Plan for the use of electricity economic responsibility contract


______Power Supply Bureau ______Steel Company Plan for Electricity and Economic Responsibility Contract

First, electricity consumption indicators:

__Month ______ The maximum load distribution of the electricity consumption index of the steel company is ____ 10,000 kW. The daily load rate is assessed at 93%, and the economic constraints are calculated at 91%.

Second, the load constraints:

1. At peak load time ______ steel company electricity load should not exceed the index ____ million kilowatts. If the load exceeds 105% when the grid allows, the excess will be charged twice the basic electricity bill.

2. The peak time is 8:30 to 11:30 and 18:30 to 22:00.

3. In the peak load time _________ power supply bureau guarantee ______ steel company electricity consumption index ____ million kilowatts. If the power is not supplied according to the plan indicator, the basic electricity fee for the month will be deducted by double the load of the reduced supply.

Third, the power consumption constraints:

The amount of electricity that should be reached this month = daily load × 24 × 0.91 × 31 = 10,000 degrees.

1. If a steel company's monthly electricity consumption does not reach the above-mentioned monthly electricity consumption and electricity tariff. The less electricity consumption part is calculated by the ______ steel company's average electricity price last month.

2. In the case that ______ steel company does not exceed the indicator of ____ 10,000 KW, due to the _______ power supply bureau, ______ steel company uses less electricity, it is deducted from the electricity consumption that should be achieved according to the actual situation, and its less supply part is also ______ The average electricity price of the steel company last month calculated the electricity tariff, which was deducted from the monthly electricity bill.

Fourth, load and electricity calculation

1. Maximum demand for electricity = ______ The maximum load for the integrated hours of the steel company's electricity meter × 1.06. The maximum demand for two peak hours per day for the whole month is used as the basis for settlement of electricity charges.

2. Daily peak time ______ The maximum power load of the steel company is assessed according to the following formula.

3. The electricity assessment shall be based on the electricity of the ______ steel company to settle the electricity bill to the power supply bureau in the current month.

5. The compensation and fines executed in this contract are settled before the ___month ___ day, and other parts are still executed according to the normal electricity bill settlement method.

6. ______ The steel company should strengthen the management of electricity and electricity consumption for the project. When the power grid needs to be limited, the ______ steel company should cooperate with the regional power dispatching requirements and cooperate with the power cuts without delay.

7. The ______ steel company shall provide the power supply bureau with timely and accurate settlement information of the basic monthly electricity fee. If there is any inaccuracy, the power supply bureau will submit a handling opinion.

8. The validity period of this contract: ____ years __month __ day to ____ years __ month __ day.

9. The handling department for the signing, execution and settlement of this contract is the ______ power supply bureau and the ______ steel power supply plant.

_______Power Supply Bureau ______Steel Company

Person in charge: Responsible person:

Manager: Manager:

Signing time: year month day

Signing place: