Interior Design Internship Report


I. Internship purpose
1. Understand the current situation and prospects of interior design in Texas.
2, further master the use of ps, 3dmax, cad and other design software.
3. Try to apply the theory of environmental art design learned in the school to the internship process.
4. Explore the methods of interior designers and familiarize yourself with the methods and procedures of interior design.
5. Develop interpersonal and social skills to prepare for becoming an interior designer.

II. Comprehensive overview of the internship unit “East Yisheng” was established in 1996. It has formed an absolute leading position in the domestic furniture industry in terms of scale, specialization, branding, grouping and industrialization. With the tenet of “making today's famous brand and creating a hundred-year enterprise”, Dongyi Risheng Group takes the Dongyi Risheng brand as the platform and the home industry chain as the main line, based on the high-end home decoration design and construction, materials and furniture and accessories. Supply, real estate real estate decoration design, national franchise brand development, industry professional research and analysis, etc., with deep global integration and resource optimization integration, build China's most competitive decoration industry and brand echelon Form a strategic system and pattern that is both inclusive.

Third, the internship content and progress first need to understand the program steps of the interior design:
1. Design preparation stage The design preparation stage mainly accepts the commissioned task book, signs the contract, or participates in the bidding according to the requirements of the tender; clarifies the design deadline and formulates the design schedule, and considers the coordination and coordination of the relevant types of work;
Defining design tasks and requirements, such as the nature of use of interior design tasks, functional characteristics, design scale, grade standards, total cost, indoor environmental atmosphere, cultural connotation or artistic style created according to the nature of the task;
Familiar with design-related specifications and quota standards, collect and analyze the necessary information and information, including on-site investigations and visits to the same type of examples.
When signing a contract or formulating a bidding file, it also includes the design schedule and the design rate standard, that is, the interior design collects the owner's design fee as a percentage of the total investment in the interior decoration.
2. Scheme design phase The project design phase is based on the design preparation phase. It further collects, analyzes and applies the information and information related to the design task, conceives ideas, conducts preliminary project design, in-depth design, and analyzes and compares the programs.
Identify the preliminary design and provide a design file. The files for the initial preliminary programme usually include:
Plan view, commonly used ratio 1:50, 1:100;
Indoor façade development map, commonly used ratio 1:20, 1:50;
Flat top or bottom view, commonly used ratio 1:50, 1:100;
Indoor perspective view;
The actual layout of the interior decoration material;
Design intent description and cost estimate;
The preliminary design plan needs to be validated before the construction drawing design can be carried out.
3. Construction drawing design stage The construction drawing design stage needs to supplement the drawings related to the plane layout, indoor façade and flat top necessary for the construction. It also needs to include the detailed details of the construction nodes, the detailed large sample drawings and the equipment pipeline map, and prepare the construction instructions and cost budget. .
4. Design implementation phase The design implementation phase is also the construction phase of the project. Before the construction of the indoor project, the designer shall make the technical intention of the design intention and the drawings to the construction unit; during the construction period, the construction shall be checked according to the requirements of the drawings, and sometimes the partial modification or supplement of the drawings shall be proposed according to the actual situation of the site; At the end, the project will be checked and accepted with the quality inspection department and the construction unit.

Secondly, I understand the interior design method. Master Zhao explained the following three types:
1, focus on the big, start at the fine, the overall and detailed in-depth evaluation
2. From the inside out, from the outside to the inside, the local and the overall coordination
3, the intention of the first pen or the intention of synchronization, both intention and expression

After careful scrutiny and practical use in the work, I found that the above three are really practical, and I have the feeling of listening to a ten-year book with those experienced designers. Once again, I mastered some design software tips and improved the proficiency of software application. For example, the two-dimensional background is a three-dimensional scene, the production of a time tunnel, and the like.