Construction internship report


Catalogue 1 Construction Internship Report 2 Construction Internship Report 3 Construction Internship Report Part 1: Construction Internship Report

Awareness, attitude and performance of work:

Through the internship, I broadened my knowledge, sorted out the knowledge I learned, and constantly summarized and corrected.

The builder is a technical organization manager at the grassroots level. The main work content is to go deep into the construction site under the leadership of the project manager, assist in the construction supervision, review the engineering quantity with the construction team, provide the material specifications, models and arrival dates required at the construction site, and do the acceptance of the on-site materials. And management, timely acceptance and concealed visas for concealed projects, assisting project managers to collect, store and archive data for the project, and have an important responsibility for the progress and cost of on-site construction. The construction worker's job is to specifically solve the relationship between the construction organization design and the site at the construction site. The organization design must rely on the construction staff to supervise, measure, write the construction log, report the construction progress, quality, and deal with the site problems. Contact person for the command and construction team. At the same time, we must coordinate and manage with the subordinate construction teams.

It enhances the interpersonal skills, language expression and communication skills that can't be learned from books, and understands the current status and development prospects of the current construction industry with the development of the times. Through the internship, I have greatly stimulated my enthusiasm for learning and exploring in practice, laying a solid foundation for future work.

During the internship, he is constantly urging and guiding himself, actively advancing, diligent and promising, dedicating his dedication, realizing self-worth in his work, and clarifying the ideals and goals for his unremitting struggle. In the future work and the way forward, Faith and philosophy are driven by the spirit, solid, dedicated, hardworking, and constantly making new achievements in their own positions, using their excellent performance to return the port to prove their loyalty to it.

The content and completion of the work:

As a qualified construction worker, under the leadership of the project manager and construction supervisor, he is responsible for the construction organization and construction management work in the operation area and section. Coordinate construction, manage construction quality, on-site data, track construction progress, report material consumption, report required materials, coordinate supervision, make design changes, and confirm the amount of work on site. The first is to understand the drawings, understand the project implementation, and then rely on the drawings to build according to the drawings. Secondly, master the construction process at all stages of the construction and control the construction quality and progress and coordinate the scenes of people, materials and machines. management. I am mainly responsible for construction technology, construction quality, construction progress, and responsible for construction safety, collaborative material testing, and on-site management of professional supervisors.

Here's a brief introduction to the work:

I. In the on-site construction process, I know that the general construction process of the workers is: 1. Organize the construction according to the principle of first underground, after the ground, first main body, rear enclosing, first rough decoration and fine decoration, timely structural acceptance, and work as early as possible. Face-to-face, the main body of the organization crosses the work, which is beneficial to shorten the construction period. The configuration of the column and wall template is considered to be used 5-6 times. The construction of special roofing concrete is not required to leave the joints as required. 2. During the construction of the project, it is necessary to arrange the lap joints of the various processes and complete the necessary resources in accordance with the process requirements. 3. Organize enough labor to repair the slope in the excavation stage to ensure that the slope of the foundation pit does not collapse. If the acceptance of the foundation pit is not restricted by the relevant conditions, the foundation earthwork and the cushion layer shall be cross-worked, and the soil shall be cleaned, inspected and poured to ensure that the base soil of the bearing layer is not soaked by rain. Disturbance or artificial disturbance. 4. This project is a multi-storey building, and intermediate structure acceptance of structural engineering may be considered. During the construction of the structure, the process interspersed and the embedded parts are properly arranged. 5. When water, electricity, equipment, etc. are reserved and pre-buried, it is necessary to closely cooperate with the construction progress of civil works, actively organize interspersed cross-over operations, do a good job of pre-burial of water and electric pipelines, and do the installation and commissioning work in the decoration stage.

A good construction manager is both a hardworking and a goodwill home. In cooperation with the supervision and management project construction, it is necessary to understand the construction process and construction method management during construction and supervise and urge the construction team to complete the completed tasks in time.

The main gains and lessons of the internship:

Through this internship, I learned a lot of things that I couldn’t learn in the textbooks, and I can make myself closer to the society and realize the pulse of the real builders. During the internship of the construction unit, I found myself watching. From the perspective of the problem, the way of thinking about the problem has gradually developed. This is inseparable from practice. In the course of practice, I feel full and feel growth again.

