Summary of work in December of 2019 equipment maintenance section
One or twelve work priorities:
1. Strive to do antifreeze and heat preservation work.
In this month, we reviewed all the electric heat tracing in our section according to the weather conditions in northern Shaanxi, and carefully confirmed all the steam condensation systems. Two condensate valves and two manual valves were replaced. In the place where individual valves and hydrophobic pipes were damaged, there were 8 pieces of self-recovery of waste insulation materials in the section, which made a lot of work for safe and stable winter.
2. Equipment maintenance has been improved.
Another focus of this month is to strengthen the maintenance of the equipment. Especially for the rough machine, switch every day, and check the slot iron and the bracket as an important inspection point. The two small slag pumps were repaired and overhauled in a planned manner, laying a foundation for normal operation in the first half of 2009. The outlet valve of the large slag pump was replaced, which provided a convenient way to check the maintenance valve plate, and replaced the water separator of the water ring pump b, c. In addition, the equipment lubrication has also been strengthened, and each class can carefully lubricate the equipment it manages.
3. Further improve the on-site civilized production.
In response to some problems in the civilized production of the site, this month, we will focus on rectification. A lot of work has been done on the cleaning and maintenance of equipment hygiene, and some pipes, supports and supports have been derusted and painted.
4. With the deepening of the company's refined management work, the construction of the team is imperative. Under the premise of tight time and heavy tasks, our section carefully and meticulously organized and prepared ten systems for the construction of the team, worked overtime, and revised it five times, and completed the work in a safe and secure manner.
2. Insufficient work in December:
1, security management work is full of loopholes.
12.15 The occurrence of a flash explosion accident directly exposed the problems in the safety management work of my section. The lack of prescribed procedures in the maintenance process is only a matter of empirical operation and not strictly in accordance with the company's safety regulations. It is a habitual violation. There is also a big problem in the handling of the operation of the ticket. The management of the first-level management of the section is "the person is overstaffed" and does not actually play the role of security guardianship and post function, and commits the mistake of "bureaucracy". All in all, the safety management of my section is too extensive, the discipline of overhaul is too loose, the management of the section is seriously degraded, and the mind is paralyzed. Therefore, we should reflect deeply and learn lessons.
2, anti-freeze insulation work is still not detailed.
In the month, in the face of a sudden drop in temperature, although there were countermeasures in advance in our section, the strength was not enough, and there were still some small places that appeared frozen. Such as the remote transfer liquid level of the neutralization tower, the release of the acetylene main pipe and so on. Explain that our understanding of anti-freeze insulation work is not enough, the investigation is not meticulous, and there are too many places to be circled.
3. The management of the first-level management staff is immature.
The first-level managers of the section were originally from the front-line workers and not professional management talents, which may be longer than operations and weaker than management. In terms of management, I also learn by doing, and improve while summing up. In particular, psychological stress and mental burden are great after an accident, and there is deep guilt and self-blame. The burden of thought is more and more heavy, and it directly affects the daily work. The confusion is numb, which leads to the lack of rules in the work. This is a manifestation of immature thoughts, or it may be a shortcoming in the end of this month!
Third, the work plan for the month of September 2009:
1. Strive to do a good job in safety production around the Spring Festival.
Around the Spring Festival, everyone is immersed in the festive season, and it is often easy to ignore safe work. In view of this, my work will carry out special safety education activities before and after the Spring Festival. 嘱咐 employees pay attention to travel safety, do not drink alcohol before the class, drink less alcohol after class, reduce gatherings, rest more, ensure the energy at work, ensure correct operation and safe production.
2. Further improve the antifreeze and thermal insulation work.
In view of the weather forecast in northern Shaanxi, our section will be flexible and ready to do antifreeze work at any time. The cooling water of the standby large slag pump is a long flow, and the water sealed by the standby water circulation pump is a long flow, and the water of the primary water discharge pipe is opened. Put all steam condensate for one hour for half an hour. A number of quilts were prepared, and it was considered that the insulation was weak at any time.
3. Deeply reflect on your own mistakes and strive to establish a new image of the acetylene section from scratch.
It can be said that the effort of one year is in vain. However, we will deeply reflect on our own faults and strive to start from scratch and start from scratch, re-establishing the external image of our section and eliminating negative effects. Take the results and benefits to prove to the leadership that we are not the only ones.
4. In addition, we will fully implement the work and guidelines of the company and the branch to ensure the completion of the temporary tasks assigned by the branch. Special note: The first model text editor carefully collected for you, for your reference only.
recommended article
- Office Director General Work Summary essay
- Office performance building experience
- County Culture and Sports Management Office Annual Work
- Engineering Infrastructure Office Office 2019
- 2019 office secretary personal business work
- Summary of the work of the Forestry Bureau Office in 2019
- Summary of community culture work in 2019
- Summary of laboratory work in 2019
- The first half of the work of the Environmental Protection Industrial Park Management Office
- Year-end work of a real estate development company in 2019
- Summary of the work of the annual office
- Summary of the year-end work of the corporate office
popular articles
- Summary of personal office work in 2019 and 2019
- Year-end work summary essay
- Teacher's famous saying
- Korean swear words
- College entrance examination inspirational quotes
- Du Yuexi's famous sayings
- Summary of the work of the agency office in 2019
- Strong words
- Qq space mood phrase
- 2019 Office Work Summary essay
- Injured sentence
- a good saying that loves labor
- Deaf people jingle 2019
- I want to say something to the teacher.
- Tao Xingzhi's famous sayings
- 2014 company office work summary
- Bing Xin’s famous words
- Taizai’s famous sayings
- Office personal work year-end summary
- Sad love sentence 2019
- Summary of the work of the group company office
- Describe the fast time sentence 2019
- The latest high school inspirational maxim
- Summary of office work in 2019
- Classical life motto
- Thanks to the friend's words 2019
- Summary of the annual work of the office in 2019
- English famous words
- 2014 is very touching words
- 2014 office staff work summary