Construction Engineering Supervision Internship Report
On December 1, 2019, I came to the Wuying Expressway Project Department of Hubei Province and started a half-year internship. This time I came to the Huanggang section of Hubei Wuying Expressway, which was managed by Hubei Gaolu Supervision Consulting Co., Ltd. and Iron. Wuying No. 4 High Supervision Office jointly organized by the Fourth Hospital Consulting Co., Ltd. is engaged in engineering supervision work here. The main work is to organize the internal materials and comprehensive related work.
The Wuhan-Yingshan Expressway is a component of the main skeleton of the “five vertical, three horizontal and one ring” highways in Hubei, and is also an important road carrier for the Wuhan city to radiate to the northeast of Hubei. The project starts from Wuhan City Ring Expressway in the west, connects with the Wujiaji-Zhoupu section of Wuhan Export Road, and reaches Dafengshuling in the east of Hubei and Anhui. The main line passes through Wuhan Xinzhou District and Tuanfeng County. Lishui County, Luotian County and Yingshan County, with a total length of 131.141 km; it is the most convenient land passage between Wuhan and its western areas to the Yangtze River Delta and Longnan. The project runs through the northeastern part of Hubei Province and shoulders the northeastern region of Hubei and Wuhan. The surrounding cities have important functions in inter-city transportation. At the same time, the project is also connected to the internal urban group or development zone of Wuhan, such as Yangluo and Xinzhou, which is an important part of the Wuhan expressway system. Its construction is to improve the layout of the national and Hubei skeleton road network, accelerate the social and economic development of Hubei Province in Northeast Hubei, enhance the radiation function of Wuhan City, and alleviate the traffic pressure of the main road of Hurong National Road. The tourism resources of the two provinces are very Significance.
In the early days of the Office of the High Commissioner, it was a confusing task. There is no clear concept of what the supervision is, what to do, what to do, what rights and obligations, and the corresponding workflow. Although the book has learned about the project supervision, but the actual operation found that there is more to learn, no matter how good it is, if you do not start and use it, it is often on paper. I think this is one of the reasons why the school arranged for our half-year internship. In today's society, competition is fierce, and there are often times when dozens or even hundreds of people are facing a position. So, what is the principle of picking one out of the enterprise? In addition to personal qualities, academic qualifications and other hardware conditions, work experience will be an important condition for employers to select talents. Therefore, if you want to find a place in the inevitable trend of survival of the fittest, the cultivation of hands-on ability will increase the practical experience. A discipline that we must take before we officially go to society.
After the official start of work, I was assigned to the 13th Office of the Supervisory Office, responsible for the collection and collation of the industry materials in the tender. According to the introduction, the 13th tender section of Wuying Expressway is k122+703-k129+000, and the total length of the route is 6.287km. The tender section is located in Yangliu Town, Yingshan County, Huanggang City, and belongs to the mountainous hilly area due to the topographical conditions. Impact, so this section is dominated by bridges and one tunnel. The first and second work areas that I have in charge are composed of Jinjiachong Viaduct, Yangliu No.1 Bridge, Yangliu No.2 Bridge, Yangliu No.3 Bridge and the subgrade and culvert in the corresponding section. In the first few days, I followed the supervision engineer to the construction site, and had a preliminary understanding of the division of the tender section, the geographical location of each structure, the progress of the project, and other related factors, and the construction unit "China Railway 15th Bureau" Engineers, technicians, data clerk, etc. know each other to facilitate the smooth development of future work. The first time I drove through the mountains, I was in such an environment surrounded by mountains. I looked at the various projects under construction. I was a little excited, a little excited, and awkward. I am also full of expectation and confidence in my future internship in this project.
A week or so, I began to take over the relevant information. The first thing to do is to prepare the delivery archives according to the division of the sub-projects. The establishment of the supervision account is to uniformly register the supervision materials, so as to reduce the repeated preservation of the supervision materials without losing control. First, it is convenient to unify the compilation of supervision data and the collection of engineering and technical data of the project supervision departments of the company. It will not cause the inconsistency of engineering materials due to the differences in the quality of the staff of the high supervision office, or even the occurrence of out-of-synchronization, missing items, and loss. The problem. The second is to facilitate the inspection of the supervision work by the company and the relevant competent departments of the higher authorities, and also to facilitate the clarification of responsibilities. The third is to reduce duplication of waste, so this is the first step in collating data. However, due to the limited breadth of knowledge and lack of work experience, the term "bank account" was not very well understood. After receiving the task, it did not understand the division of some items, nor did it understand the format of the account, and it was impossible to start. At this time, I really realized what is low-handed and seemingly easy. It can't be done without practical operation, because the problem often manifests itself in the process of application. After consultation, I learned clearly. In the division of sub-items, it is divided into divisional projects, sub-projects, and sub-projects. These are not only related to the written accounts, but also related to future construction and data compilation. However, the first job of using this is to make accounting information, divide the divisional projects and sub-projects into items and items according to the specifications, and use excel to make inclusion items, items, handover time, handover person, delivery date, etc. The sub-item table is convenient for dividing the unified documents according to the sub-items and uniformly filling in the delivery time.
The next work is mainly to collect and organize the internal materials. Since before me, the finishing work of the information on the inside of the bidding section has been in a vacant situation, the data is relatively lagging, which is inconsistent with the actual completion of the engineering quantity. After I took over, I was still in a confused situation, because in the face of the mountains of data, I opened a few boxes and found that the information was a bit messy and I could not start. Specifically, the following problems exist:
1. In a piece of information, there is a lack of inspection data such as supervision assessment or leveling, template making. There are still leaks.
