Traffic Highway System Maintenance Center Work Plan
In order to fully complete the maintenance and construction tasks for the first half of 2019 issued by the Municipal Bureau of Maintenance, we will improve the quality of highway road conditions, meet the national road maintenance inspection in 2019, and formulate this plan in conjunction with the actual situation of our maintenance center.
I. Guiding ideology and overall requirements
Guiding ideology: guided by Deng Xiaoping Theory and the important thinking of the "Three Represents" and guided by the scientific outlook on development, firmly establish the working philosophy of "better serving the public" and "letting the people go a better way" Focusing on the theme of “management and service” of highways, with four management and “chain-type” management as the main line, and “Human Sunshine and Road Harmony” activities as the carrier, comprehensively strengthen all aspects of road management and promote road service quality and service. The level achieves a new leap.
General requirements: All departments and units of the city's highway system should regard the inspection work as the top priority of road work in this year and next. On the basis of comprehensively finding problems and gaps, highlight the key points of work, increase capital investment, and strengthen work. Measures, strive to achieve new breakthroughs in the maintenance of the face, achieve new breakthroughs in standard management, achieve new breakthroughs in road innovation, achieve new breakthroughs in serving the public, and strive to make the Linyi trunk road more smooth, safer, more harmonious, More efficient, focus on the new image of Linyi Highway with harmonious sunshine.
Second, the 2019 conservation plan goals
Safe, high-quality and efficient completion of the maintenance and construction tasks for the first half of the year.
Third, seize the key points and actively carry out the maintenance and construction tasks in 2019
In 2019, for the maintenance work of our center, we must pay special attention to the following aspects:
1. Strengthen learning, enhance maintenance concepts, and strengthen refined maintenance
The organization maintenance personnel carefully studied the "Main Points of Highway Maintenance Work in Linyi City Highway Bureau in 2011" and the "Rehabilitation Maintenance Standards of Linyi City Highway Bureau" and the "Conservation Management Measures" formulated by the Center Maintenance Department. In-depth analysis based on the actual situation of the maintenance and construction tasks of our center, to find out the advantages and disadvantages of the previous work, and to discuss practical solutions. By learning and improving the concept of maintenance work, we can achieve the transformation of maintenance methods, improve the quality and technical level of maintenance personnel, and play a positive role in promoting the construction management of the next step.
2. Division of responsibilities. The person in charge of the construction team is the first responsible person for the construction quality and construction safety of the team. Each responsible person must establish a high degree of quality awareness and safety awareness. The main responsible persons of each construction team are as follows:
1. Zhao Zhipeng, pavement excavation construction team;
2, Zhao Guoyu, Collefu filling construction team;
3. Zhang Tiyong, Colleting Construction Team;
4. Tan Bingliang, bridge deck fracture repair construction team;
5. Wei Xiaofeng, bridgehead jumping and subsidence treatment construction team;
6, Zhou Xinghang, cold feed production and production team;
7. Pan Yun, departmental data collation, department building, etc.;
8. Zhang Wenjun, the comprehensive coordination of the entire department and maintenance engineering.
3. Carefully plan and carefully organize various maintenance and construction plans
According to the construction sequence of the road surface minor repair project and the quantity control table of the city bureau [9], the construction plan shall be completed in advance, and the preparation of personnel, machinery and raw materials shall be done in advance. Actively contact the person in charge of the custody unit, do a good job in maintenance and repair engineering and project supervision.
4. Give full play to the advantages of the mechanical and professional teams of my maintenance center, and actively use the maintenance center to intensify production capacity. At present, my maintenance center has 3 sets of filling equipment, 2 sets of cold-fixing equipment, 4 sets of heat-repairing equipment, 10 sets of small construction machines, 5 vehicles, 8 maintenance management personnel, 14 equipment operators and a group of skilled business. Skilled workers. All types of road maintenance projects can be completed. In case of unexpected events, cross- department adjustment and adjustment machinery can be carried out to further strengthen the intensive production capacity of the maintenance center.
5. System security. At present, the Maintenance Center of the Conservation Center is working hard to formulate a series of rules and regulations such as the “Career Maintenance Management Measures”. With fine maintenance as the work guide, in terms of maintenance standards, we will further revise, improve and implement standards and methods such as maintenance management, maintenance operations, inspection and assessment, and standardize the maintenance management and maintenance operations to make it more systematic, reasonable and practical. In the aspect of maintenance implementation system, strengthen the “chain-type” work target responsibility management model in the maintenance management function, implement maintenance objectives, responsibilities, and accountability step by step, improve the enthusiasm and initiative of maintenance personnel at all levels, and form Healthy, orderly, and up-and-down maintenance work pattern. In the aspect of maintenance assessment system, improve and implement the half-year maintenance inspection, year-end assessment and monthly maintenance inspection system of the municipal bureau, and establish a systematic and standardized maintenance assessment system that combines the usual and the year-end.
recommended article
- 2019 logistics department work ideas and plans
- Public Service Department semester work plan
- 2012 campus radio station work plan
- College organization department school year last work plan
- Disability Federation Work Program
- Customer Service Department Work Plan
- 2019 book management work plan
- Association of the Federation of Foreign Affairs Department work plan
- Department of Education's work plan
- Summary of supermarket work in 2019 and supermarket in 2019
- Network Technology Department Work Plan
- Sign Language Association Work Plan
popular articles
- Integrated Management Department Management Work Plan
- Sad love sentence 2019
- Strong words
- Young volunteer team work plan
- English famous words
- a good saying that loves labor
- I want to say something to the teacher.
- Tao Xingzhi's famous sayings
- New school year literary and art department work plan
- Bing Xin’s famous words
- Thanks to the friend's words 2019
- Korean swear words
- Du Yuexi's famous sayings
- College entrance examination inspirational quotes
- Deaf people jingle 2019
- Community Disabled Persons' Work Program
- Municipal Party Committee United Front Work Department 2019 work plan
- Teacher's famous saying
- Qq space mood phrase
- Ministry of Life work plan
- 2019 Quality Inspection Department work plan
- Community Neighborhood Committee Dibao Work Plan
- Classical life motto
- The latest high school inspirational maxim
- Association of the Federation of Foreign Affairs Department work plan
- 2019 Community Neighborhood Committee Work Plan
- Injured sentence
- Taizai’s famous sayings
- 2014 is very touching words
- Describe the fast time sentence 2019