Construction technology is a technician who goes deep into the field. In this process, engineering quality, construction safety and management are mutually reinforcing relationships. The three mutually restrict and promote each other. There must be a strict management system and scientific management methods, and quality and safety can be guaranteed. In turn, good quality and safety must have a set of strict management systems to take care of. Some seemingly inconspicuous problems in the construction management process often affect our project progress and affect the quality of the project. Here is a brief analysis and solution to some of the problems I encountered during construction.

1. The bottom template bracket is easy to settle

Analysis of the cause: In the construction process, the management is not good, the design is not carried out before the mold is attached. After the vertical mold is not carefully checked whether the bracket is stable, the construction team operating technicians are not trained, not familiar with the construction method, blind and dry, resulting in engineering accidents.

Solution: The formwork support must be determined according to the specifications and carefully calculated before pouring concrete. Before the construction, the foundation of the formwork should be tamped and filled, the axis position of the support should be placed, the gravel cushion should be placed, and the block should be set under the support.

2. In the process of expansion and casting, the template bulges, shifts, bursts and even collapses, and the expansion mold appears.

Analysis of the reason: the lateral support stiffness of the template is not enough, the template is too thin and the strength is insufficient, and the pinch support is not strong; if the column spacing is too large in the column mold, the mold expansion phenomenon will occur.

Solution: After the template is in place, the technician should check it in detail and find the problem and correct it in time. Generally, the middle part of the beam is pulled through the crosspiece with the wire, or the two sides of the formwork are tightened by the pull bolt; the column mold should calculate the side pressure when pouring the concrete, check whether the hoop meets the requirements, and add the standard horizontal slope in time. Support, scissors, etc.

3. Rebar processing error

Analysis of the cause: The construction management is chaotic, there is no strict inspection system, the operator will go to the construction site without training; the steel level is not understood, there is no ingredient list on the construction site, the operator is not strong, and the length of the unloading is out of control. Short time.

Solution: A sound quality inspection system must be established at the construction site. Each process must be inspected. The steel bar should be produced in strict accordance with the design drawings. The steel bars should be straightened first, and then rusted and then unloaded. Steel bars of the same specification shall be uniformly listed, indicating the grade, type, diameter, etc. of the steel bars. Special personnel shall be responsible for transportation, stacking and lifting. Technicians should conscientiously do a good job in concealing engineering acceptance records for steel bars.

4. Leaking structural reinforcement

Analysis of the reasons: The understanding of structural design is not comprehensive, and the role of structural reinforcement is not enough. In my opinion, most of them are not enough to pay attention to forgetting that they should also place structural steel bars, such as putting less or not putting "waist bars" in the beams, bending the steel bars under the columns, and so on.

Solution: Carefully check the installed steel bars to make up the structural steel bars, especially the edges and corners of the cast-in-place plates, the support parts of the beams, and the surrounding walls of the walls or plates. Effective measures should be taken during construction to protect the location of the structural reinforcement, and should not be stepped on at will.

5. Improper concrete pouring causes defects in components

Analysis of the cause: This defect is clearly seen after demoulding, and it is too late to remedy it. Because the enamel has been initially condensed, there will be honeycomb, pockmark, unevenness, exposed ribs, holes, slag inclusions, etc., which affect the structural durability requirements.

Solution: The general treatment methods include local repair, grouting, and reinforcement. It is necessary to formulate a reasonable construction technical plan, clarify the operational requirements, and carry out technical delivery work to the work team. Clear responsibility, implement demarcation and listing system, strengthen on-site management, pay attention to observe the situation of the template after loading the concrete, and solve the problem if it is found.

In summary, these problems and treatment methods have made me deeply understand the gap between the theoretical knowledge and practice of the book theory. There are many different construction techniques and construction management methods introduced in the book, due to geographical regions, humanities, and education. The degree and environment are different, so that reasonable methods and ways must be adopted in the project management process, and flexible application to specific management. Construction work is also a complex and varied work. The quality of management is directly related to the economic and social benefits of the project.

In the process of construction and construction, in view of the current situation of safety production, the safety of production must be “safety first, prevention first”. Always keep in mind safety and take safety control as your own work content. The construction industry is a very knowledgeable industry involving a wide range of knowledge. It can be said to be an industry that is “old and old”. In the future work, I will study cultural knowledge and expertise more hard. Constantly combine theoretical knowledge with practical experience, do a good job in the job, and make more contributions to the society.

