Equipment Management Annual Work Plan


1. In-depth study of equipment management knowledge and improve equipment management capabilities. The Equipment and Equipment Management System issued by the Learning Equipment Department summarizes the equipment management methods to standardize and meticulate equipment management.

2. Strengthen the management and training of maintenance personnel. At the same time, the newly installed equipment is trained in the operating procedures and points of the operators, and the maintenance personnel are trained in common faults.

3. Strengthen the lubrication and maintenance of the equipment. Mobilize all the staff to carry out lubrication and maintenance of the equipment, and distribute the lubrication points of the equipment to the group, guide the team members and the maintenance to lubricate the equipment, and reduce the equipment failure through the lubrication maintenance of the equipment.

4. Strengthen the management of the secondary warehouse, adjust the inventory quota of the commonly used spare parts according to the starting condition of the equipment, and form a table for the detailed model and quantity of the used spare parts for the technical transformation. Use.

5. Organize oil changes to the hydraulic and lubrication systems of all centrifuges in the plant.

6. Adjust the existing equipment inspection methods, strengthen the team members' understanding of their own equipment problems and train the simple handling methods, and strive to repair the equipment at the initial stage of equipment failure to prevent the equipment from running and equipment. The expansion of the fault.