Electromechanical management is the main focus of coal mine production. Electromechanical quality standardization is safety production guarantee. As the first-line excavation team, the electromechanical team leader is closely combined with the comprehensive excavation team work. The maintenance team is actively working to develop the work objectives. Under the leadership of the captain, the team will fully carry out the work of the team. The accident rate has dropped drastically, effectively eliminating major mechanical and electrical accidents. The current practices of electromechanical work are summarized as follows:

I. Establish and improve the electromechanical rules and regulations

In 2008, with the steadily advancing construction mode of our team's double lanes and the replacement of 50 units in the 150 units of Wangtaijing District, our team first implemented the contradiction of the old electromechanical management system of our team. The number of personnel in the maintenance class was particularly prominent in order to solve the problem. The problem is to implement the mechanical and electrical equipment management package mechanism. The competent and experienced employees are responsible for the mechanical and electrical equipment maintenance and fault repair work within the scope of the captain's responsibility. Pay attention to the mechanical and electrical accident liability investigation system. Due to negligence or inadvertent maintenance of the mechanical and electrical equipment maintenance and repair work The quality is poor, the equipment is in normal operation and maintenance cycle, and the responsible person is responsible for the rigorous assessment. At the end of the month, the implementation of the mechanical and electrical equipment installation and maintenance, etc., to avoid the stateless mechanical and electrical work, and the work lacks serious lag, the production is normal, the establishment of mechanical and electrical accessories, the standby account, the regular statistics of mechanical and electrical equipment accessories. The standby situation is equipped in the production team to independently solve the general electrical faults.

Second, do a good job in electromechanical talent training

People are the decisive factors for all work. High-quality talents are the survival of the team and the source of development. At the same time, we are actively implementing the mechanical and electrical maintenance and maintenance work, and actively implementing the new talent training strategy to arrange the maintenance staff to change their posts so that they can brainstorm in different positions. The study and training to achieve a special and multi-energy project implementation of the talents to fully play the talents and benefits to achieve the best use of talents and materials to greatly improve the overall quality of the electromechanical team to lay the foundation for further building a first-class electromechanical team in the recent Wangtaijing district electromechanical competition In the underground electric fitter project, the top three won the top two in the Changping company's electromechanical competition.

Third, do a good job in electromechanical quality standardization

In the implementation of electromechanical quality standardization, a cable suspension is installed in one device; a small cable is installed to install a pair of cable hooks. A steel strand is installed and required to be responsible for the installation; Each switch has a number management for each device of each winch. Frequently checking the condition of the equipment. It is not allowed to have the slightest sloppy request for the maintenance team to carefully operate and ensure the normal operation of the equipment. The material plates, belt plates and lighting lamps are kept clean and tidy. A reward and punishment system for quality standardization work allows each employee to work hard at any time and any place to integrate quality standardization into every aspect of daily management, so that the work can be consistently pursued and “changed” in the “unchanged”. See the spirit in the subtleties

Summary of coal miners' work

In 2019, the moment will pass, and I have gone through an extraordinary year in my life journey with the Mine Production Technology Division and the Expansion Office. In the face of the hardships and sweats of this year, the most important thing for a coal miner is: dedication and dedication, no regrets; while success and failure, stick to faith and do not disgrace the mission. Under the correct leadership of the mine leadership, I have made great progress in both my thinking and my work. I will make a brief report on my ideological and political, study work and life situation:

First of all, in terms of ideological and political aspects, I actively participated in the study of political theory and the implementation of the scientific development concept by the Communist Party members and the various theoretical studies organized by the mining organs, conscientiously implemented the important speeches of leaders at all levels, cared about current affairs politics, and constantly improved their political and ideological qualities. . I have further developed my mind and tried to move closer to the party organization. Correctly handle the relationship between personal interests and the interests of the party and the people, adhere to the principle of party spirit, and always keep in mind the party's purpose. When national interests, collective interests, and personal interests conflict, personal interests are subject to collective and national interests, and local interests are subject to overall interests. The interests are subject to the long-term interests of the people. After two days of work, I have to watch the "18th National Congress" on the Internet. I am deeply encouraged and have a lot of benefits.

Secondly, in terms of work, I am mainly engaged in the underground measurement and safety production guidance work and the internal work of the production department in the Production Technology Division of Nanshan Coal Mine. During the work period, you should not be late, not late, not leaving early, taking notes frequently, and pursuing comprehensive development as your goal.

From January to August this year, I mainly worked in the production department. Every day, I reported the production and sales of the previous day to the group company. I submitted the production account and various drawings and materials to the Shawan County Land and Resources Bureau every month. Leading the staff of the department to conduct traverse measurements on the mine extension project of Xiaogou Mine, Honggou Mine and Dagou Mine, and often go deep into the next line with other personnel in the department to provide guiding opinions on the layout and safety of the mining face.