Part 2: Construction Internship Report

Graduation internship is an important practical part of civil engineering. It is the process of verifying, enriching, consolidating and improving the relevant enterprises before completing the basic courses and professional courses. It is also a preview of the work. This is the first time I officially joined the society to set foot on the job. Start a life completely different from the past. Going to work at the prescribed time every day, during the work hours, I must complete my work tasks on time and on time, and never let me go. Responsible for yourself, for work, and for the reputation of the school.

From the beginning to this site we were assigned to the release group, which is the foundation of the building and is necessary for our beginners. During this period, I had a better understanding of the level and the theodolite, and I was more familiar with the operation of the measuring instrument. I also practiced the observation of the instrument on the construction site, which enabled me to adapt to operating the instrument under different conditions.

Night shift is a skill that allows us to adapt to the field operation under more severe conditions. To adapt to the worst environment, we can train ourselves better and let us learn more and more solid. Now the night of the early spring is cold. In the sleepy and cold, we must complete the measurement task. This is a challenge for our college students who are just internships, and a test that reflects our ability to adapt. As we work with the measurement, we also need to do something else to enrich our internship life. Digging, digging stones, moving bricks... is the exercise of our will. Although we have not done well for these exercises, we have also honed us at the same time. However, we have experienced the taste of society and let us know the hard work of the work. We must adapt to the work of the site.

After this internship, let me gain a perceptual understanding of this upcoming major in practice and lay a solid foundation for future professional study. It not only allows us to learn a lot of knowledge that we can't learn at all in the classroom, but also broadens our horizons, increases our knowledge, and lays a solid foundation for us to apply our knowledge to practical work in the future. Through internships, I have gained more in-depth exposure to professional knowledge, further understanding the importance of rationally controlling the cost of construction projects, understanding the problems in the process of engineering construction management and the difficult problems of conflicting theory and practice, and by writing an internship report, I have learned to integrate Applying what you have learned improves your ability to analyze and solve professional problems. I learned a lot through this internship:

First, the measurement line

Before the start of the project, the determination of the location of the building is also very important. In the work of measuring, I learned that in order to determine the location of the building, it should first be based on the building coordinates and coordinate lines and the architectural red line given by the planning institute. Position the measurement to determine its position.

The main points should be noted:

The outer axis is used as the basic vertical and horizontal line, and the absolute elevation is taken as ±0. 00 elevation, respectively, and the basic axis elevation is led to the adjacent building.

Vertical measurement of the building. A: Establish an auxiliary axis control network.

B: Establish a construction line control network, and draw a construction line such as a wall edge line and a column edge line according to the auxiliary axis control network. Building level elevation measurement.

Elevation control of the building. Using the stratified transfer method, the elevation of the building is led to the vertical reinforcement surface of the first column according to the ±0. 00 elevation line, and the measurement is transmitted upwards in this layer.

Foundation Engineering: Foundation engineering is the most critical part of each building, and it directly affects the quality of the project. And the technical content of the basic part is also very high. The basic part of the project includes earthwork excavation, drainage, raft foundation construction, and floor concrete.

Second, concrete engineering, template design and construction preparation:

1. Basic work before template installation:

1) Discharge: Firstly, the side column of the building, the axis of the wall, and the axis are taken as the starting point, and the axes are drawn. When the template is laid, the center line and the edge line of the template are ejected by the ink line according to the construction drawing. The wall template should eject the edge line and the outer control line of the template to facilitate template installation and correction.

2) The level of the building level is directly measured to the template installation position according to the requirements of the actual elevation. 3) The bottom position of the template pad should be leveled in advance, and the debris should be cleaned to ensure the correct position of the template, preventing the bottom of the template from leaking or the roots after the concrete is formed.

4) The foreman determines the assembly design plan of the template in advance, and carries out the technical, quality and safety of the construction team. 5) The template should be brushed with a release agent. Concrete engineering

The quality of concrete has a great influence on the safety of the structure and the cost of the structure. Therefore, we must pay sufficient attention to the construction quality of the concrete during construction.

1. Preparation for the job:

Before pouring, the garbage, dirt and other debris in the formwork and the oil on the steel bars should be cleaned up, and the cement blocks of the steel bars should be inspected. If the wood formwork is used, watering should be used to wet the formwork. The high level of the cleansing port of the column formwork is sealed after removing debris.

Second, the concrete on-site mixing:

Self-mixing cockroaches are used to prevent the temporary supply of goods and the on-site mixing of sporadic cockroaches. The raw materials and mix ratio should be consistent with the 砼.

