Substation annual work plan
First, the power grid construction and transformation:
Main network part:
1. Complete the new construction of 35KV Gaozhuang Substation.
2. Complete the new construction of 35KV Baiwang Substation.
, distribution network part:
1. Cooperate with the development company to complete the user project.
2. Complete the 10KV outlet project of Gaozhuang Substation and Baiwang Substation.
3. Gradually complete the hidden danger line and equipment transformation work.
Second, safety production:
To achieve the goal of safety throughout the year:
1. Complete the production tasks of the superior and the bureau in time.
2. Strengthen the operation and maintenance management of equipment to ensure the safe operation of the main, distribution network and substation.
3, to achieve safe production throughout the year, no main network, substation accidents.
4. The accident rate of the main network, substation and distribution network is lower than the ministerial standard.
5. There are no five types of malignant accidents.
Main network part:
1. Strengthen the inspection of equipment and lines to ensure the safe operation of equipment and lines.
2. Formulate the “Double Measures” plan for safety production of each unit and the key points of safety production in this year .
3. Preventive testing of equipment in March this year.
4. Do a good job in spring and autumn and autumn inspections, and do a good job in cleaning the equipment.
Distribution network part:
1. Continue to strictly implement the line work plan, approval, and guardianship system to ensure that there is no accident in safety production throughout the year.
2. Strengthen the inspection work of lines and equipment and eliminate them in time.
3. Continue to do a good job of anti-habitual violations.
4. Improve production rules and regulations, increase assessment efforts, and improve production materials.
5. Each unit shall formulate the “double measures” plan and safety work points of the department.
Third, staff training:
In January and February, the person in charge of the work of the bureau and the issuer of the work ticket were given a new version of the work ticket, the operation ticket, and the accident repair order.
2. In May, train and assess the job skills of each unit line supervisor.
In March and July, technical and theoretical knowledge training was provided to the global production and operation personnel.
4. Organize a technical competition for young workers in September and November.
5. Conduct monthly business assessments for employees of substation.
recommended article
- Department of Education Annual Work Plan
- County Development Planning Committee annual target measures
- Summary of Family Planning Work in 2019
- Urban Management Office 2019 Annual Work Summary and 2019
- Personnel Department Annual Work Plan
- Municipal Audit Office 2019 Annual Audit Project Plan
- Academic Affairs Office Annual Work Plan
- 2019
- Property company annual work plan
- 2019 annual news work ideas
- Summary of the annual work of planning villager autonomy
- University community department annual work plan
popular articles
- Thanks to the friend's words 2019
- Strong words
- 2014 is very touching words
- Planning Department Annual Work Plan
- CDC Annual Work Plan
- Personnel Department Annual Work Plan
- Village annual work plan
- Deaf people jingle 2019
- a good saying that loves labor
- Property annual work plan
- Teacher's famous saying
- Personal annual work plan
- Injured sentence
- College entrance examination inspirational quotes
- Bing Xin’s famous words
- Customer Service Department Annual Work Plan
- I want to say something to the teacher.
- Student Union Annual Work Plan
- Factory annual work plan
- Tao Xingzhi's famous sayings
- Sad love sentence 2019
- Taizai’s famous sayings
- Market annual work plan
- English famous words
- Describe the fast time sentence 2019
- Qq space mood phrase
- Du Yuexi's famous sayings
- The latest high school inspirational maxim
- Korean swear words
- Classical life motto