loss and demurrage commissions total ____%, plus ____% to _______________________.
Article 13 Law and Arbitration:
This confirmation is subject to Chinese law and is interpreted in accordance with Chinese law. The charter party is established from the date of signing. Any dispute arising from or in connection with this Confirmation shall be submitted to the China Maritime Arbitration Commission for arbitration in Beijing. The arbitral award is final and binding on the parties.
Article 14 Jinkang Chartering Contract: [Use √ to indicate the choice or]
[ ] Other terms and conditions are in accordance with the 1994 Jinkang chartering contract, except for section 2.
[ ] Other terms and conditions are in accordance with the 1976 Jinkang chartering contract, except for the __________ clause.
Article 15 Special provisions:
________________________________________________________________
________________________________________________________________
________________________________________________________________
________________________________________________________________
________________________________________________________________
________________________________________________________________
________________________________________________________________
________________________________________________________________
________________________________________________________________
________________________________________________________________
________________________ ________________________
Tenant signing tenant signing
China International Chamber of Commerce
Lessor ________________________________________________
With the lessee ________________________________________________
The parties agree to perform this confirmation in accordance with the following terms and conditions:
Article 1 Specifications for shipping ships:
Ship Name: _____________________ Flag State: _________________ Construction Time: _______________
Class: _____________________ Registered shipowner: ____________________________________
Gross tonnage / net ton / deadweight: ____________ / ____________ / ___________ tons Summer freeboard: __________ meters
Total length / width: _______ meters / ______ meters Bulk capacity / packaging capacity: __________ cubic meters / ___________ cubic meters
Cabin / hatch: _______ / _______ Boom: __________ second deck: ______________________
[Add items as needed]_____________________________________________________
_____________________________________________________
Article 2 Goods and Quantity: [Use √ to indicate selection or]
[ ] __________ metric tons ______ [bag or bulk] cargo ______________________, increase or decrease _____%, selected by __________ [lessor or lessee].
[ ] ___________ cubic meters of goods ______________________________________, increase or decrease _____%, selected by _________ [tenant or lessor].
Article 3 Loading period:
__________Year ________________________________________________________________________________
Article 4 Loading/unloading port: [Use √ to indicate selection or]
[ ] _______ safe ports in ________________/_________________.
[ ] _____ safe berths in the port of ________________/_______________.
Article 5 Loading/unloading rate: [Use √ to indicate selection or or]
[ ] Every sunny day _______ metric tons / ____ metric tons, except Sundays and holidays, unless already used.
[ ] Every sunny day _______ metric tons / _________ metric tons, except Sundays and holidays, even if it has been used.
[ ] In _______________________ [port of loading or unloading port] Quickly load/unload according to port customs.
Article 6 Calculation of loading and unloading time: [Use √ to indicate selection or]
[ ] Loading time and unloading time are calculated separately.
[ ] Loading time and unloading time are combined.
Article 7 Freight rate: [Use √ to indicate the choice or or or]
[ ] Dry shipping ______________, the lessor does not bear the loading, unloading, storage and flatage fees.
[ ] Every ____ [net or gross] metric _________________, the lessor does not cover loading, unloading, bulking and trimming fees.
[ ] Every ____ [net or gross] metric _________________, the lessor does not pay the loading fee, the unloading fee is based on the liner conditions.
[ ] Every ____ [net or gross] cubic meters _________________, the lessor does not bear the loading, unloading, storage and flatage fees.
Article 8 Payment of Freight: [Use √ to indicate the choice or or]
[ ] Shipping charges should be paid within _______ banking days after the end of loading.
[ ] Freight charges shall be paid within _______ bank working days after the end of loading, but at the latest before unloading.
According to the above or the freight received or to be collected, the lessor will be earned after the goods are loaded onto the ship; regardless of whether the ship/goods are lost or not, the lessee must pay, no return, no deduction.
[ ] Shipping charges should be paid within _______ banking days after the end of unloading.
Article 9 Demurrage / Dispatch Fee:
The demurrage/demobilization fee is _________________________ per day, less than one day, calculated in proportion, and settled within ___ days after the end of unloading, but the lessor’s right to retain the goods is not affected by the provisions of this article.
Article 10 Taxes / Fees / Fees:
The tax/fee/cost of the vessel/freight is borne by the lessor regardless of its calculation method. The taxes/fees/costs of the goods are borne by the lessee, regardless of the method of calculation.
Article 11 Agent: [Use √ to indicate selection or]
[ ] The port of loading and unloading is the agent of the lessor.
[ ] The port of loading is the agent of the lessor and the port of discharge is the agent of the lessee.
Article 12 Commission: [Use √ to indicate the choice or]
[ ] Commission for freight, loss and demurrage includes a total of _____% of the commission.
[ ] Freight, loss and demurrage commissions total ____%, plus ____% to _______________________.
Article 13 Law and Arbitration:
This confirmation is subject to Chinese law and is interpreted in accordance with Chinese law. The charter party is established from the date of signing. Any dispute arising from or in connection with this Confirmation shall be submitted to the China Maritime Arbitration Commission for arbitration in Beijing. The arbitral award is final and binding on the parties.
Article 14 Jinkang Chartering Contract: [Use √ to indicate the choice or]
[ ] Other terms and conditions are in accordance with the 1994 Jinkang chartering contract, except for section 2.
[ ] Other terms and conditions are in accordance with the 1976 Jinkang chartering contract, except for the __________ clause.
Article 15 Special provisions:
________________________________________________________________
________________________________________________________________
________________________________________________________________
________________________________________________________________
________________________________________________________________
________________________________________________________________
________________________________________________________________
________________________________________________________________
________________________________________________________________
________________________________________________________________
________________________ ________________________
Tenant signing tenant signing
China International Chamber of Commerce
recommended article
- Water supply contract
- Supporting inheritance agreement
- Personal partnership contract (model document)
- Dynamic shopping system usage agreement
- Training institution cooperation agreement
- Office furniture order contract
- Foreign equity transfer agreement
- Television purchase and sale agreement
- Water conservancy project construction supervision contract
- Construction land contract model
- Decoration project contract
- Network service agent contract
popular articles
- What I said to my father 2019
- Medical device registration agency contract
- Spring Festival blessing
- Life motto
- Sales Tripartite Agreement Template
- Weibo's famous sayings
- E-commerce company business joining contract template
- Space mood phrase
- Hyun dance family impression sentence
- 2014 motivational phrase
- Blessing phrase
- Relieved words
- Power of attorney (trademark agency)
- Non-exclusive agency sales agreement
- Encourage words 2019
- Exhibition cooperation agreement
- Distressed sentence 2019
- Brand Authorization Agreement Template
- Grateful mother's words
- Philosophical words 2019
- Not afraid of failure
- Motivate employees
- Respect the teacher's famous words
- Parental love
- Brand authorization agreement
- Warehousing contract
- Good sentence excerpt 2019
- Hotel room reservation agreement
- Legal maxim
- Non-mainstream sentence 2019