1 According to the ratio of various materials and the weight of the vehicle determined by the mix ratio, the weight scales of cement, sand and stone are respectively fixed. The water content of the aggregate should be measured frequently, and the water consumption of the mix should be adjusted in time to ensure accurate water addition. To be overrated.

2 Loading sequence: Generally, the stone is first installed, then the cement is installed, and finally the sand is installed. If it is necessary to add the mixed material, it should be added together with the cement. If admixture is required, the powder should be pre-processed into small bags according to the amount of each plate. When it is used, it should be added at the same time as the coarse and fine aggregates; the liquid should be added to the mixer at the same time as the amount of each plate.

3 Stirring time: The minimum time for concrete mixing should be determined according to the requirements of the construction specifications. When mixing with admixture, the mixing time should be extended.

4 When the concrete begins to stir, the technical department and the foreman of the construction unit shall organize the relevant personnel to identify the slump and workability of the discharged concrete, check whether it meets the requirements of the matching ratio notice, and then stir after adjustment.

Early concrete curing

Practice has proved that most of the common cracks in concrete are surface cracks of different depths. The main reason is that temperature gradients cause sudden temperature drop in cold regions and cracks are easy to form. Therefore, the insulation of concrete is especially important to prevent early cracks on the surface.

From the viewpoint of temperature stress, the insulation should meet the following requirements:

1) Prevent the temperature difference between the inside and outside of the concrete and the gradient of the concrete surface to prevent surface cracks.

2) To prevent the concrete from being too cold, try to make the minimum temperature during the construction period of the concrete not lower than the stable temperature of the concrete use period.

3) Prevent old concrete from being too cold to reduce the constraints between old and new concrete. Concrete curing

The early curing of concrete should aim at maintaining suitable temperature and humidity conditions to achieve two effects: on the one hand, the concrete is protected from unfavorable temperature and humidity deformation, and harmful cold shrinkage and shrinkage are prevented. On the other hand, the cement hydration is carried out smoothly in order to achieve the design strength and crack resistance.

Theoretically, the water content in the newly poured concrete can fully meet the requirements of cement hydration. However, due to evaporation and other reasons often cause water loss, thereby delaying or hindering the hydration of cement, surface concrete is the easiest and directly affected by this adverse effect. Therefore, the first few days after concrete pouring is a critical period of maintenance, and should be paid attention to during construction. Therefore, we must be cautious in handling these events during construction, depending on the situation.

These problems are all noticed in the construction work. What kind of cement is used in the construction, the amount should be paid attention to, and the early maintenance of the concrete.

By participating in the drawing review, I understood the main content of the drawing review.

Before the general project starts, the owner, design unit, contractor and quality supervision unit shall participate in the drawing review to discover and solve the errors, contradictions and easy-to-create fuzzy concepts in the design and may exist in the future construction. Difficulties and other issues to avoid unnecessary losses during construction. Attention should be paid to the following points during the trial:

First, find out the defects and errors of the drawing itself. Review whether the drawing design conforms to the relevant national policies and regulations; whether the drawings and descriptions are clear, whether the reference standards are accurate; whether the construction drawing standards are correct or not; whether the total level is consistent with the construction drawing size, plane position, elevation, etc., flat, vertical, and sectional views Whether the relationship is consistent; whether the design of each professional work is coordinated and consistent.

Secondly, the feasibility of the construction combined with the characteristics of the drawings, research drawings in the construction process, in terms of quality, safety, construction period, process, material supply, and even economic benefits can meet the requirements of the drawings, if necessary It is recommended that the design unit be given appropriate modifications.

Finally, whether the geological data is complete, can meet the requirements of the drawings; whether the surrounding buildings or environment affect the construction of the building; whether the functional design of the construction drawings meets the requirements of the construction unit, etc., are the main contents of the drawing review.

The drawings and other issues in the preparation for the review will be summarized, and the project technical person in charge will convene the relevant personnel to conduct an internal preliminary examination. In order to better understand the designer's design principles, I checked the relevant atlas, conducted in-depth research on the drawings, put forward a lot of insightful questions, and had a heated discussion with the construction technicians, striving to put every place. I understand the place I understand. I found that in addition to the wrong size of the structure and the building, the steel bars are wrong, and the most important thing is that it does not match the atlas. I also found that the most important thing is that the door opening on the shear wall is also easy to make mistakes. .