2. The data has not been completed according to the division of unit engineering, divisional engineering, and sub-projects, and the specifications are filled out, which is not conducive to measurement.
3. The information is incomplete, missing the date, lack of signature by the supervision engineer, lack of evaluation criteria, etc.
4. The data record lacks authenticity, the data does not match the traces, carelessness, and simple calculation errors.
5. The lack of record of concrete strength values.
Through these materials, I feel that there are so many problems in the information. I believe that it has a lot to do with the attitude of the supervisors. In the work, responsibility is very important. All the work is not the work of one person. It is a process of cooperation among all the supervisors. It is like an assembly line. The efficiency of each step and the quality of the products will affect the next step. In addition, take the supervisor next to the station, as an important means of project supervision, the supervision of the side station is getting more and more attention from the construction unit and the supervision unit. In the process of project supervision, the supervision of the station is also indispensable. The role of timely supervision and rectification of the construction process can avoid the quality and safety hazards of the project, and finally make the project quality meet the design and specification requirements, and ensure the quality of the project. However, during the internship process, it was found that there was a small amount of responsibility in the supervision of the side station, and the positioning was not clear enough. When doing the supervision next to the station record, some of the side station supervisors mostly record the after-effects, such records of the authenticity of the situation, and only through the recall, the record is also lacking, the record is not traceable. This led to a series of related problems after unknowingly accumulating. Therefore, we must do a good job in collecting and sorting out information. Personally, we must first solve the problem of attitude, strengthen education guidance, technical training, correct the attitude of the supervisors, and establish a spirit of cooperation.
After a period of familiarity, I can say that I have a certain understanding of the information. The intermediate work book I have done before has also laid a foundation for my current work, because I did not know it during the process. The division of some items of the project, and all the information, should be filled out according to the division of parts, filed. For example, the bridge is divided into an upper structure and a lower structure. In the upper structure, the prefabrication and installation of the beam and slab are mainly divided into foundation, pile foundation, pier column, tie beam, cap beam, sill and other structures in the lower structure. Things. We must follow the certain divisions to order these relevant archives in an orderly manner. Knowing the method, it takes a lot of patience to start with the information, and it must be very careful. This kind of thing is not very complicated, but it is trivial and time consuming. I have always been a very impatient person, and it is easy to ignore some small things. It is just that this internship is also an exercise for me and a cultivation of my character.
In addition to the work of the 13th Office of the Supervisory Office, my other job is the auxiliary work of the comprehensive office. The comprehensive work of this department is relatively strong. The supervision orders, the red-headed files are issued, the meeting records, the links between the subordinates and the construction units, the company, and the logistics work are all areas of our work. Although things are a bit more and a little troublesome, on the other hand, my ability to cope with unexpected situations has improved, my work has become more organized, my ability to interact with others has improved, and I have learned to adapt to the various people in society. More understanding of society.
In the internship work, I learned a lot. Similarly, I also learned a lot in my usual internship life.
The most important point is the improvement of self-consciousness. Integrity is a problem that is always worth pondering in all walks of life. In the supervision industry, the issue of clean government is a problem that cannot be ignored. I have been internship in the Wuying Project Department for such a long time and found that the promotion and implementation of this point is very good. From time to time, the comprehensive meeting will carry out a series of clean and honest work activities, and through effective means such as exhibition boards, publicity columns, supervision meetings, etc., always remind the Jianli personnel to maintain a clean working style. Through these activities, although we can't say that we can guarantee 100% of each person's integrity and law-abiding, at the very least, the ideology of each of us has improved. The clean government traffic starts from the leadership, starts from the team, starts from me. The spirit of the mind is kept in mind, so that the goal of the implementation of the entire supervision is not far off. In addition, I have learned a lot in terms of safety and environmental protection.
After half a year of internship, the past has passed. From the beginning, I hope that the change from the early end to the present ideological concept is only a short half year. I think that there is such a big change in thinking, which is inseparable from the growth and gains in the internship. This internship is a workout and a test. It is a process of learning, thinking, and working. It will be a cornerstone for me to really enter the social door and enter the job. With its knowledge and experience as the foundation, I believe that I will be more confident to achieve my goals!
recommended article
- Literature Search Course Comprehensive Internship Report
- College students' social practice report during the cold period
- National Teacher Internship Report
- University Youth Volunteers Summer Experience
- Metalworking Internship Summary Report
- Industrial Engineering Professional Production Internship Report
- 2014 Civil Engineering Understanding Internship Report
- Agricultural University Student Rural Social Practice Report
- College student internship report essay
- Tourism Professional Internship Report
- 2019 Auxiliary Machine Internship Report
- Environmental Engineering Understanding Internship Report
popular articles
- College entrance examination inspirational quotes
- Describe the fast time sentence 2019
- Construction Engineering Internship Report
- Administrative Management Internship Report
- I want to say something to the teacher.
- Strong words
- English famous words
- Sewage treatment plant internship report
- Metalworking Internship Summary Report
- Du Yuexi's famous sayings
- Stability Hospital Internship Report
- 2014 Civil Engineering Understanding Internship Report
- Tao Xingzhi's famous sayings
- Surveying and Mapping Engineering Internship Report
- 2014 is very touching words
- Thanks to the friend's words 2019
- The latest high school inspirational maxim
- [Boutique] Accounting Internship Report 3000 words
- Injured sentence
- [Boutique] police station internship report
- Teacher's famous saying
- Classical life motto
- Taizai’s famous sayings
- Bing Xin’s famous words
- a good saying that loves labor
- Deaf people jingle 2019
- Qq space mood phrase
- Korean swear words
- Sad love sentence 2019
- Market Marketing Internship Report Fan Wen