In August, I was appointed by the mine leader to the Shuigou Expansion Office to compile and compile the completion data. In order to successfully check the diversion mine before the expiration of the trial production period, my colleagues and I worked overtime to collect and sort out the completion data. At present, the inspection forms and self-inspection materials in the completion data have been basically completed and the construction of the construction log is under intense progress. Due to the frequent replacement of technicians in the construction unit, the construction log from 2008 to 2019 needs to be re-compiled, the workload is large and the process is cumbersome, but I believe that as long as it is done seriously, it will be completed on time and in good quality.

During the year, I worked diligently and fulfilled the tasks and daily tasks of the leadership. Proactive, truly do a line of love and dedication, continue to learn and solve various practical problems in the work, give full play to the role of the departmental functions, and actively carry out various tasks. I am fully aware of my heavy responsibilities and responsibilities as an ordinary employee.

The times are changing and the environment is changing. This makes me deeply realize that as a downstairs staff member, the work style is not to ruin the theoretical knowledge, but to proceed from practicality, from application to practice. Strengthening self-cultivation, through continuous learning, enhances my ability to serve the entire grassroots level of the mine, and through continuous learning, I have been continuously improved in all aspects.

In the field of learning, we will actively study the relevant knowledge of coal mining and measurement, and summarize the existing problems and lessons in the field work. At the same time, we often work with colleagues on various problems encountered in coal mining methods, coal mining technology and completion data. Communicate, brainstorm and improve your ability to solve problems. This year, I read two good books, "First Management" and "Life First", which inspired me to have direction and motivation for future work and study, and wrote my experience after reading. .

In terms of life, my work with colleagues and departments can be actively coordinated, life attitude is healthy, law-abiding, and united with comrades. Cooperate with colleagues, encourage each other, make progress together, and make due contributions to the progress of Nanshan Coal Mine.

In short, I learned a lot during the year. I also deeply understand that under the current situation that our mine has completed the production plan formulated at the beginning of this year and the economic benefits have increased significantly, we still have to work hard in the future work, not arrogant, and work hard to cooperate with leaders and colleagues. For all kinds of work, safety work must be constantly carried out. In 2019, I will continue to work diligently, strengthen organizational discipline, strengthen responsibility, love and dedication, and selfless dedication, and contribute to the economic development of Nanshan Coal Mine.

Summary of coal miners' work

Electromechanical management is the main focus of coal mine production. Electromechanical quality standardization is safety production guarantee. As the first-line excavation team, the electromechanical team leader is closely combined with the comprehensive excavation team work. The maintenance team is actively working to develop the work objectives. Under the leadership of the captain, the team will fully carry out the work of the team. The accident rate has dropped drastically, effectively eliminating major mechanical and electrical accidents. The current practices of electromechanical work are summarized as follows:

I. Establish and improve the electromechanical rules and regulations

In 2008, with the steadily advancing construction mode of our team's double lanes and the replacement of 50 units in the 150 units of Wangtaijing District, our team first implemented the contradiction of the old electromechanical management system of our team. The number of personnel in the maintenance class was particularly prominent in order to solve the problem. The problem is to implement the mechanical and electrical equipment management package mechanism. The competent and experienced employees are responsible for the mechanical and electrical equipment maintenance and fault repair work within the scope of the captain's responsibility. Pay attention to the mechanical and electrical accident liability investigation system. Due to negligence or inadvertent maintenance of the mechanical and electrical equipment maintenance and repair work The quality is poor, the equipment is in normal operation and maintenance cycle, and the responsible person is responsible for the rigorous assessment. At the end of the month, the implementation of the mechanical and electrical equipment installation and maintenance, etc., to avoid the stateless mechanical and electrical work, and the work lacks serious lag, the production is normal, the establishment of mechanical and electrical accessories, the standby account, the regular statistics of mechanical and electrical equipment accessories. The standby situation is equipped in the production team to independently solve the general electrical faults.

Second, do a good job in electromechanical talent training

People are the decisive factors for all work. High-quality talents are the survival of the team and the source of development. At the same time, we are actively implementing the mechanical and electrical maintenance and maintenance work, and actively implementing the new talent training strategy to arrange the maintenance staff to change their posts so that they can brainstorm in different positions. The study and training to achieve a special and multi-energy project implementation of the talents to fully play the talents and benefits to achieve the best use of talents and materials to greatly improve the overall quality of the electromechanical team to lay the foundation for further building a first-class electromechanical team in the recent Wangtaijing district electromechanical competition In the underground electric fitter project, the top three won the top two in the Changping company's electromechanical competition.

Third, do a good job in electromechanical quality standardization

In the implementation of electromechanical quality standardization, a cable suspension is installed in one device; a small cable is installed to install a pair of cable hooks. A steel strand is installed and required to be responsible for the installation; Each switch has a number management for each device of each winch. Frequently checking the condition of the equipment. It is not allowed to have the slightest sloppy request for the maintenance team to carefully operate and ensure the normal operation of the equipment. The material plates, belt plates and lighting lamps are kept clean and tidy. A reward and punishment system for quality standardization work allows each employee to work hard at any time and any place to integrate quality standardization into every aspect of daily management, so that the work can be consistently pursued and “changed” in the “unchanged”. See the spirit in the subtleties