This internship made me realize that reading is a way to broaden my horizons of knowledge, but more practice, smooth in the real world, touch the pulse of society, set a position for myself, is also an excellent way to improve their overall quality. select. I will continue to understand and appreciate the knowledge I have learned in the internship. In the future work, I will apply the theoretical knowledge and practical experience I have learned to practical work to fully demonstrate my personal and life value. . To achieve self-ideal and bright future efforts.

Part 3: Construction Internship Report

Foreword

1.1 Internship background

In order to apply theory to practice, consolidate what you have learned, improve your ability to discover problems and analyze problems and solve problems with your knowledge, exercise your ability to work, adapt to social capabilities, self-management skills, and understand the current software application. The situation, development direction and prospects are fully prepared for the successful graduation, and also prepare for the smooth integration with the social environment. The internship is organized by the school and is organized in two stages and in two directions. practice.

Internship requirements:

1. Students are required to study technical knowledge carefully during the internship process and actively cooperate with the instructor and classmates;

2. In the early stage, attend the work on time and study hard. Actively do an internship log to understand the content of the day. The theoretical knowledge of technology should be practiced in a timely manner; in the later stage, actively communicate with classmates and conscientiously complete the content of the project requirements. In this process, you should communicate with your teachers and classmates to explore the project's solutions and progress.

Internship time: November 5, 2019 to April 25, 2019.

1.2 Internship environment

Internship Name: Guangzhou Yujian Network Technology Co., Ltd. Internship Address: Tianhe Software Park, Keyun Road, Tianhe District, Guangzhou

Overview of the internship base: Guangzhou Yujian Network Technology Co., Ltd. was established in April 2019, and moved to Guangzhou in February 2019 due to business development needs. The registered capital of the company is RMB 1 million. At present, our company is mainly engaged in the development and operation of online game products. Now we have successfully developed two large-scale self-intelligent property rights web games, which are created by a group of experienced industry insiders, in order to create a player of different ages. The platform that can delight the game is currently operated on multiple platforms, such as 4399, 91, and play, both in Vietnam and Taiwan, which are widely loved and praised by Internet users. Guangzhou Yujian is based on the principle of fairness, reasonableness, professionalism, quality and innovation, and constantly improves the quality of the game. Our company has gathered some of the best elites in the domestic information industry and has a technology research and development department. The company has successfully developed and mastered the online game server architecture that can support millions of people at the same time, and designed a mature technology solution. Advanced technologies such as programs provide strong technical support for subsequent improvements. With its precise strategic goals and for the future, Yujian will continue to focus on the development of China's Internet and communication technologies, based on the Internet industry, with software development, game development, value-added products, website construction and other fields as its own. Long-term development strategy.

2 Internship process

2.1 Internship time

The internship process can be roughly divided into these stages:

1. November 5th - November 12th, 2019: Transfer from java to as3, complete all learning tasks 2, November 13, 2019 - January 1, 2019: Complete the internal test version of the web game 3, 2019 January 2nd - April 25th, 2019: Complete the public beta of the web game

2.2 Internship content

I just started my internship because I learned Java at school, and the language required for the client of game development is AS3. Therefore, the first week of the beginning is to painstakingly learn the AS3 language foundation and complete the learning tasks arranged by the supervisor one by one. Because during the school, I studied hard and laid a good foundation in software engineering and the foundation of object-oriented language programming. So I mastered this new language in 3 days and started to practice through some small functions. The team shares tasks and pressures.

After half a month of self-study, consultation and exploration, I fully developed the game client development. Begin to take over some complete functions, such as "friend blessing", "martial mission", etc. When you encounter problems, the first thing is to think and find the information yourself. Because after the study period, you can't ask the seniors as often as before. The seniors also have many tasks. And work, learn to complete the function independently. Although I started to work hard, I used my perseverance to persist in the past and started to implement functions independently. The team began to identify with me as an intern.

After three months of internship, the functions and tasks assigned to me have become more and more numerous. My little intern started to work on the same level as the formal workers. Some functions also cooperated with several seniors. They also started to be equal to me. Discussing the communication solution, sometimes my plan is better than theirs, and finally decided to adopt my. It began to be recognized and appreciated by the supervisor and the team.

Four months after the internship, there were other newcomers coming in for internships. I started to work as a small tutor to guide newcomers on how to get started. I learned to put together some knowledge points into one sentence or a paragraph, or to illustrate a problem through a vivid example, and I have improved a lot.

