2019 Purchasing Department Work Plan Model
Time has finally turned to xx years, and I have carefully recalled the xx years that have been sent away. I have a lot of emotions and a lot of benefits! In the past year, I have grown a lot and I have met many new friends. It has brought me a lot of new ideas and new inspirations! In this year, I have experienced a lot of bumps! I think the way of life is like this. When you have experienced it, your thoughts will have a new realm. Faster maturity!
First of all, I am very grateful to Sanli for providing me with an opportunity for development. I have been in Sanli for more than three months. With the care and mutual help of my leaders and colleagues, I have gradually gained a new understanding of the company and started a new starting point in the new environment.
In the past few months, I gradually learned from the initial ignorance to gradually understand some of the company's operating procedures, rules and regulations, and slowly integrated into the family of Sanli. I have always liked to use the family to describe the company. Perhaps the feeling of having a home is warmer, and the individual is easy to have attachment and responsibility to the family. Suddenly I want to quote a sentence: "Sanli is my home, success depends on everyone." The company is a team. Only by relying on the strength of everyone can the company's various systems be implemented and move toward a higher level.
In the work contacted during these three months, many drawbacks were discovered, such as:
First, the implementation of iso is too formalized
Many people regard iso as a kind of coping, and think that as long as they get a paper certificate, everything will be fine. And the fact that this is an extreme idea, iso is a continuous improvement in the effectiveness of the quality management system to meet customer needs. Previously, the company formed a written quality manual, program file, and work instruction book, but most of them were in the form and were not actually implemented. Most of the files are not suitable for the current situation of the company and have not been effectively utilized. As a result, there is no basis for investigation when the product is traced, and there is no corresponding emergency measures for the subsequent abnormal conditions, resulting in a vicious circle. In response to these phenomena, only fundamentally resolved, can truly implement iso, play the effective function of iso. First of all, let the company's full staff understand the spirit of iso, so that the company's various operations have a basis, and can be implemented.
2. In 2019, management did not develop effective and measurable quality targets.
Work is the same as life, and it will go in one direction when it is executed, and finally achieve a certain goal. Just like management
The goal is people, and the purpose of management is things. In the past year, each department's performance against its own department is not clear, and it has not been verified whether it meets the requirements of the company, let alone improvement measures. In the subsequent work of each department, we should formulate a more reasonable and effective goal, and regularly use statistics to determine whether the target has been achieved or even exceeded the target, and to provide reasons analysis, countermeasures and preventive measures for the unfulfilled part. .
Third, the implementation of the project is weak, resulting in waiting for waste
The waiting for nothing due to interruptions in the supply of raw materials, unbalanced operations, and improper scheduling of production plans is called waste of waiting. Switching between different varieties on the production line, insufficient preparation in advance, will inevitably lead to waste of waiting; the daily workload changes too much, sometimes very busy, sometimes causing people and equipment to be idle; the upstream process has problems, resulting in There is nothing to do in the downstream process. In addition, the existence of uneven work and rest in the production line is also an important reason for waiting for waste.
Fourth, the material has not been effectively managed
The raw materials have not been well controlled, and they are often used without any single picking, feeding or direct handling.
The inventory account card does not match, the material confirmation is not accurate, the purchased materials are not purchased, and the materials that should not be used are purchased for a large number of vicious cycles. Resulting in inventory backlog and production disconnection. Seriously affect the production schedule, increase too many sluggish products, and bring great trouble to inventory management. However, in the past one or two months, all the materials and replenishments have been strictly required to be issued by the materials, and they are handled in accordance with the Product Delivery Management Program. In strict accordance with the requirements of the general manager of Chen, the production and execution of materials for production and production scheduling. The above improvement, in November, when the sales situation has not decreased, the purchase amount has been significantly reduced by 1 million yuan. It can be seen that controlling inventory materials plays a decisive role in the flow of company funds.
Five, too much manufacturing
Too much manufacturing, too early, used up production costs in advance, and lost the opportunity for continuous improvement. Because the hardware department is intermittently idle, in order not to waste production capacity without interrupting production, the work-in-progress is increased, the product cycle is shortened, the space is enlarged, the waste of handling and accumulation is increased, and the huge inventory is brought.
6. Improper management
Often, after the problem occurs, the manager takes the corresponding countermeasures to remedy the additional waste. These problems are caused by the lack of prior management. Scientific management should be fairly predictable, have reasonable planning, and strengthen management, control, and feedback during the process of advancing. This can greatly reduce management. The phenomenon of waste occurs.
recommended article
- School 2019 work plan essay
- Accounting personal work plan
- 2019 real estate company personal work plan
- 2019 Central Party Committee Work Plan
- 2019 new semester personal work plan
- Work of the Safety Production Supervision Authority in 2019
- Preserving personal work plans
- The second semester of middle school, the 2019 political and religious work plan
- Construction Bureau Urban Construction 2019 Work Plan
- Middle School's work plan for governing schools according to law in 2019
- School class teacher work plan essay
- University group branch work plan
popular articles
- I want to say something to the teacher.
- Injured sentence
- English teaching work plan essay
- 2019 Community Work Project
- Taizai’s famous sayings
- Bing Xin’s famous words
- Sad love sentence 2019
- Thanks to the friend's words 2019
- a good saying that loves labor
- Qq space mood phrase
- 2014 is very touching words
- Kindergarten Taipan class work plan essay
- The latest high school inspirational maxim
- Teacher's famous saying
- Hotel Room Department 2019 Work Plan
- Child teacher personal work plan
- Classical life motto
- 2019 Elementary School Teacher's Personal Work Plan
- English famous words
- 2019 student union work plan essay
- College entrance examination inspirational quotes
- Describe the fast time sentence 2019
- Deaf people jingle 2019
- Du Yuexi's famous sayings
- Strong words
- Employee personal work plan
- Buyer's personal work plan
- Korean swear words
- Student Union's personal work plan
- Tao Xingzhi's famous sayings