2.3 Main results

In the past six months, I have been actively learning, working hard, and working with the team to make our project team

The internal test version and the public beta version of the web game "Yu Jian Tian Xia" were completed.

3 Summary

Attitude is everything. When you have a new task for you, you need to know if you are qualified for the job. The key is to look at your own attitude towards work. The attitude is right, even if you have not learned the knowledge before, you can gradually master the work. The attitude is not good, even if I have a knowledge base, I will not do my job well. At the beginning of the internship program, I don’t know what to do, and this is not necessarily related to the Java language I have learned at school. I feel a headache, but I can see how others do it during the work process, listen to what others say, think more about what I should do, and then do it myself, and finally have a more systematic work in just a few days. The understanding, slowly, can also complete the relevant work, and it is impossible to use the mouth to say it. Therefore, we must correct our own attitude regardless of what we do in the future, so that we can do things well.

During this internship, I encountered a lot of problems, some of which I know, and many of which I don't understand. I don't understand things. I have to humbly ask teachers and classmates. When others teach us knowledge, I should also be open-minded. Accept, don't think that you know a little bit of flesh and blood.

Looking back at the entire internship process, I have a lot of new experiences every day. I want to say a lot. I have summarized the following points:

1. Team awareness is the necessary guarantee to complete the project.

In the process of developing this web game, I fully realized the importance of teamwork. Especially though I am an intern, I am burdened with a lot of work and even more formal employees. It is hard to imagine if my progress is slow or everyone is not united. During the period, through the teamwork of all of you, the project team completed the project efficiently and quickly, and of course the most important thing was that I got a lot of practical opportunities. 2, skilled professional skills

Providing the best solution is the direction of our efforts. The development idea of ​​web games is to realize the game entertainment needs of players. After we have sorted out the functions of the game, we need to provide an optimal solution to help enterprises achieve more effective management. We must be familiar with web games. The needs of the players, mastering the industry's professional knowledge, and being able to integrate the most appropriate game concepts, this is nothing but a high requirement for the interns, we need to continue to learn, and constantly accumulate experience in individual projects. But this is also the goal we are fighting for. 3, strengthen confidence, persistence Although I feel that I can learn, but I really feel that I can't work. Sometimes when you encounter something, you will always be anxious and panic. I usually lack confidence and always feel that I can't do well. It may take some time to hone. Only your own knowledge and ability are improving. I believe that one day I will be brave enough to express myself. In short, throughout the internship, I have a lot of gains and joys, but there are also bitter and lessons. These successful experiences will motivate me to achieve even greater success in my future life. The failed experience will make me try to change my needs. The place to change can be that I grow faster and make myself better in the days to come. These precious life experiences have inspired me to practice on the road of life in the future, dare to innovate, lay a solid foundation for the glory of life, and become a valuable asset for my lifelong benefit. 4. Good communication and coordination skills

At the beginning of the training, I was asked to be familiar with the as3 language in a week. Fortunately, I learned the good language-oriented programming foundation in the Java language at school. I completed all the learning tasks in 3 days and I mastered the as3 language. . So I started to do some actual functions by doing some small functions. Because the software projects that were used in school before are actually developing games, I feel very strange. During the period, I actively communicated with my colleagues, learned about the framework of game development, common problems, etc., and then I found the information to realize my own functions independently. Sometimes entering a new field, a lot of experience is difficult to learn in the book, to communicate with the veteran veterans, so good communication and coordination skills during this period is also essential.

This 6-month work life is full and fun, and I have met many colleagues and friends. The atmosphere of the company is very relaxed and enjoyable. Thank you for your concern for the 6 months, thank you for the careful guidance of the seniors of the department, thank you for your kind help from the colleagues of the company, and thank you for providing me with this rare internship opportunity. Here, I am the first to go from student to career. Steps are an important step towards society. Through this game development internship, I learned a lot of things that I couldn't learn in books. From ignorance to cognition, to deep understanding of the company and society, from the beginning of the bumps to the later work, the work was a smooth transition. Special thanks to Guangzhou Yujian Network Technology Co., Ltd., it is the sword that provided me with a good internship environment, which made my internship have obvious effects, as well as the guidance of our teachers on our professional skills. , so that my technology has been greatly improved. In addition, I would like to thank my project team members for their mutual help and learning, to solve the problems together and to challenge the difficulties. Our internship process can be successfully completed. I am more aware of the team spirit. Valuable, but also the most sincere friendship.